14
|
Thu Feb 22 07:58:48 2018 |
Thomas Chillery, Tom Davinson, Raffaele Buompane, David Rapagnani, Lucio Gialanella | Setup - Beam Tuning and Prepare Chamber for Measurement at 3.0MeV 7Li | On 21/02/2018 we reattempted the beam tuning.
We expected this to be easier now the rogue
mylar is removed from the beamline. |
|
10
|
Tue Feb 20 09:19:19 2018 |
Thomas Chillery, Tom Davinson, Raffaele Buompane, David Rapagnani | Setup - Testing Chamber Vacuum and Mounting Detectors and Alpha Source | (Note: Tom Davinson is now in CIRCE until
the 21st)
On 19/02/2018 we performed the |
|
12
|
Tue Feb 20 17:03:08 2018 |
Thomas Chillery, Tom Davinson, Raffaele Buompane, David Rapagnani | Setup - Beam Tuning | The pumps were left on overnight, in the
morning at 8:25 the pressure reads:
Up = 1.5e-5 mBar and Down = 4.0e-5 |
  |
13
|
Wed Feb 21 10:46:22 2018 |
Thomas Chillery, Tom Davinson, Raffaele Buompane, David Rapagnani | Setup - Pulser Settings and 20/02/2018 Pulser Walkthrough | The PB-5 Pulse Generator settings are as
follows:
Fall Time = 100us |
|
28
|
Fri Apr 6 12:07:52 2018 |
Thomas Chillery, Raffaele Buomparte, David Rapagni, Jeremias Duartes | Tests - Attempting to solve noise issues, 15 min alpha calibration | On 05/04/18:
At 9:00 the pressures read ~10mBar
inside the chamber (static vacuum). We began |
|
29
|
Fri Apr 6 13:33:27 2018 |
Thomas Chillery, Raffaele Buomparte, David Rapagni, Jeremias Duartes | Tests - Attempting to solve noise issues | On 05/04/18, after eLog #28
After the alpha calibrationrun
Raffaele arrived and started beam tuning |
|
30
|
Fri Apr 6 14:54:12 2018 |
Thomas Chillery, Raffaele Buomparte | Tests - Attempting to solve noise issues | Today we started by mounting the central
and downstream preamp box lids.
The pumps were left running overnight, |
|
15
|
Thu Feb 22 10:40:49 2018 |
Thomas Chillery, Raffaele Buompane, David Rapagnani, Lucio Gialanella | Measurement / Test - 3.0MeV 7Li on CH2 Target VII | On 21/02/2018 after beam tuning and pumping
down at 18:07 the pressures read Up = 1.2e-5mBar,
Down = 3.2e-5mBar. We were happy to power |
  |
17
|
Thu Feb 22 18:04:12 2018 |
Thomas Chillery, Raffaele Buompane, David Rapagnani, Lucio Gialanella | Measurement - 3.0MeV 7Li on CH2 Target VII | Yesterday (21st) night we saw this low
channel, high rate (1500Hz) noise on the
diode spectrum - see eLog entry #15. |
    |
27
|
Fri Apr 6 11:39:10 2018 |
Thomas Chillery, Raffaele Buompane, David Rapagnani, Lucio Gialanella | Tests - Pumping down chamber and starting electronics tests | On 04/04/18:
We mounted S2 2323-18 (496um) in
the downstream position with 12um mylar |
   |
18
|
Fri Feb 23 13:15:05 2018 |
Thomas Chillery, Raffaele Buompane, David Rapagnani | Setup - Beam Tuning and Prepare Chamber for Measurement at 3.45MeV 7Li - Night of 22nd | Checking SRIM 3.5 MeV 7Li is stopped in
9.06um mylar or 10.09 um CH2.
After the long run at 3.0MeV on |
|
2
|
Thu Feb 15 17:34:28 2018 |
Thomas Chillery, Raffaele Buompane | Setup - Mounting Target Chamber Sections | This morning both myself and Raffaele mounted
the beamline section of the target chamber.
We also mounted the turbo located |
|
3
|
Thu Feb 15 17:45:07 2018 |
Thomas Chillery, Raffaele Buompane | Setup - Problem: Connecting the actuator arm to the iris aperture arm | After lunch we attempted to connect the
actuator arms to the iris arm used to change
the iris diameter. We need two iris diameters: |
  |
21
|
Tue Mar 6 15:29:55 2018 |
Thomas Chillery, Raffaele Buompane | Collecting S2 Alpha Calibration Spectra at End of February Test Shifts | On 23/02/2018:
We moved the target ladder to position
7, 5.019mm, with the alpha source facing |
 |
22
|
Tue Mar 6 15:41:53 2018 |
Thomas Chillery, Raffaele Buompane | Pin Diode Pulser Walkthrough at End of February Shifts | On 23/02/2018:
After the alpha source calibration
of the S2 (See eLog entry #21) we decided |
|
23
|
Tue Mar 6 15:55:04 2018 |
Thomas Chillery, Raffaele Buompane | End of February 2018 Shifts | On 23/02/2018:
At the end of the February 2018
shifts the detectors bias settings were: |
|
31
|
Thu Apr 12 12:47:04 2018 |
Thomas Chillery, Raffaele Buompane | Central S2 Alpha Calibration | Date: 06/04/2018
We connected the analogue signals
of RAL X, XII, XIII, and "R" to |
|
32
|
Thu Apr 12 13:12:00 2018 |
Thomas Chillery, Raffaele Buompane | 7Li 5.0MeV Beam tests with Central S2 | Date: 06/04/2018 (after 16:40)
We powered the preamps for the
two S2 detectors and the diode. |
|
33
|
Thu Apr 12 14:14:09 2018 |
Thomas Chillery, Raffaele Buompane | 7Be 5.0MeV Beam test with central S2 | Date: 06/04/2018
Before starting this beam test
we lowered the channel thresholds on ADC |
  |
67
|
Mon Dec 3 17:51:46 2018 |
Thomas Chillery, Raffaele Buompane | Pulser Walkthrough | On 28/11/2018:
Performed pulser walkthrough, Run
# 181128090835 |
|