580
|
Fri Apr 19 13:52:34 2024 |
JB, CC, TD | Friday 19 April contd. |
12.00 Replaced AIDA ASIC mezzanine of aida01
to fix issue with asic #3
|
23x |
|
579
|
Fri Apr 19 02:35:14 2024 |
TD | Friday 19 April |
03.30
|
38x |
|
578
|
Thu Apr 18 13:59:55 2024 |
TD, JB | WR timestamp OK, readout time not OK |
WR timestamps appear to be OK but readout
times fort aida03, aida04 and aida09 appear |
    |
|
577
|
Thu Apr 18 08:57:48 2024 |
JB, TD | Thursday 18 April | 09.52 DAQ continues file S100_alpha/R5
note merger not functioning correctly
due to aida03, aida04 & aida09 out of WR |
36x |
|
576
|
Tue Apr 16 23:37:58 2024 |
TD | Wednesday 17 April |
00.40 Observed zero data fron aida03, aida04,
aida09
|
44x |
|
575
|
Tue Apr 16 10:49:37 2024 |
TD, JB, CC | Tuesday 16 April | 11.45 DSSSD bias & leakage current OK - attachments
9-10
|
24x |
|
574
|
Mon Apr 15 09:23:43 2024 |
CC, JB, HMA, TD | Noise in AIDA when connecting BB7 | 9:40 started up AIDA. TEMP OK. Noise condition
same as Saturday. Attachments 1-3.
9:56 BB7 premaps connected but |
13x |
|
573
|
Sat Apr 13 14:04:44 2024 |
JB | 13 April Noise checks | 15:04 bPlast was left powered over night.
Powering up to check noise conditions - also
to check shifting of Germanium baseline (no |
9x |
|
572
|
Thu Apr 11 22:04:50 2024 |
JB | 12.04.2024 AIDA-bPlast noise optimisation | 15:00 Platform in, biasing detector. Temp
OK Attachment 1. test - Pulser OFF.
|
    |
|
571
|
Thu Apr 11 08:27:21 2024 |
JB, TD | 11 April noise tests |
TO-DO for 11.04.2024
- Try bringing
bPlast drain wire ground back to the PSU
ground for PN 300 and R&SRMP4040.
- |
48x |
|
570
|
Wed Apr 10 08:37:57 2024 |
JB, CC, TD | Wednesday 10 April |
09.38 CC completed install of Bplast driver
PCBs yesterday evening.
|
47x |
|
569
|
Tue Apr 9 13:22:41 2024 |
TD, JB, CC | Continued of 9th of April | Disconnected test - pulser from aida08.
Noise conditions improved slightly, probably
less pulser events. (Attachments 1 & |
  |
|
568
|
Tue Apr 9 09:04:07 2024 |
TD | [How To] Remote control of BNC PB-5 |
BNC PB-5 set to remote control
|
|
|
567
|
Tue Apr 9 08:37:47 2024 |
TD | Tuesday 9 April | 09.36 Cooling water temperature and flow OK
FEE64 power ON
|
16x |
|
566
|
Mon Apr 8 16:39:00 2024 |
JB, CC, TD | Monday 8 April |
17.32 Power and detector bias cycle
|
11x |
|
565
|
Mon Apr 8 11:18:19 2024 |
TD | S505 offline analysis data file R3_150 |
DRG quotes ( from Elog ) S505 FEE64 configuration
as
|
    |
|
564
|
Mon Apr 8 10:23:16 2024 |
TD, JB | AIDA Noise optimisation | In the morning we reinstalled FEE64s aida06,
aida13, aida07. The rails of the FEE64 boards
were found to be incorrect (that of the rails |
30x |
|
563
|
Sun Apr 7 18:13:56 2024 |
TD | Sunday 7 April contd. |
19.10 CAEN N1419ET LK fitted
power cycle
|
6x |
|
562
|
Sun Apr 7 13:08:52 2024 |
TD | FEE64 configuration | FEE64 configuration per https://elog.gsi.de/despec/S100/6
Configuration: Wide - 16 FEEs, 2 DSSD
|
|
|
561
|
Sun Apr 7 12:16:27 2024 |
TD | aida06 system console log | ISOL Version 1.00 Date 9th January 2017
Flash base address=FC000000
Set Flash to ASync Mode
|
|