AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 14 of 35  ELOG logo
  ID Date Author Subject Text Attachments
  442   Fri May 13 07:36:18 2022 OH, TDFriday 13 May08:36 DAQ Still running smoothly
      Currently on run R1_328
      At current data rates we have just
 35x 
  441   Fri May 13 06:56:14 2022 OH, BA, MALow Rates 




  
  440   Fri May 13 06:47:33 2022 ML2h-Shift ChecksIt has been a quiet night. AIDA has been
stable.

Stats appears stable appear
 Stats_Screenshot_from_2022-05-13_07-43-54.pngTemp_Screenshot_from_2022-05-13_07-43-13.pngHV_LC_Screenshot_from_2022-05-13_07-42-38.png 
  439   Fri May 13 04:45:23 2022 ML2h-Shift ChecksAIDA is running ok. Note that, in the last
hour or so, the rate of implant in DSSD1
is back to higher rate ~10 Hzto 15 Hz as
 Stats_Screenshot_from_2022-05-13_05-43-14.pngTemp_Screenshot_from_2022-05-13_05-42-10.pngHV_LC_Screenshot_from_2022-05-13_05-41-23.png 
  438   Fri May 13 02:56:36 2022 ML2h-Shift ChecksAll seemnormal on AIDA side.

Stats as before

Temperatures stable
 Stats_Screenshot_from_2022-05-13_03-43-34.pngTemp_Screenshot_from_2022-05-13_03-44-41.pngHV_LC_Screenshot_from_2022-05-13_03-41-28.png 
  437   Fri May 13 02:28:36 2022 MLbeam droppedWe see less counts in AIDA implant DSSD1
(~1Hz) than at the beginning of the night
shift (~10Hz).
  
  436   Fri May 13 00:50:16 2022 ML2h-Shift ChecksAll seems ok  (apart for my virgin
network connection usually quite reliable
but not so tonight !?!).
 Stats_Screenshot_from_2022-05-13_01-45-56.pngTemp_Screenshot_from_2022-05-13_01-47-31.pngHV_LC_Screenshot_from_2022-05-13_01-48-21.png 
  435   Thu May 12 22:49:39 2022 BA, MALow RatesThe rate is very low in all aida, not sure
.
 RatesLow2022-05-12_23-48-01.png 
  434   Thu May 12 21:43:49 2022 BA, MARates 

Statistic check (screenshot attached).

Temperatures OK (screenshot attached).
 Stati2022-05-12_22-47-26.pngTemp2022-05-12_22-48-41.pngLeakageCurrent2022-05-12_22-45-44.png 
  433   Thu May 12 16:30:47 2022 NH, OH, TDNotes for mounting a second switchUpdate DHCPD as expected
Make sure new ethernet device is trusted
in firewall
  
  432   Thu May 12 10:10:51 2022 TD, OHAIDA data throughput
Attachment 1 - top aida06
 15x 
  431   Thu May 12 07:09:43 2022 TDThursday 12 May 08:00-24:00
08.10 AIDA DAQ status
    
 27x 
  430   Thu May 12 00:37:52 2022 OH, AMThursday 12 May01:37 Over the past hour the degrader settings
have been checked by impinging 209Pb onto
the detectors.
 13x 
  429   Wed May 11 19:08:41 2022 CB, PPWednesday 11th May - evening shift20:19 no beam yet.

Statistic check (screenshot attached).

Temperatures OK (screenshot attached).
 16.png22.png13.png14.png 
  428   Wed May 11 07:04:13 2022 OH, NH, TDWednesday 11th May08:00 Overnight at some point it appears that
aida14 has stopped producing any ASIC data
      It is currently sending data pause
 9x 
  427   Tue May 10 07:41:28 2022 NH TDTuesday 10 May8:15am S4 CONTROLLED ACCESS to remove beam
plug and check bPlas/AIDA response to beam
 29x 
  426   Mon May 9 08:36:23 2022 TD, NHMonday 9 May
09.32 Re-start AIDA
 31x 
  425   Sun May 8 17:43:57 2022 NHAIDA FEE64 LayoutAIDA FEE64 layout with respect to the beam.  AIDA_Adapter_Configuration(1).png 
  424   Sun May 8 15:10:45 2022 TDSunday 8 May
DSSSD bias and FEE64 power OFF during Ge
install
 6x 
  423   Sat May 7 13:27:39 2022 TDAIDA configuration
Adaptor PCB link settings
  
ELOG V3.1.4-unknown