AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 10 of 36  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
  IDdown Date Author Subject Text Attachments
  534   Tue Mar 12 16:16:49 2024 NH, TD, JB, HASummary of DSSSD Biasing 12.03DSSD#1 undergoes a breakdown at 90V, two of
the three wafers show this
- The adapter PCBs themselves have no breakdown
  
  533   Mon Mar 11 15:19:44 2024 JB, NH, Priyanka, Michael Armstrong, Helena AlbersTo Do: AIDA PCB testsTo do:

1) Disconnect ribbon cables
from p+n junction FEE64 adaptor PCBs of upstream
  
  532   Sun Mar 10 17:08:12 2024 NHAIDA FEE Layout + Cabling Plan for S100Proposed FEE numbering and wiring plan for
upcoming experiment S100 (2x Wide DSSSDs)
 AIDA_S100_WiringPlan.drawio.pngAIDA_S100_WiringPlan.drawioAIDA_S100_WiringPlan(1).drawioAIDA_S100_WiringPlan.drawio.png 
  531   Fri Mar 8 16:05:57 2024 JB, CC, TD, NHFriday 8 MarchBias tests of AIDA on individual wafers
and in parallel. Spreadsheet can be found
in attachment 1, and graphic results can
 IV_test_AIDA.xlsxchart.pngDownstream_positive_bias_vs._Current_(uA).png 
  530   Thu Mar 7 15:15:29 2024 JB, NH, CCAIDA HV Bias Test IV Curve
AIDA I-V
Test


Voltage
  
  529   Thu Mar 7 11:09:05 2024 HA, JB, CC, TD, MGThursday 7 March
Snout assembly
  
  528   Tue Mar 5 09:10:01 2024 MA, JB, TDTuesday 5 March
Old ribbon cable assemblies - attachments
1  2
 20240305_101140.jpg20240305_101146.jpg20240305_165949.jpg 
  527   Mon Mar 4 11:35:30 2024 TDMonday 4 March12.30 FEE64 41:d7:cd ASIC mezzanine u/s, no
data, ASIC temperature c. 20 deg C ( ambient
) low
 11x 
  526   Sun Mar 3 16:06:11 2024 TDSunday 3 March
17.00 FEE64 41:a0:71 ASIC #2 u/s
      Replaced ASIC mezzanine with new ASIC
 24x 
  525   Mon Feb 26 13:17:51 2024 TDOffline analysis of DEC23/R9_6
First pass analysis of data file /TapeData/DEC23/R9_6
 9x 
  524   Wed Jan 31 15:27:07 2024 TDPhotos of water flow & dew point sensor interlock boxAttachment 1 - 4 socket input connectors (
from sensor to interlock box )
 20240131_160205.jpg20240131_145249.jpg20240131_145340.jpg20240131_160341.jpg 
  523   Mon Nov 13 11:46:54 2023 TDSummary of AIDA 24cm x 8cm 'triple' DSSSD tests   Summary_of_AIDA_tests_2022-3_-_Dec_2023.pdfSummary_of_AIDA_tests_2022-3_-_Dec_2023.pptx 
  522   Thu Oct 12 14:01:43 2023 TDMSL type BB18 24cm x 8cm DSSSD test - update
DSSSD MSL type BB18 24cm x 8cm 3208-3/3208-21/3208-22
 Screenshot_from_2023-10-12_15-13-30.pngScreenshot_from_2023-10-12_15-17-05.png 
  521   Sun Oct 1 11:47:07 2023 TDS4 cooling water
The photographs show the cooling water controls
and temperature/pressure gauges outside S4
 1000007356.jpg1000007355.jpg 
  520   Thu Aug 31 15:24:56 2023 NHNew AIDA MBS PCThe AIDA MBS FDR will be x86l-119 from now
on, not x86l-94
  
  519   Mon Aug 28 12:47:56 2023 NHPower Failure 24.08.2023There was a power failure in the morning of
24.08.2023 in the Rhein-Main area affecting
GSI
  
  518   Sun Jul 16 09:32:57 2023 TDFirefox browser proxy setting change
Firefox browser proxy setting changed to
'Auto-detect proxy settings for this network'
  
  517   Wed Jan 18 13:40:33 2023 PJCS TDMACB settings with either Emulator or VITARWhen using the VETAR connected
to the HDMI port of the root MACB the settings
for all the MACB in the system 0x3.
 macb_apr20.jedmacb_apr20.vhdzybo.jpgMACB.jpg 
  516   Fri Dec 16 14:02:12 2022 NHAIDA System off for christmas breakThe AIDA NIM crate, pis and workstation have
been powered off for the Christmas break
and will not be accessible
  
  515   Thu Oct 6 16:51:49 2022 NHOscilloscope analysisInvestigating AIDA noise with a TA041 differential
probe and oscilloscope 
 24x 
ELOG V3.1.4-unknown