AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 35 of 38  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Sun Oct 31 07:29:17 2021, CB JM + RSS OG, Detectors mounted on plate in CARME 8x
Entry  Sun Oct 31 07:41:20 2021, CB JM + RSS, Wires plugged in DSSDs  8x
Entry  Sun Oct 31 07:55:39 2021, CB JM + OH, Strain relief mounted 20211028_190026.jpg20211028_192251.jpg20211028_192210.jpg
Entry  Tue Jun 17 12:22:50 2025, CB EW JG AG SN, Run 94/95/96 G35Voltage.pdf
Entry  Fri May 31 21:53:20 2024, CB EM, JM,EM AB, Overnight beam tests 17x
Entry  Sun Jun 16 13:51:11 2024, CB EM ML, Run 79 7x
Entry  Wed Feb 14 08:44:32 2024, CB AR JM, Motors test and turbo ON 11x
Entry  Wed Feb 14 14:06:28 2024, CB AR JM, Pulser Walkthrough 
Entry  Mon Jun 16 21:58:00 2025, CB AR, Runs 84-89 
Entry  Wed Jun 19 12:08:34 2024, CB + various, Run 101-105 
Entry  Wed Jun 19 12:04:02 2024, CB + OF, SS, Run 96/97 
Entry  Wed Nov 24 12:08:08 2021, CB + ML OG, Ion pumps on vacplot24.pngvacplot.pngCARMEtemps.png
Entry  Mon Nov 1 14:48:16 2021, CB + ML DR, CARME opened 
Entry  Tue Nov 23 08:49:33 2021, CB + ML, NEG activation completed vacplot24.pngCARMEtemps.pngvacplot24-1.pngCARMEtemps-1.png
Entry  Tue Nov 2 12:45:36 2021, CB + DR NK, Issues with CARME feet 20211102_134446.jpg
Entry  Wed Sep 29 09:27:38 2021, CB (remotely), RSS JM ML, Power cut 
Entry  Tue Sep 15 08:39:26 2020, CB (remotely), JM, Baking and Chamber status  20200915_0842_ctrl.png20200915_0842_temp.png20200915_152708.jpgimage007.jpg20200915_1920_temps.png
Entry  Mon Oct 5 08:21:40 2020, CB (remotely), JM, First bake of CARME with pumps (cont.) 6x
Entry  Fri Nov 26 10:01:45 2021, CB (remotely) ML, Power cut in the CRYRING cave 
Entry  Tue Nov 30 10:49:43 2021, CB (remotely) GV, Gate valve opened vacplot24.png
ELOG V3.1.4-unknown