AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 30 of 35  ELOG logo
  ID Date Author Subject Text Attachments
  107   Mon Dec 16 14:48:02 2019 NH TDAIDA 16.12.19DSSD Snout was reassembled to install the
second bPlast (downstream) 
 (fig 1)
 20191213_103710.jpg161219_aida_DSSDs.png161219_rates.png161219_aida0855.pngmidasmessage131219.png 
  106   Wed Dec 11 10:58:52 2019 NHInitital Dec. AnalysisFig 1: 2D hit pattern of each AIDA DSSD for
MBS run 24 (40Ar primary beam, centred)
 11x 
  105   Sat Dec 7 02:39:02 2019 DK, NH et al.34Si Fragments PIDSee attached

Tentative PID (DK) as attachment #3
 2019-12-07-PID.png59_AM.pngpid.pngAr-300_S4_updated_matter_DEPSEC_34Si.lpp 
  104   Fri Dec 6 20:34:56 2019 CA, DK, NHDec 6 Night Shift21.35 AIDA DAQ currently running, TapeService
on, not writing to storage
 15x 
  103   Thu Dec 5 22:00:11 2019 CA, DK, NHDec 5 Night Shift15:30
  TD found the merger was running at ~43
Mb/s
 30x 
  102   Wed Nov 27 16:33:50 2019 NHNew Bias & WaveformsHV core (-160 V) now attached to bottom
3 FEEs (with grounded kapton)

DSSDs bias OK, leakages unchanged
 waves_new_odd.pngwaves_new_even.png 
  101   Mon Nov 25 13:25:51 2019 NHWaveforms> AIDA Waveforms immediately after beam at
21.11.19 8am or so.
 wave_odd.pngwave_even1.png 
  100   Fri Nov 22 08:55:31 2019 NHWaveformsAIDA Waveforms immediately after beam at 21.11.19
8am or so.
 waves_21119_even.png21119_waves_odd.pngwaves_21119_even_z.pngwaves_21119_odd_z.png 
  99   Wed Nov 20 20:36:14 2019 CA, CB, DK, NH20/21 November Night Shift21:35 (NH) - A few merger timestamp errors
were appearing - Decided to powercycle all
FEE64s, all checks OK.
 17x 
  98   Tue Nov 19 21:22:06 2019 CA, CB, DK, NH19/20 November 2019 - overnight shift19 November

Waiting for 40Ar beam to be delivered for
 15x 
  97   Wed Nov 13 15:38:20 2019 NH[HowTo] MBS for AIDA (Nov 19)For MBS integration AIDA forwards its data
to an MBS Foreign Data Receiver (FDR), currently
the PC assigned for this task is x86l-94.
  
  96   Wed Nov 13 09:10:37 2019 CA, NH, OH13th November 201910:10 moved HV cables from 11 and 12 to 10
and 9 - all detectors biased in same configuration
 191113_pulserpeaksOdd.png191113_pulserpeaksEven.png191113_goodevents.png191113_bias.png 
  95   Wed Nov 13 01:54:00 2019 TDAida10 Unusual Pulser PeakDouble peaking normally indicates periodic
baseline variations with period comparable
to shaping time
  
  94   Tue Nov 12 14:10:18 2019 NH, OH, CAAida10 Unusual Pulser Peakaida10 (no alpha rate recorded) has a strange
pulser peak - looks like double peak?

Pulser terminator checked and OK...
 aida10-pulser-121119.pngpulsers121119.pngpulsersodd121119.png 
  93   Tue Nov 12 13:59:07 2019 NH, OH, CAAwfully noisy waveformsRates in all FEEs much higher than before
- waveform shows very noisy in all systems.
- attachment 1
 8x 
  92   Tue Nov 12 13:22:19 2019 OH, NH, CAAIDA09 ReplacementASIC 1 on FEE9 was not producing signals.

A new HDMI cable was installed but still
 FEE-SerialNumber.txt 
  91   Mon Nov 11 10:34:19 2019 NHAlpha Analysis (11.11.19)Analysis of approx 20GB of data since Thursday
night (not continuous - estimate of hours
incominG)
 9x 
  90   Thu Nov 7 10:22:26 2019 Nic, PatrickReply: WR Timestamps> > > All 12 FEEs have valid WR Timestamps
> > > Had to powercycle aida09 once as before
raw readout was displaying upper 12 bits
  
  89   Tue Nov 5 11:15:41 2019 NH PJCSReport: aida10 database corruptionIf ypou now check the actual values in
the aida10 Options screen are the correct
?
  
  88   Tue Nov 5 10:32:21 2019 NH PJCSReport: aida10 database corruptionHi, see the attached files in the original
comment. I think the BACKUPCorrupt is quite
old now.
  
ELOG V3.1.4-unknown