AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CIRCE, Page 1 of 4  ELOG logo
Entry  Thu Feb 22 07:58:48 2018, Thomas Chillery, Tom Davinson, Raffaele Buompane, David Rapagnani, Lucio Gialanella, Setup - Beam Tuning and Prepare Chamber for Measurement at 3.0MeV 7Li IMG_2738.JPG
On 21/02/2018 we reattempted the beam tuning. We expected this to be easier now the rogue mylar is removed from the beamline.

At 8:30 we started the roughing pumps. At 8:37 the turbos were switched on. By 8:55 the preassures read: Up = 1.6e-5, and Down = 4.3e-5
mBar.
Entry  Tue Feb 20 09:19:19 2018, Thomas Chillery, Tom Davinson, Raffaele Buompane, David Rapagnani, Setup - Testing Chamber Vacuum and Mounting Detectors and Alpha Source 
(Note: Tom Davinson is now in CIRCE until the 21st)

On 19/02/2018 we performed the following:

This morning we gave CIRCE technician Antonio slanted spacer boxes (for mounting preamps) and also the Al box (used for target ladder) for minor
Entry  Tue Feb 20 17:03:08 2018, Thomas Chillery, Tom Davinson, Raffaele Buompane, David Rapagnani, Setup - Beam Tuning IMG_2712.JPGIMG_2709.JPGIMG_2724.JPG
The pumps were left on overnight, in the morning at 8:25 the pressure reads:

Up = 1.5e-5 mBar and Down = 4.0e-5 mBar.

We made a first attempt at collecting an alpha spectrum for the far S2 detector using ADC 2 and ADC 3. However ADC 3 appeared to be acting as
Entry  Wed Feb 21 10:46:22 2018, Thomas Chillery, Tom Davinson, Raffaele Buompane, David Rapagnani, Setup - Pulser Settings and 20/02/2018 Pulser Walkthrough BKG_zoombeam1.jpg
The PB-5 Pulse Generator settings are as follows:

Fall Time = 100us

Rate = 2.00Hz
Entry  Fri Apr 6 12:07:52 2018, Thomas Chillery, Raffaele Buomparte, David Rapagni, Jeremias Duartes, Tests - Attempting to solve noise issues, 15 min alpha calibration S2_2323-18_496um_Bias_Vs_Leakage_Current_050418.png
On 05/04/18:

At 9:00 the pressures read ~10mBar inside the chamber (static vacuum). We began venting the chamber.

During venting the cable daisy chain on top of the preamp boxes was removed, the downstream preamp box was removed. It was decided to also removed
Entry  Fri Apr 6 13:33:27 2018, Thomas Chillery, Raffaele Buomparte, David Rapagni, Jeremias Duartes, Tests - Attempting to solve noise issues 
On 05/04/18, after eLog #28

After the alpha calibrationrun Raffaele arrived and started beam tuning for 7Li 2+ at 5.0MeV using a LiO molecular source

We set the target ladder to position II (80.024 mm) - no target frame or target
Entry  Fri Apr 6 14:54:12 2018, Thomas Chillery, Raffaele Buomparte, Tests - Attempting to solve noise issues 
Today we started by mounting the central and downstream preamp box lids.

The pumps were left running overnight, at 9:06 CHUP = 2.1e-5mBar and CHDW = 5.8e-5mBar.

We biased the detectors
Entry  Thu Feb 22 10:40:49 2018, Thomas Chillery, Raffaele Buompane, David Rapagnani, Lucio Gialanella, Measurement / Test - 3.0MeV 7Li on CH2 Target VII 180221_PinDiode.png180221_S2BackStrip_ADC4CH24.png180221_S2FrontStrip_ADC2CH7.png
On 21/02/2018 after beam tuning and pumping down at 18:07 the pressures read Up = 1.2e-5mBar, Down = 3.2e-5mBar. We were happy to power the detectors
and try to observe spectra from beam in both the S2 and pin diode.

Whilst waiting for the turbos to spin up the Pin diode was daisy chained with the +ve pulser, +15V, and -15V preamp power cables used with EDI
Entry  Thu Feb 22 18:04:12 2018, Thomas Chillery, Raffaele Buompane, David Rapagnani, Lucio Gialanella, Measurement - 3.0MeV 7Li on CH2 Target VII Nuclear_Reaction-master.xlsx180222_diode.jpg180222_ADC4CH24.jpg180222_ADC2CH7.jpgPinDiode_AlphaSpectra.jpg
Yesterday (21st) night we saw this low channel, high rate (1500Hz) noise on the diode spectrum - see eLog entry #15.

This morning the S2 bias was ramped to -130.3V, leak I = 1.43uA. Diode bias ramped to -70.0V, leak I = 0.01uA.

Starting the DAQ with no beam, the trigger rate is ~250 Hz, with most triggers coming from the diode. Inspecting with the oscilloscope we find
Entry  Fri Apr 6 11:39:10 2018, Thomas Chillery, Raffaele Buompane, David Rapagnani, Lucio Gialanella, Tests - Pumping down chamber and starting electronics tests S2_2323-18_496um_Bias_Vs_Leakage_Current.pngS2_2623-26_505um_Bias_Vs_Leakage_Current.png20180404_Pulser_PreampLid_ON.jpg20180404_Pulser_DisconnectedFromFeedthrough.jpg
On 04/04/18:

We mounted S2 2323-18 (496um) in the downstream position with 12um mylar

We mount the central and downstream iris arms, we set the central arm position to 14.0mm and the downstream arm position toe 1.5mm - opening
Entry  Fri Feb 23 13:15:05 2018, Thomas Chillery, Raffaele Buompane, David Rapagnani, Setup - Beam Tuning and Prepare Chamber for Measurement at 3.45MeV 7Li - Night of 22nd 
Checking SRIM 3.5 MeV 7Li is stopped in 9.06um mylar or 10.09 um CH2.

After the long run at 3.0MeV on 22/02/2018 we decided to put the 12um mylar back in front of the S2 and start tuning the beam for 3.45MeV 7Li.
We also decided to tune the beam to a higher current of ~ 100pA to try and improve the detection rates.
Entry  Thu Feb 15 17:34:28 2018, Thomas Chillery, Raffaele Buompane, Setup - Mounting Target Chamber Sections IMG_2621.JPG
This morning both myself and Raffaele mounted the beamline section of the target chamber.

We also mounted the turbo located immediately downstream from the target chamber, see attached IMG_2621.jpg image - the beam will enter from
the right of the image
Entry  Thu Feb 15 17:45:07 2018, Thomas Chillery, Raffaele Buompane, Setup - Problem: Connecting the actuator arm to the iris aperture arm ApertureAdjustmentHooks.JPGApertureArm_TwoScrews.JPGIrisArmProblemSketch.JPG
After lunch we attempted to connect the actuator arms to the iris arm used to change the iris diameter. We need two iris diameters: fully open for experiment
measurements and a 5mm diameter for beam focusing

To do this the original design uses a cuboid with two rods, one rod is connected to the actuator arm, and the other rod is connected to the iris
Entry  Tue Mar 6 15:29:55 2018, Thomas Chillery, Raffaele Buompane, Collecting S2 Alpha Calibration Spectra at End of February Test Shifts 180223_Alpha_S2FrontStrip_ADC2CH20.png180223_Alpha_S2BackStrip_ADC4CH24.png
On 23/02/2018:

We moved the target ladder to position 7, 5.019mm, with the alpha source facing downsteam.

At 17:17 we started the DAQ for a 15 minute alpha spectrum on the downstream S2. Save name: /Remote_Objs/RData_1/180223172135
Entry  Tue Mar 6 15:41:53 2018, Thomas Chillery, Raffaele Buompane, Pin Diode Pulser Walkthrough at End of February Shifts 180223_PulserWalk_PinDiode_ADC6CH31.png
On 23/02/2018:

After the alpha source calibration of the S2 (See eLog entry #21) we decided to perform a pulser walkthrough for the pin diode on ADC 6 CH 31.

The pulser was only connected to the pin diode preamp to ensure it wasnt being split.
Entry  Tue Mar 6 15:55:04 2018, Thomas Chillery, Raffaele Buompane, End of February 2018 Shifts 
On 23/02/2018:

At the end of the February 2018 shifts the detectors bias settings were:

S2 bias = -130.3V, leak I = 2.42uA
Entry  Thu Apr 12 12:47:04 2018, Thomas Chillery, Raffaele Buompane, Central S2 Alpha Calibration 
Date: 06/04/2018

We connected the analogue signals of RAL X, XII, XIII, and "R" to the 3rd ADC (Module 4)

We connected the analogue signals of RAL "S", "Q", "u", and "w" to the 4th ADC (Module 5)
Entry  Thu Apr 12 13:12:00 2018, Thomas Chillery, Raffaele Buompane, 7Li 5.0MeV Beam tests with Central S2 
Date: 06/04/2018 (after 16:40)

We powered the preamps for the two S2 detectors and the diode.

We biased the detectors:
Entry  Thu Apr 12 14:14:09 2018, Thomas Chillery, Raffaele Buompane, 7Be 5.0MeV Beam test with central S2 180406_7Be_5MeV_CentralS2_BackStrip.jpg180406_7Be_5MeV_Diode.jpg180406_7Be_5MeV_CentralS2_FrontStrip.jpg
Date: 06/04/2018

Before starting this beam test we lowered the channel thresholds on ADC 3 and 4 (modules 4 and 5) from 40 to 8

The diode Ortec 571 settings are:
Entry  Mon Dec 3 17:51:46 2018, Thomas Chillery, Raffaele Buompane, Pulser Walkthrough 182811_PulserWalkthrough.jpg
On 28/11/2018:

Performed pulser walkthrough, Run # 181128090835


Run time: 1986s
Pulser ON, amplitude changed
Target: None
Beam: None
DT ~ 11%
See
ELOG V3.1.4-unknown