543
|
Tue Apr 23 17:44:41 2024 |
TD | Tuesday 23 April |
18.43 ASIC settings 2024Feb08-15.59.09
|
12x |
|
18
|
Wed Sep 23 13:34:04 2020 |
JM | Tuesday 22 September | Turbo-pump Issue approximately 13:00 22/9/20.
While moving the baking octagon
into position, the power connector became |
|
|
679
|
Tue Apr 22 06:44:02 2025 |
TD | Tuesday 22 April |
07.40 DSSSD bias & leakage current - attachments
1-3
|
    |
|
469
|
Tue Jan 16 08:57:44 2024 |
JG, DR, TD | Tuesday 16 January | 10.00 Outflow manifold returned from workshop
with leaking attachment point welding re-worked.
|
8x |
|
39
|
Tue Aug 10 12:22:56 2021 |
TD RSS | Tuesday 10 August |
Attachments 1-3 - 2 of 4 SAES D2000 installed
at same ports used for STFC DL XHV tests |
  |
|
115
|
Sat Oct 9 09:47:33 2021 |
CB | To do list for next week | 0. Give split-funnels to OG or Grossmontage
to clean. Mount back foot support for gate
valves. Critical when we split. |
|
|
447
|
Thu Sep 28 09:19:50 2023 |
TD | Thursday 28 September |
10.20 CARME IE514 8.6e-11 mbar
|
 |
|
546
|
Thu Apr 25 02:31:25 2024 |
TD | Thursday 25 April |
03.27 DAQ continues - file APR24/R1_7
|
39x |
|
20
|
Thu Sep 24 10:04:58 2020 |
JM, TD | Thursday 24 September |
Following overnight pumping by Leybold turbo
pump
|
 |
|
28
|
Thu Oct 22 10:39:40 2020 |
TD | Thursday 22 October |
10.40
|
19x |
|
475
|
Thu Jan 18 17:21:00 2024 |
TD | Thursday 18 January | Network ( dhcpd.conf ) and MIDAS startup.tcl/Options/ASIC
settings/rfs filesystems configured
|
|
|
541
|
Thu Apr 18 13:34:06 2024 |
TD, JG | Thursday 18 April |
14.30
|
13x |
|
123
|
Thu Oct 14 15:54:47 2021 |
TD RSS | Thursday 14 October | Attachment 1 - what is function of the 4x
c/s holes indicated?
|
 |
|
41
|
Thu Aug 12 09:16:42 2021 |
TD RSS | Thursday 12 August |
Attachment 1 - IE414/514 feedthrough wiring
diagram
|
13x |
|
8
|
Thu Sep 10 11:34:30 2020 |
TD, JM | Thursday 10 September | All neg feed-throughs have now been fully
installed, with ground tags
and power wires crimped and attached to the |
  |
|
672
|
Thu Apr 10 10:53:14 2025 |
TD | Thursday 10 April | 11.50 DAQ continues
Data file APR25/R6_13
|
8x |
|
383
|
Thu Dec 1 08:56:59 2022 |
AR TD | Thursday 1 December | Photos of noise observed at each of the
AIDA PSU outputs by digital oscillscope.
DAQ GOing with waveforms enabled. |
11x |
|
733
|
Tue Jun 10 13:29:23 2025 |
EW, CB, JM | Thresholds changed | Experimented with slow comparator thresholds
as we go down to lower beam energies
Checked deadlayer loses with SRIM, |
   |
|
557
|
Wed May 29 09:49:35 2024 |
JM, CB | Threshold changes / D+ beam | 09:00
R4 alpha background continues,
currently R4_12 |
   |
|
430
|
Thu Jul 27 09:43:56 2023 |
RSS | Thermocouples connected -2 |
10:30 IE514 1.80e-08mbar
Most
of the CARME is covered by the baking tent.
The tent needs to be closed and a bit covered |
 |