AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 35 of 38  ELOG logo
Entry  Tue Feb 22 05:12:38 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54  11x
Entry  Mon Feb 21 17:26:19 2022, JM, CB, SHB, OH (remotely), Beam ON run 53 9x
Entry  Sat Feb 19 20:08:43 2022, JM, CB, Beam ON run 49 6x
Entry  Tue Mar 1 23:43:15 2022, David, George, Beam Intensity Drop 
Entry  Mon Jun 10 07:40:47 2024, RSS, DB, Beam 
Entry  Mon Jan 10 20:52:53 2022, JM, TD, OH, Baking tent removed, VI tests 20220110_175547.jpg20220110_175811.jpgvi-curve.png
Entry  Fri Jul 21 08:21:54 2023, TD, RSS, Baking tent manual CARME-baking-guide_(1).pdf
Entry  Thu Aug 10 07:51:43 2023, JM, Baking tent and heater testing 8x
Entry  Wed Sep 16 08:52:03 2020, CB (remotely), Baking status 16-17 September 20200916_0850_temps.png20200916_0850_ctrl.png20200916_1500_temps.png20200916_2022_temps.png20200917_0820_temps.png
Entry  Mon Sep 14 12:07:40 2020, JM, CB (remotely), Baking status 20200914_1207_temps.png20200914_1207_ctrl.png20200914_1727_temps.png20200914_2000_temps.png
Entry  Fri Sep 18 10:28:57 2020, JM, CB(remotely), Baking status 20200918_1029_temps.png
Entry  Sat Sep 26 09:31:46 2020, JM, CB (both remotely), Baking over weekend temps.pngtemps2.pngHeaters.jpg20200927_1732_temps.png
Entry  Sun Sep 13 08:06:25 2020, CB (remotely), Baking over the weekend -2 20201309_0806_ctrl.png20201309_0806_plot.png
Entry  Sat Sep 12 08:38:52 2020, CB (remotely), Baking over the weekend 20200912_0839_ctrl.png20200912_0839_plot.png
Entry  Tue Sep 15 08:39:26 2020, CB (remotely), JM, Baking and Chamber status  20200915_0842_ctrl.png20200915_0842_temp.png20200915_152708.jpgimage007.jpg20200915_1920_temps.png
Entry  Sun Sep 19 09:11:34 2021, CB (remotely), Baking RasPi status 
Entry  Mon Sep 27 17:53:35 2021, JM RSS , Baking Jacket upgrade + NEG controllers connected 20210927_151650.jpg20210927_151706.jpg20210927_151721.jpg20210927_170139.jpg
Entry  Fri Sep 24 08:47:36 2021, JM RSS CB(Remotely), Baking  
Entry  Mon Sep 28 13:04:27 2020, JM, Baking 20200928_081831.jpg20200928_130239.jpg
Entry  Fri Sep 4 15:48:25 2020, JM, Bakeout test completed 191214004923_temperatures.txtBakeout1.png
ELOG V3.1.4-unknown