AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 7 of 38  ELOG logo
ID Date Author Subjectdown Text Attachments
  348   Tue Mar 1 12:58:32 2022 CB, MS, SS, MLSynced pneumatic motionNew run R84

Attempting to sync pneumatic movement
with ring. Still see something on t out ->
  
  664   Sun Apr 6 10:17:49 2025 TDSunday 6 April
11.15 CARME IE514 ion gauge remains OFF
      ML says there are 2x ion gauges with
 15x 
  549   Sat Apr 27 23:16:02 2024 TDSunday 28 April
00.12 DAQ continues data file R3_15
 37x 
  304   Sun Feb 27 12:49:44 2022 TD RSSSunday 27 February 07:00-15:00
13.50 Cryostat set point 120K
 6x 
  526   Sun Feb 18 13:10:18 2024 TDSunday 18 February - DSSSD 0 aida01 and aida04 *.*.L spectra
DSSSD 0 aida01 1*L spectra, aida04 **L spectra
 Screenshot_from_2024-02-18_13-58-29.pngScreenshot_from_2024-02-18_13-59-55.pngScreenshot_from_2024-02-18_14-01-19.pngScreenshot_from_2024-02-18_14-08-36.pngScreenshot_from_2024-02-18_14-09-44.png 
  126   Sun Oct 17 11:48:48 2021 TD RSSSunday 17 OctoberLooking downstream the RHS motor assembly
has  loose green/yellow (gnd?) see attachment
1
 14x 
  400   Sun May 14 11:55:12 2023 TDSunday 14 May12.44 DSSSD#3 bias -149.95V leakage current
-6.448uA temperature +19.7 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php
)
  
  378   Sun Aug 14 06:50:58 2022 TD, JMSunday 14 August
07.51 DAQ continues files 22Feb/R97
 10x 
  506   Sun Feb 11 07:03:34 2024 TDSunday 11 February
02.02 DAQ continues G22-86/R15_21
      alpha background
 20x 
  450   Sun Oct 1 10:24:50 2023 TDSunday 1 October11.20 CARME IE514 3.53e-9 mbar, ambient temperature
20.6 deg C
 12x 
  404   Fri May 26 08:53:54 2023 JM, CBStrain reliefs (flange side) installedStrain reliefs on the flange side of the
cable harness have been installed for two
detectors (top right and bottom right detectors). 
 strain-relief-flange-side.jpgstrain-relief1_(1).mp420230526_140923.jpgV-I-plot.png 
  402   Wed May 24 08:35:12 2023 JM, CBStrain reliefs (detector side) installedThe new MACOR strain reliefs on the (detector
side) have been installed. See attached photos

The two pieces  of MACOR are
 20230524_092010.jpg20230524_092017.jpg20230524_092101.jpg20230524_093000.jpg20230524_092159.mp4 
  136   Sun Oct 31 07:55:39 2021 CB JM + OHStrain relief mounted(Thu 28 October)

All strain relief extension plates
mounted behind the wires, using SS countersunk
 20211028_190026.jpg20211028_192251.jpg20211028_192210.jpg 
  62   Tue Sep 7 14:10:02 2021 CB RSS + OGStrain relief SS support re-drilledRe-drilled SS supports in order to fit M3
screws.
  
  509   Tue Feb 13 08:34:44 2024 Hw, JM, AR, CB, NP, AB, RSSStatus of DAQ - beam overlapCheck the status of the DAQ system, with
Tom. All correct. See attachments:

1 Leackage currents
 10x 
  621   Wed Jun 12 07:16:47 2024 RSS, YL, JM, TD, CBStatus07:56 Gleb has taken the beam to try settings
for the 5+ charge state. As soon as the target
is ready, the 1+ charge state will be given
 6x 
  553   Mon May 27 15:25:08 2024 JMStartup27/05/24

The carme-gsi computer has been
moved from the server room into the shifter
  
  288   Sat Feb 26 22:22:27 2022 David, Pierre-MichellStarting to take dataAt 23:22 we started recording data under
the new conditions.

Merger, Tape server (WS3):
 11x 
  453   Sun Oct 15 09:35:03 2023 CBStarting ramp down10:40 - Status as attached. Heaters setpoint/read
at 250 C, 150 C, 225 C. Power stable at 53%,
41%, 63%
 Screenshot_2023-10-15_10-35-47.pngScreenshot_2023-10-15_17-56-00.png 
  122   Wed Oct 13 15:28:22 2021 RSS TD + OGSplit funnelsSplit funnels installed on 4 (of 8) 2x78
way D connector feed-throughs.
 7x 
ELOG V3.1.4-unknown