  519   Fri Feb 16 10:02:41 2024 JM, OF, CB, AR, EMRun 35 - cooled beam on target11:01

Run 35 started cooled beam on target

Detectors IN (left arm pot =36.5
 27x 
  518   Thu Feb 15 21:07:00 2024 JM, AB, AR, OFRun33 - cooled beam on target22:27

Run 33 started cooled beam on target.

Detectors IN (left arm pot =36.5
 22x 
  517   Thu Feb 15 13:18:30 2024 JGMBS DAQ: target & ring valuesWe are running an MBS DAQ to record the
attached list of slow control values of the
ring and the target. In most cases this is
 2024_jet_daq.txt 
  516   Thu Feb 15 12:40:52 2024 JM. CB, AR, ABRun30 - uncooled beam on targetRun started 13:40

Target density 4.3e11, Beam injection
is ~1e7, Pressure in the ring is ~1e-10 mbar.
 29x 
  515   Thu Feb 15 10:39:50 2024 JM, JG, ML, AG, CBRun29 - beam optimisation11:27

Run 29 started. Beam energy is
1.3435 MeV/u with a cooler voltage of 751.3
  
  514   Wed Feb 14 16:52:46 2024 JM, AR, CB, JGRun28 - beam on target  

Beam energy - 1.361 MeV/u

17:12
 42x 
  513   Wed Feb 14 14:59:13 2024 JM, CB, NP, ML, AG, ABRun 27 -Beam on target optimisationRun 27 Started to check optimsation of
the beam - target overlap.

Beam intensity at injection is
 Target-overlap-scan-optimized.pdf 
  512   Wed Feb 14 14:06:28 2024 CB AR JMPulser Walkthrough
15:06
Run25

Pulser walkthrough

EGG
Ortec 448 Pulser

Amplitide 90,000-10,000
@ 10,000 step
Normalise 5.0
Attenuators
  
  511   Wed Feb 14 08:44:32 2024 CB AR JMMotors test and turbo ONRun number changed 09:44 - Now run 23

Moving motors with the injection

Ring signal very weird, moving
 11x 
  510   Tue Feb 13 17:19:43 2024 JM, AR, NP, AB, RSSRun22 - cooled beam on target (definitely maybe)18:05 We believe we have an overlap between
the beam and the target. Run 22 started.

         
 48x 
  509   Tue Feb 13 08:34:44 2024 Hw, JM, AR, CB, NP, AB, RSSStatus of DAQ - beam overlapCheck the status of the DAQ system, with
Tom. All correct. See attachments:

1 Leackage currents
 10x 
  508   Mon Feb 12 01:40:48 2024 TD, JM, CB, AR, RSSRun17 - Run20
02.35 DAQ continues file G22-88/R17_30
 49x 
  507   Sun Feb 11 13:28:46 2024 JM, CB, TDRun16 - beam on target13:37 Run started - no beam in the ring
(One of the ring magnets was still on RED
when it should have been set to green by
 30x 
  506   Sun Feb 11 07:03:34 2024 TDSunday 11 February
02.02 DAQ continues G22-86/R15_21
      alpha background
 20x 
  505   Sat Feb 10 17:05:13 2024 TDRun 15 - background
17.55 DAQ continues G22-86/R15_11
      alpha background
 20x 
  504   Sat Feb 10 10:00:44 2024 AR RSS JM CBRun 13, 14System checks: all ok

Attatchment 1: Rates ok

Attatchment 2: Temperatures ok
 23x 
  503   Fri Feb 9 17:04:39 2024 JM, AR, CB, NHRun12 - Background    
  502   Fri Feb 9 11:58:04 2024 TD + CB, JM, AR, NH, ABRun10 contd, Run11
12.46 DAQ continues G22-88/R10_14
 27x 
  501   Fri Feb 9 07:57:38 2024 AR, CB, AB, JMRun10 - First cool beam on target8:58

System wide checks okay, except

   
 27x 
  500   Thu Feb 8 17:11:50 2024 CB, EHPulser walkthrough
17:30 File G22-88/R8

Pulser walkthrough

EGG
Ortec 448 Pulser

Amplitide 90,000-10,000
@ 10,000 step
Normalise 5.0
Attenuators
 4.png3.png 