AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 5 of 38  ELOG logo
Entry  Tue Sep 26 08:08:42 2023, TD, Tuesday 26 September 7x
09.07 IE514 pressure 6.4e-11 mbar, ambient temperature +20.3 deg C

      Using appc218 ( account carme ) workstation by the CARME 19" rack 
Entry  Tue Apr 23 17:44:41 2024, TD, Tuesday 23 April 12x

18.43 ASIC settings 2024Feb08-15.59.09
Entry  Wed Sep 23 13:34:04 2020, JM, Tuesday 22 September 
Turbo-pump Issue approximately 13:00 22/9/20.

While moving the baking octagon into position, the power connector became disconnected from the turbo pump. The pump controller provided the
warnings of connector failure and high pump load (probably due to it reading the frequency of the pump as 0 Hz when disconnected and thinking this was
Entry  Tue Apr 22 06:44:02 2025, TD, Tuesday 22 April Screenshot_from_2025-04-22_07-40-45.pngScreenshot_from_2025-04-22_07-41-10.pngScreenshot_from_2025-04-22_07-47-25.png1.png2.png

07.40 DSSSD bias & leakage current - attachments 1-3
       CAEN logger program crashed c. 18.00 April 20 - now restarted
Entry  Tue Jan 16 08:57:44 2024, JG, DR, TD, Tuesday 16 January 8x
10.00 Outflow manifold returned from workshop with leaking attachment point welding re-worked.

11.30 Outflow hoses re-attached to outflow manifold. Faulty male Swagelok replaced.
Entry  Tue Aug 10 12:22:56 2021, TD RSS, Tuesday 10 August  20210810_115555.jpg20210810_115607.jpg20210810_115617.jpg

Attachments 1-3 - 2 of 4 SAES D2000 installed at same ports used for STFC DL XHV tests
Entry  Sat Oct 9 09:47:33 2021, CB, To do list for next week Capture.PNG
0. Give split-funnels to OG or Grossmontage to clean. Mount back foot support for gate valves. Critical when we split.

1. Wait for vacuum division to come to install: IE514 cables to current CM52 module, ion pump cables + controls + turn on, RGA head + program
+ turn on
Entry  Thu Sep 28 09:19:50 2023, TD, Thursday 28 September 1000007142.jpg1000007143.jpg

10.20 CARME IE514 8.6e-11 mbar
Entry  Thu Apr 25 02:31:25 2024, TD, Thursday 25 April 39x

03.27 DAQ continues - file APR24/R1_7
Entry  Thu Sep 24 10:04:58 2020, JM, TD, Thursday 24 September 20200924_152852.jpgPhotos.zip

Following overnight pumping by Leybold turbo pump
Entry  Thu Oct 22 10:39:40 2020, TD, Thursday 22 October 19x

10.40
Entry  Thu Jan 18 17:21:00 2024, TD, Thursday 18 January Capture.PNG
Network ( dhcpd.conf ) and MIDAS startup.tcl/Options/ASIC settings/rfs filesystems configured

Entry  Thu Apr 18 13:34:06 2024, TD, JG, Thursday 18 April 13x

14.30 
Entry  Thu Oct 14 15:54:47 2021, TD RSS, Thursday 14 October IMG_5056.JPG.jpgIMG_5053.JPG
Attachment 1 - what is function of the 4x c/s holes indicated?

Entry  Thu Aug 12 09:16:42 2021, TD RSS, Thursday 12 August 13x

Attachment 1 - IE414/514 feedthrough wiring diagram
Entry  Thu Sep 10 11:34:30 2020, TD, JM, Thursday 10 September  20200910_112152.jpg20200910_112211.jpgPhotos_(1).zip
All neg feed-throughs have now been fully installed, with ground tags 
and power wires crimped and attached to the correct pins. Feed-throughs 
are installed as seen in Image 
Entry  Thu Apr 10 10:53:14 2025, TD, Thursday 10 April 8x
11.50 DAQ continues
      Data file APR25/R6_13
Entry  Thu Dec 1 08:56:59 2022, AR TD, Thursday 1 December  11x
Photos of noise observed at each of the AIDA PSU outputs by digital oscillscope.

DAQ GOing with waveforms enabled.

Connection from AIDA PSU to scope by DMM test probes, twisted cabling, 3mm jack plug/BNC adaptor.
Entry  Tue Jun 10 13:29:23 2025, EW, CB, JM, Thresholds changed  Screenshot_from_2025-06-10_14-35-07.pngScreenshot_from_2025-06-10_14-34-59.pngScreenshot_from_2025-06-10_14-34-49.pngScreenshot_from_2025-06-10_14-34-17.png
Experimented with slow comparator thresholds as we go down to lower beam energies

Checked deadlayer loses with SRIM, expected ruthford energies are as follows:

150keV/u -> 230keV
Entry  Wed May 29 09:49:35 2024, JM, CB, Threshold changes / D+ beam Screenshot_from_2024-05-29_11-00-20.pngScreenshot_from_2024-05-29_11-01-30.pngScreenshot_from_2024-05-29_11-01-47.pngScreenshot_from_2024-05-29_11-02-03.png
09:00

R4 alpha background continues, currently R4_12

Temps OK, system checks unchanged from previous status (OK, aida16 clock and ADC issue)