AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 5 of 37  ELOG logo
  ID Date Author Subjectdown Text Attachments
  543   Tue Apr 23 17:44:41 2024 TDTuesday 23 April
18.43 ASIC settings 2024Feb08-15.59.09
 12x 
  18   Wed Sep 23 13:34:04 2020 JMTuesday 22 SeptemberTurbo-pump Issue approximately 13:00 22/9/20.

While moving the baking octagon
into position, the power connector became
  
  679   Tue Apr 22 06:44:02 2025 TDTuesday 22 April
07.40 DSSSD bias & leakage current - attachments
1-3
 Screenshot_from_2025-04-22_07-40-45.pngScreenshot_from_2025-04-22_07-41-10.pngScreenshot_from_2025-04-22_07-47-25.png1.png2.png 
  469   Tue Jan 16 08:57:44 2024 JG, DR, TDTuesday 16 January10.00 Outflow manifold returned from workshop
with leaking attachment point welding re-worked.
 8x 
  39   Tue Aug 10 12:22:56 2021 TD RSSTuesday 10 August
Attachments 1-3 - 2 of 4 SAES D2000 installed
at same ports used for STFC DL XHV tests
 20210810_115555.jpg20210810_115607.jpg20210810_115617.jpg 
  115   Sat Oct 9 09:47:33 2021 CBTo do list for next week0. Give split-funnels to OG or Grossmontage
to clean. Mount back foot support for gate
valves. Critical when we split.
 Capture.PNG 
  447   Thu Sep 28 09:19:50 2023 TDThursday 28 September
10.20 CARME IE514 8.6e-11 mbar
 1000007142.jpg1000007143.jpg 
  546   Thu Apr 25 02:31:25 2024 TDThursday 25 April
03.27 DAQ continues - file APR24/R1_7
 39x 
  20   Thu Sep 24 10:04:58 2020 JM, TDThursday 24 September
Following overnight pumping by Leybold turbo
pump
 20200924_152852.jpgPhotos.zip 
  28   Thu Oct 22 10:39:40 2020 TDThursday 22 October
10.40
 19x 
  475   Thu Jan 18 17:21:00 2024 TDThursday 18 JanuaryNetwork ( dhcpd.conf ) and MIDAS startup.tcl/Options/ASIC
settings/rfs filesystems configured
 Capture.PNG 
  541   Thu Apr 18 13:34:06 2024 TD, JGThursday 18 April
14.30 
 13x 
  123   Thu Oct 14 15:54:47 2021 TD RSSThursday 14 OctoberAttachment 1 - what is function of the 4x
c/s holes indicated?
 IMG_5056.JPG.jpgIMG_5053.JPG 
  41   Thu Aug 12 09:16:42 2021 TD RSSThursday 12 August
Attachment 1 - IE414/514 feedthrough wiring
diagram
 13x 
  8   Thu Sep 10 11:34:30 2020 TD, JMThursday 10 September All neg feed-throughs have now been fully
installed, with ground tags 
and power wires crimped and attached to the
 20200910_112152.jpg20200910_112211.jpgPhotos_(1).zip 
  672   Thu Apr 10 10:53:14 2025 TDThursday 10 April11.50 DAQ continues
      Data file APR25/R6_13
 8x 
  383   Thu Dec 1 08:56:59 2022 AR TDThursday 1 December Photos of noise observed at each of the
AIDA PSU outputs by digital oscillscope.

DAQ GOing with waveforms enabled.
 11x 
  733   Tue Jun 10 13:29:23 2025 EW, CB, JMThresholds changed Experimented with slow comparator thresholds
as we go down to lower beam energies

Checked deadlayer loses with SRIM,
 Screenshot_from_2025-06-10_14-35-07.pngScreenshot_from_2025-06-10_14-34-59.pngScreenshot_from_2025-06-10_14-34-49.pngScreenshot_from_2025-06-10_14-34-17.png 
  557   Wed May 29 09:49:35 2024 JM, CBThreshold changes / D+ beam09:00

R4 alpha background continues,
currently R4_12
 Screenshot_from_2024-05-29_11-00-20.pngScreenshot_from_2024-05-29_11-01-30.pngScreenshot_from_2024-05-29_11-01-47.pngScreenshot_from_2024-05-29_11-02-03.png 
  430   Thu Jul 27 09:43:56 2023 RSSThermocouples connected -2
10:30  IE514 1.80e-08mbar

Most
of the CARME is covered by the baking tent.
The tent needs to be closed and a bit covered
 IMG_9920.jpgIMG_9919.jpg 
ELOG V3.1.4-unknown