AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CIRCE, Page 1 of 4  ELOG logo
Entry  Tue Feb 18 14:39:26 2020, Thomas Chillery, Target Thicknesses Target_List.xls
Excel spreadsheet showing CH2 and natC target thicknesses attached
Entry  Wed Sep 18 14:01:13 2019, Thomas Chillery, Logbook Spreadsheet 181123_Logbook.xls
See attached for the logbook
Entry  Tue Dec 4 11:23:29 2018, Thomas Chillery, Chamber Dimensions IMG_3397.JPGIMG_3398.JPGIMG_3399.JPG
See attached pictures for measurements of the 7Be(p,p) chamber dimensions.

The target ladder center - Far S2 distance = 50 + 95 + 0.85 - (19.22+19.58)/2 = 126.45 mm
Entry  Tue Dec 4 09:40:31 2018, Thomas Chillery, Preliminary measurements of target activation using geiger counter 
On 29/11/2018 at 17:40 a rough measurement of the irradiated target activity was performed using a geiger counter.

The geiger counter was a calibrated Berthold LB124, which was placed a fixed 15mm distance from each target.

The calibration was such that 1cps = 37kBq.
Entry  Tue Dec 4 09:38:18 2018, Thomas Chillery, 181122 Electronics Map 181122_Electronics_Channel_Map.ods181122_Electronics_Channel_Map.xls
See attached for S2 electronics map, following channels from S2 outputs to ADC inputs

For the 19/11/2018 - 29/11/2018 beamtime only the Far S2 was in operation
Entry  Mon Dec 3 19:04:20 2018, Thomas Chillery, Raffaele Buompane, End of beamtime - Items to be shipped back to Edinburgh 
To be shipped back to Edinburgh for repair:





Item

Quantity


ECL - NIM Convertor
2


Quad HV Supply
1


Quad
Entry  Mon Dec 3 18:55:31 2018, Thomas Chillery, Raffaele Buompane, End of beamtime - Cleanup 8x
On 29/11/2018:

Dismounted S2 2323-18 (496um), 12um mylar, diode, and diodes 0.9um mylar.

Performed general cleanup of lab. Boxed away cables and other parts. See attached pictures 1, 2, 3, and 4.
Entry  Mon Dec 3 18:45:17 2018, Thomas Chillery, Raffaele Buompane, End of beamtime - Module settings 
Diode Ortec 571 Amplifier Settings:


Fine gain: 10 (0.5 ->1.5)
Course gain: 50
Shaping time: 0.5us
BLR AUTO: ON
NEG: ON (Instead
of POS)
OUT: ON (Instead of Delay)
Internal fine gain: 1X


Diode quad TFA settings:
Entry  Mon Dec 3 18:30:53 2018, Thomas Chillery, Raffaele Buompane, Calibration with alpha source - 12um mylar on Far S2 IMG_3356.JPGIMG_3363.JPG181128184505_ADC1_Ch9.png
On 28/11/2018:

Mounted 12um mylar in front of far S2 - see attached pictures 1 and 2

In air: Far S2 biased to -130.0V, leak I = 1.61uA. Diode biased to -70.1V, leak I = 0.01uA -> 0.00uA. Rate meter ~ 4500Hz.
Entry  Mon Dec 3 18:15:42 2018, Thomas Chillery, Raffaele Buompane, Calibration with alpha source - no mylar on Far S2 IMG_3337.JPG182812_S2_Alpha_NoMylar.jpg
On 28/11/2018:

At 13:35: Far S2 bias = -130.0V, leak I = 1.55uA. Diode bias = -70.1V, leak I = 0.00uA.

Pressures (mBar):
Entry  Mon Dec 3 17:59:48 2018, Thomas Chillery, Raffaele Buompane, Calibration with alpha source - 0.9um mylar on Far S2 IMG_3305.JPGIMG_3307.JPGIMG_3315.JPGIMG_3313.JPG181128123940_ADC1_Ch9.png
On 28/11/2018:

After pulser walkthrough (see eLog entry #67)

Dismounted targets from ladder - see picture 1 and 2 for upstream and downstream sides respectively
Entry  Mon Dec 3 17:51:46 2018, Thomas Chillery, Raffaele Buompane, Pulser Walkthrough 182811_PulserWalkthrough.jpg
On 28/11/2018:

Performed pulser walkthrough, Run # 181128090835


Run time: 1986s
Pulser ON, amplitude changed
Target: None
Beam: None
DT ~ 11%
See
Entry  Mon Dec 3 17:40:51 2018, Thomas Chillery, Carlo Bruno, Raffaele Buompane, Lab background 181127200709_ADC1_Ch9.png181127200709_ADC3_Ch16.png
On 27/11/2018:

Run # 181127200709


Run time: 46329s
Pulser ON, as before
No target
No beam
Lab background
DT ~ 12%
See
Entry  Mon Dec 3 17:34:38 2018, Thomas Chillery, Carlo Bruno, Raffaele Buompane, 6Li(p,p): Test measurement of 1.5MeV 6Li 1+ on thin CH2 50 181127193908_ADC1_Ch9.png181127193908_ADC3_Ch16.png
On 27/11/2018:

After tuning beam (see previous eLog entry # 64)

Run #181127193908
Entry  Mon Dec 3 17:02:48 2018, Thomas Chillery, Carlo Bruno, Lizeth Morales, Guiseppe Porzio, Raffaele Buompane, 6Li(p,p): Tuning 1.5MeV 6Li 1+ beam IMG_3285.JPGIMG_3292.JPG
On 27/11/2018:

Started tuning for 1.5MeV 6Li 1+. Set ladder to position #2 - Blank 10mm. Far S2 iris closed.

Run # 181127151653
Entry  Mon Dec 3 16:47:40 2018, Thomas Chillery, Carlo Bruno, Lizeth Morales, Finishing 3.0MeV 7Be measurements with CH2 XIX and natC III 181127085408_ADC1_Ch9.png181127085408_ADC3_Ch16.png181127090808_ADC1_24.png181127092128_ADC1_Ch9.png181127092128_ADC3_Ch16.png
On 27/11/2018:

At 8:40 Far S2 bias = -130.0V, leak I = 1.74uA. Diode bias = -70.1V, leak I = 0.00uA.

Pressures (mBar):
Entry  Mon Dec 3 16:39:42 2018, Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane, 3.0MeV 7Be on CH2 XIX 181126192446_ADC1_Ch9.png181126192446_ADC3_Ch16.png
On 26/11/2018:

Tuned beam for 3.0MeV 7Be 2+. Far S2 iris was closed during tuning.

After tuning, using 10mm aperture FCC = 5pA, using 3mm aperture FCC = 4pA.
Entry  Mon Dec 3 16:17:29 2018, Thomas Chillery, Carlo Bruno, Tom Davinson, Raffaele Buompane, David Rapagni, 3.0MeV 7Li on CH2 XIX and natC III 181126164509_ADC1_24.png181126183711_ADC1_Ch9.png181126183711_ADC3_Ch16.png
On 26/11/2018, after changing the far S2 mylar foil (see previous eLog entry #60):

Checked pulser frequency on oscilloscope: 19.31Hz

Began tuning 3MeV 7Li 2+.
Entry  Mon Dec 3 15:51:11 2018, Thomas Chillery, Carlo Bruno, Tom Davinson, David Rapagni, Changing far S2 protective mylar foil, preparing for 3.0MeV 7Li and 7Be IMG_3273.JPG
On 26/11/2018, after 6.0MeV 7Be and 7Li beam measurements:

At 11:15:

Far S2 bias = -130.0V, leak I = 1.60uA. Diode bias = -70.1V, leak I = 0.00uA.
Entry  Mon Dec 3 12:57:54 2018, Thomas Chillery, Carlo Bruno, Tom Davinson, David Rapagni, Finishing 6.0MeV 7Be 2+ and 7Li 2+ beam runs 181126105357_ADC1_Ch9.png181126105357_ADC3_Ch16.png
On 26/11/2018:

The accelerator and chamber setup were still operating after the overnight run.

Far S2 bias = -130V, leak I = 1.59uA. Diode bias = -70.1V, leak I = 0.00uA.
ELOG V3.1.4-unknown