AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 21 of 35  ELOG logo
  ID Date Author Subject Text Attachments
  295   Tue May 4 21:26:43 2021 OHAlpha run22:26 Tape server set up to write to directory
May21
      DAQ stopped
 10x 
  293   Tue May 4 14:26:50 2021 NHFEE64 Adapter wiring diagram and layoutA figure showing the FEE64 numbers (a previous
diagram had 2/6 and 4/8 on the wrong side
of the DSSD) and the wiring of pulser/HV
 AIDA_Adapter_Configuration(1).png 
  292   Tue May 4 14:05:48 2021 NHMACB CablesDuring the installation of the 4 new HDMI
cables for aidas13-16 the HDMI cables between
the MACB Root and the MACB leaves were looped
 macb_front.jpgmacb_side.jpg 
  291   Tue May 4 13:53:22 2021 OH, TDTuesday 4 May
NH has re-checked alignment of AIDA adaptor
PCBs cf. Elog:290
 7x 
  290   Tue May 4 12:11:39 2021 OH TDBias test of triple13:11 System wide checks all ok except *aida02
fails ADC calibration*
 Collecting the file size of each FEE64 Options
 210504_1325_Rate.png210504_1326_Layout7.png210504_1327_Layout08.png210504_1334_Stats.pngVICurve.png 
  289   Sat May 1 08:45:19 2021 TDAIDA 24cm x 8cm DSSSD + triPlast assembly for S496
Photos provided by Nic Hubbard and Helena
Albers from the assembly of 2x triPlast
 12x 
  288   Fri Apr 30 08:38:12 2021 TDFriday 30 April09.40 All system wide checks OK *except*

FEE64 module aida07 failed
 6x 
  287   Thu Apr 29 16:56:42 2021 OHConfig changes for 16FEENew set of ASIC settings produced 2021Apr29-13-16-00
- Note no longer odd/even for polarity of
signal
  
  286   Wed Apr 28 17:39:35 2021 TDPreparations for setup of aida13-aida16
Updated /etc/dhcpd.conf
 dhcpd.confdhcpd.conf.BAK-280421startup.tclstartup.tcl.BAK-280421 
  285   Wed Apr 28 10:06:11 2021 NHWednesday 28 April11.05 All system wide checks OK *except*
WR
 elog_temps.pngelog_gswr.pngelog_tse.pngelog_hv.pngAIDA_FEE.png.jpeg 
  284   Tue Apr 27 08:26:01 2021 TDTuesday 27 April - aida09 system console reports 'received undefined information code: 1' and 'code: 9'
09.25 All system wide checks OK *except*
 6x 
  283   Mon Apr 26 09:41:21 2021 TDMonday 26 April10.42 All system wide checks OK *except*

 Base  Current  Difference
 302.pngScreenshot_2021-04-26_Temperature_and_status_scan_aidas-gsi.pngScreenshot_2021-04-26_Statistics_aidas-gsi.pngScreenshot_2021-04-26_NewMerger_Statistics_aidas-gsi.pngScreenshot_2021-04-26_AIDA_Alerting_-_Grafana.png 
  282   Sun Apr 25 10:22:16 2021 TDSunday 25 April11.25 All system wide checks OK *except*

 Base  Current  Difference
 9x 
  281   Sat Apr 24 15:48:38 2021 TDaida12 crash - 08:33:03 Monday 19 April
from ttyUSB5 system console log
  
  280   Sat Apr 24 15:28:17 2021 TDaida05 crash - 11:08:07 Tuesday 20 April
From ttyUSB7 system console log
  
  279   Sat Apr 24 15:13:33 2021 TDaida09 crash - 08:10:52 Tuesday 20 April
From ttyUSB6 system console log
  
  278   Sat Apr 24 13:33:44 2021 TDaida01 restart - 22.07UTC+2 Tuesday 20 April
From aida01 /var/log/messages
  
  277   Sat Apr 24 13:25:23 2021 NH, TDAIDA FEE64 crash log for S460
https://docs.google.com/spreadsheets/d/1CyL5L-WLsh9fsS7CN989GC3ktqiPQOkG8YIDJrrGxYA/edit#gid=0
  
  276   Sat Apr 24 10:21:06 2021 NHSaturday 24.04.2021I have restarted some more of the consoles
that disappeared since the aidas-gsi issue
last night
 AnyDesk_2021-04-24_11-27-49.pngAnyDesk_2021-04-24_11-28-50.png 
  275   Sat Apr 24 05:17:51 2021 MLEnd of beamBeam has now stopped (end of expriment)
and background measurements starts.
  
ELOG V3.1.4-unknown