Thu Sep 2 21:04:26 2021, CB RSS ML + DR OG, Gate valves mounted + pump down 6x
|
Mounted both gate valves and support. Gate
valves could not be installed one bolt
rotated from 90 degrees as per drawings
|
Thu Sep 2 10:41:16 2021, CB RSS + DR OG, CARME connected to the CRYRING
|
Connected CARME to the CRYRING via tube
plus bellows. See attach.
|
Wed Sep 1 17:14:16 2021, CB RSS + DR ML, CARME mounted on the CRYRING    
|
Lifted CARME with Al support on the
CRYRING. No issues during transportation.
|
Wed Sep 1 12:05:28 2021, CB RSS, Preparation for CARME on CRYRING YR09 
|
Mounted additional cross member for motor
support. See attach 1
|
Tue Aug 31 18:56:35 2021, CB, CARME status 9x
|
(ELOG does not allow more pictures to be added to previous entry) |
Tue Aug 31 18:34:41 2021, CB RSS + DR OG, CARME on Al stand    
|
Lifted CARME off the floor and mounted feet on sides. It was found impossible to put four bolts for each foot
due to alignment conflict. Three bolts were mounted per foot instead.
|
Tue Aug 31 11:55:11 2021, CB RSS, Last preparations for CARME lift 
|
Found strut bolts in the bag with
spherical washers. Mounted the struts and
the washers. See attach 1.
|
Tue Aug 31 07:09:54 2021, CB RSS (rem) JM, Preparation for mounting 6x
|
(30 August 2021)
The current state of YR09 is as per attach 1. CCC has been removed, but additional pumps and gauges remain. Some
|
Wed Aug 25 07:02:41 2021, RSS TD, 25-31 August 19x
|
Pirani IE514
mbar mbar
25/8/21 08:00 0.0030 1.86e-8
----------------------------------------------------
26/8/21 09:00 0.0030 1.77e-8
---------------------------------------------------- |
Wed Aug 18 11:58:49 2021, NTD RSS, Misc fittings and fasteners plus gasket inventory 22x
|
Attachments 1-3 fasteners, fittings found amongst earlier shipments. I assume that the STFC DL cleaned items are for the internal detector mount assembly.
|
Wed Aug 18 07:07:26 2021, RSS TD, 18-24 August 25x
|
Pirani IE514
mbar mbar
18/8/21 08:00 0.0034 3.90e-8
18/8/21 17:00 0.0032 3.72e-8
-------------------------------------------------------------
19/8/21 08:00 0.0032 3.38e-8 |
Fri Aug 13 07:28:37 2021, RSS TD, Friday 13-17 August 23x
|
Pirani IE514
mbar mbar
|
Thu Aug 12 09:16:42 2021, TD RSS, Thursday 12 August 13x
|
Attachment 1 - IE414/514 feedthrough wiring diagram
|
Wed Aug 11 12:30:40 2021, TD RSS, Wednesday 11 August 8x
|
Attachments 1 & 2 - 2x SAES D-2000 re-fitted to side ports
all 4x SAES D-2000 now re-fitted to chamber
|
Tue Aug 10 12:22:56 2021, TD RSS, Tuesday 10 August  
|
Attachments 1-3 - 2 of 4 SAES D2000 installed at same ports used for STFC DL XHV tests |
Mon Aug 9 12:36:00 2021, TD, RSS, ABD, Monday 9 August 7x
|
Attachments 1-5 - CARME shipment in CRYRING hall
XHV chambers nearest to YR09
|
Mon Dec 7 14:29:12 2020, JM, CARME packing up  
|
|
Fri Dec 4 16:49:36 2020, TD, Friday 4 December 7x
|
|
Wed Nov 25 10:39:37 2020, TD, Wednesday 25 November 7x
|
10.39
|
Tue Nov 24 12:24:01 2020, JM, RGA scans
|
RGA laptop passcode: tw%11&STA-
RGA scans set up and plotting data as of 11:44
RGA is set to the multiplier mode (4.44e-8mbar) with an accuracy setting of 8, these are for the most sensitive scans. RGA is set to scan masses |