ID |
Date |
Author |
Subject |
Text |
 |
|
517
|
Wed Jan 18 13:40:33 2023 |
PJCS TD | MACB settings with either Emulator or VITAR | When using the VETAR connected
to the HDMI port of the root MACB the settings
for all the MACB in the system 0x3. |
   |
|
516
|
Fri Dec 16 14:02:12 2022 |
NH | AIDA System off for christmas break | The AIDA NIM crate, pis and workstation have
been powered off for the Christmas break
and will not be accessible |
|
|
515
|
Thu Oct 6 16:51:49 2022 |
NH | Oscilloscope analysis | Investigating AIDA noise with a TA041 differential
probe and oscilloscope
|
24x |
|
514
|
Wed Sep 14 19:07:07 2022 |
PJCS | INFO : Three Merger Statistics explained | There are three Merger statistics that
can be used to better understand how the
data flow through the Merger system is proceeding. |
|
|
513
|
Thu Sep 8 12:37:18 2022 |
NH | Proxy Port Changed | The proxy in Firefox, Yum and AnyDesk has
been changed as the old wasn't working
|
|
|
512
|
Thu Sep 8 12:31:25 2022 |
NH | Retrying AIDA DataAcq v10 | Startup AIDA with ribbon cable connected to
aida03 and aida07 for noise
|
  |
|
511
|
Tue Aug 30 13:48:32 2022 |
NH | AIDA Single Switch Configuration | The second switch was moved back to CARME
so AIDA has been configured back to using
a single switch
|
|
|
510
|
Tue Jul 5 08:53:20 2022 |
TD | To Do |
In no particular order
|
|
|
509
|
Wed Jun 29 10:48:26 2022 |
NH, OH | AIDA Dismounted | All detectors removed from single and triple
AIDA snouts
|
|
|
508
|
Tue Jun 28 10:11:35 2022 |
OH, NH | MIDAS Data Aq V10 | 11:11 Rebooted FEEs and changed aidacommon
in /MIDAS/linux-ppc_4xx/startup to point
to the new V10 DataAq that Patrick produced
|
  |
|
507
|
Tue Jun 28 09:37:19 2022 |
NH | Tues 28 June 08:00- | Experiment over
10:37 - Stop DAQ & Tape
|
|
|
506
|
Mon Jun 27 23:11:47 2022 |
TD | Tuesday 28 June 00:00-08:00 | 00:07 Zero stats & all histograms
ASIC settings 2021Apr29-13-16-00
|
30x |
|
505
|
Mon Jun 27 17:03:09 2022 |
MA | Monday 27th June 16:00-00:00 | 16:00 Took over the shift from OH no beam
yet.
18:00 Still no beam yet. |
6x |
|
504
|
Mon Jun 27 06:45:22 2022 |
OH | Monday 27th June 08:00-16:00 | 07:45 Spoke to David and the beam has been
gone since about 05:30
Reason for the loss of beam is a vacuum |
   |
|
503
|
Sun Jun 26 23:04:30 2022 |
Marc | new shift - Monday 27 June 0:00 to 8:00 | 0:00 Experiment continues to run smoothly.
AIDA DAQ has been rather stable. Leakage
current has gone up for the past two days |
12x |
|
502
|
Sun Jun 26 08:51:20 2022 |
OH, NH | Sunday 26 June 08:00-24:00 | 09:51 Taken over from Tom following the night
shift
Experiment is still running smoothly
|
27x |
|
501
|
Sat Jun 25 22:48:57 2022 |
TD | Sunday 26 June 00:00-08:00 | 23.43 Check ASIC control
Zero stats & all histograms
|
30x |
|
500
|
Sat Jun 25 17:06:42 2022 |
BA, AA | Saturday 25 June 2022 16:00-00:00 | Took over the night shift from Magda
18:00 : attachments 1-3 |
9x |
|
499
|
Sat Jun 25 06:55:07 2022 |
MS | Saturday 25 June 2022 8:00-16:00 | Took over the night shift from Tom.
7:00 The beam is back.
8:00 : attachments 1-3 |
15x |
|
498
|
Fri Jun 24 22:36:45 2022 |
TD | Saturday 25 June 00:00-08:00 |
23:36 Check ASIC contorol
Zero stats & all histograms
|
31x |