AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CIRCE, Page 1 of 4  ELOG logo
ID Date Author Subject Text Attachments
  78   Tue Feb 18 14:39:26 2020 Thomas ChilleryTarget ThicknessesExcel spreadsheet showing CH2 and natC
target thicknesses attached
 Target_List.xls 
  77   Wed Sep 18 14:01:13 2019 Thomas ChilleryLogbook SpreadsheetSee attached for the logbook  181123_Logbook.xls 
  76   Tue Dec 4 11:23:29 2018 Thomas ChilleryChamber DimensionsSee attached pictures for measurements
of the 7Be(p,p) chamber dimensions.

The target ladder center - Far
 IMG_3397.JPGIMG_3398.JPGIMG_3399.JPG 
  75   Tue Dec 4 09:40:31 2018 Thomas ChilleryPreliminary measurements of target activation using geiger counterOn 29/11/2018 at 17:40 a rough measurement
of the irradiated target activity was performed
using a geiger counter.
  
  74   Tue Dec 4 09:38:18 2018 Thomas Chillery181122 Electronics MapSee attached for S2 electronics map, following
channels from S2 outputs to ADC inputs

For the 19/11/2018 - 29/11/2018
 181122_Electronics_Channel_Map.ods181122_Electronics_Channel_Map.xls 
  73   Mon Dec 3 19:04:20 2018 Thomas Chillery, Raffaele BuompaneEnd of beamtime - Items to be shipped back to EdinburghTo be shipped back to Edinburgh for repair:





Item
  
  72   Mon Dec 3 18:55:31 2018 Thomas Chillery, Raffaele BuompaneEnd of beamtime - CleanupOn 29/11/2018:

Dismounted S2 2323-18 (496um),
12um mylar, diode, and diodes 0.9um mylar.
 8x 
  71   Mon Dec 3 18:45:17 2018 Thomas Chillery, Raffaele BuompaneEnd of beamtime - Module settingsDiode Ortec 571 Amplifier Settings:


Fine gain: 10 (0.5 ->1.5)
Course
gain: 50
Shaping time: 0.5us
BLR
  
  70   Mon Dec 3 18:30:53 2018 Thomas Chillery, Raffaele BuompaneCalibration with alpha source - 12um mylar on Far S2On 28/11/2018:

Mounted 12um mylar in front of
far S2 - see attached pictures 1 and 2
 IMG_3356.JPGIMG_3363.JPG181128184505_ADC1_Ch9.png 
  69   Mon Dec 3 18:15:42 2018 Thomas Chillery, Raffaele BuompaneCalibration with alpha source - no mylar on Far S2On 28/11/2018:

At 13:35: Far S2 bias = -130.0V,
leak I = 1.55uA. Diode bias = -70.1V, leak
 IMG_3337.JPG182812_S2_Alpha_NoMylar.jpg 
  68   Mon Dec 3 17:59:48 2018 Thomas Chillery, Raffaele BuompaneCalibration with alpha source - 0.9um mylar on Far S2On 28/11/2018:

After pulser walkthrough (see eLog
entry #67)
 IMG_3305.JPGIMG_3307.JPGIMG_3315.JPGIMG_3313.JPG181128123940_ADC1_Ch9.png 
  67   Mon Dec 3 17:51:46 2018 Thomas Chillery, Raffaele BuompanePulser WalkthroughOn 28/11/2018:

Performed pulser walkthrough, Run
# 181128090835
 182811_PulserWalkthrough.jpg 
  66   Mon Dec 3 17:40:51 2018 Thomas Chillery, Carlo Bruno, Raffaele BuompaneLab backgroundOn 27/11/2018:

Run # 181127200709


Run time: 46329s
Pulser
 181127200709_ADC1_Ch9.png181127200709_ADC3_Ch16.png 
  65   Mon Dec 3 17:34:38 2018 Thomas Chillery, Carlo Bruno, Raffaele Buompane6Li(p,p): Test measurement of 1.5MeV 6Li 1+ on thin CH2 50On 27/11/2018:

After tuning beam (see previous
eLog entry # 64)
 181127193908_ADC1_Ch9.png181127193908_ADC3_Ch16.png 
  64   Mon Dec 3 17:02:48 2018 Thomas Chillery, Carlo Bruno, Lizeth Morales, Guiseppe Porzio, Raffaele Buompane6Li(p,p): Tuning 1.5MeV 6Li 1+ beamOn 27/11/2018:

Started tuning for 1.5MeV 6Li 1+.
Set ladder to position #2 - Blank 10mm. Far
 IMG_3285.JPGIMG_3292.JPG 
  63   Mon Dec 3 16:47:40 2018 Thomas Chillery, Carlo Bruno, Lizeth MoralesFinishing 3.0MeV 7Be measurements with CH2 XIX and natC IIIOn 27/11/2018:

At 8:40 Far S2 bias = -130.0V,
leak I = 1.74uA. Diode bias = -70.1V, leak
 181127085408_ADC1_Ch9.png181127085408_ADC3_Ch16.png181127090808_ADC1_24.png181127092128_ADC1_Ch9.png181127092128_ADC3_Ch16.png 
  62   Mon Dec 3 16:39:42 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane3.0MeV 7Be on CH2 XIXOn 26/11/2018:

Tuned beam for 3.0MeV 7Be 2+. Far
S2 iris was closed during tuning.
 181126192446_ADC1_Ch9.png181126192446_ADC3_Ch16.png 
  61   Mon Dec 3 16:17:29 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane, David Rapagni3.0MeV 7Li on CH2 XIX and natC IIIOn 26/11/2018, after changing the far S2
mylar foil (see previous eLog entry #60):

Checked pulser frequency on oscilloscope:
 181126164509_ADC1_24.png181126183711_ADC1_Ch9.png181126183711_ADC3_Ch16.png 
  60   Mon Dec 3 15:51:11 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, David RapagniChanging far S2 protective mylar foil, preparing for 3.0MeV 7Li and 7BeOn 26/11/2018, after 6.0MeV 7Be and 7Li
beam measurements:

At 11:15:
 IMG_3273.JPG 
  59   Mon Dec 3 12:57:54 2018 Thomas Chillery, Carlo Bruno, Tom Davinson, David RapagniFinishing 6.0MeV 7Be 2+ and 7Li 2+ beam runsOn 26/11/2018:

The accelerator and chamber setup
were still operating after the overnight
 181126105357_ADC1_Ch9.png181126105357_ADC3_Ch16.png 
ELOG V3.1.4-unknown