348
|
Tue Mar 1 12:58:32 2022 |
CB, MS, SS, ML | Synced pneumatic motion | New run R84
Attempting to sync pneumatic movement
with ring. Still see something on t out -> |
|
|
664
|
Sun Apr 6 10:17:49 2025 |
TD | Sunday 6 April |
11.15 CARME IE514 ion gauge remains OFF
ML says there are 2x ion gauges with |
15x |
|
549
|
Sat Apr 27 23:16:02 2024 |
TD | Sunday 28 April |
00.12 DAQ continues data file R3_15
|
37x |
|
304
|
Sun Feb 27 12:49:44 2022 |
TD RSS | Sunday 27 February 07:00-15:00 |
13.50 Cryostat set point 120K
|
6x |
|
526
|
Sun Feb 18 13:10:18 2024 |
TD | Sunday 18 February - DSSSD 0 aida01 and aida04 *.*.L spectra |
DSSSD 0 aida01 1*L spectra, aida04 **L spectra
|
    |
|
126
|
Sun Oct 17 11:48:48 2021 |
TD RSS | Sunday 17 October | Looking downstream the RHS motor assembly
has loose green/yellow (gnd?) see attachment
1
|
14x |
|
400
|
Sun May 14 11:55:12 2023 |
TD | Sunday 14 May | 12.44 DSSSD#3 bias -149.95V leakage current
-6.448uA temperature +19.7 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php
)
|
|
|
378
|
Sun Aug 14 06:50:58 2022 |
TD, JM | Sunday 14 August |
07.51 DAQ continues files 22Feb/R97
|
10x |
|
506
|
Sun Feb 11 07:03:34 2024 |
TD | Sunday 11 February |
02.02 DAQ continues G22-86/R15_21
alpha background
|
20x |
|
450
|
Sun Oct 1 10:24:50 2023 |
TD | Sunday 1 October | 11.20 CARME IE514 3.53e-9 mbar, ambient temperature
20.6 deg C
|
12x |
|
404
|
Fri May 26 08:53:54 2023 |
JM, CB | Strain reliefs (flange side) installed | Strain reliefs on the flange side of the
cable harness have been installed for two
detectors (top right and bottom right detectors). |
   |
|
402
|
Wed May 24 08:35:12 2023 |
JM, CB | Strain reliefs (detector side) installed | The new MACOR strain reliefs on the (detector
side) have been installed. See attached photos
The two pieces of MACOR are |
    |
|
136
|
Sun Oct 31 07:55:39 2021 |
CB JM + OH | Strain relief mounted | (Thu 28 October)
All strain relief extension plates
mounted behind the wires, using SS countersunk |
  |
|
62
|
Tue Sep 7 14:10:02 2021 |
CB RSS + OG | Strain relief SS support re-drilled | Re-drilled SS supports in order to fit M3
screws.
|
|
|
509
|
Tue Feb 13 08:34:44 2024 |
Hw, JM, AR, CB, NP, AB, RSS | Status of DAQ - beam overlap | Check the status of the DAQ system, with
Tom. All correct. See attachments:
1 Leackage currents |
10x |
|
621
|
Wed Jun 12 07:16:47 2024 |
RSS, YL, JM, TD, CB | Status | 07:56 Gleb has taken the beam to try settings
for the 5+ charge state. As soon as the target
is ready, the 1+ charge state will be given |
6x |
|
553
|
Mon May 27 15:25:08 2024 |
JM | Startup | 27/05/24
The carme-gsi computer has been
moved from the server room into the shifter |
|
|
288
|
Sat Feb 26 22:22:27 2022 |
David, Pierre-Michell | Starting to take data | At 23:22 we started recording data under
the new conditions.
Merger, Tape server (WS3): |
11x |
|
453
|
Sun Oct 15 09:35:03 2023 |
CB | Starting ramp down | 10:40 - Status as attached. Heaters setpoint/read
at 250 C, 150 C, 225 C. Power stable at 53%,
41%, 63% |
 |
|
122
|
Wed Oct 13 15:28:22 2021 |
RSS TD + OG | Split funnels | Split funnels installed on 4 (of 8) 2x78
way D connector feed-throughs. |
7x |