AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 15 of 35  ELOG logo
  IDdown Date Author Subject Text Attachments
  422   Sat May 7 09:55:53 2022 TDSaturday 7 May
Attachments 1 & 2 per FEE64 1.8.L spectra
 15x 
  421   Fri May 6 09:31:41 2022 TD NHFriday 6 May
10:30 DAQ appears to have stopped
 33x 
  420   Wed May 4 16:50:04 2022 NHAIDA 4th MaybPlas has been mostly cabled in now

Reseat LAN cable (AIDA Switch -> AIDA-3)
 Screenshot_20220504_174929.pngScreenshot_20220504_175201.png 
  419   Tue May 3 14:15:17 2022 NHAIDA Updates 2 May
PAUSE/RESUME stats are dominated by 2x FEE64s
- aida07 and aida16
  
  418   Mon May 2 13:08:49 2022 NHAIDA Updates 2 MayThe snout endcap has been sealed with new
copper tape over the red tape
 elog_temps1.pngalpha_1d.png 
  417   Mon May 2 09:52:20 2022 OHShifter checklist 2022Every 30 minutes:

- Reload statistics (Web browser tab screen
  
  416   Thu Apr 28 18:45:09 2022 NHAlpha Background Run Runs are in /TapeData/BGAPR22 located on 8TB
disk "SecondDrive" (N.B. 2A experiment is
using ThirdDrive)
 AnyDeskMSI_2022-04-28_19-47-33.pngAnyDeskMSI_2022-04-28_19-47-56.pngAnyDeskMSI_2022-04-28_19-48-13.png 
  415   Wed Apr 27 15:47:46 2022 NH, HA, SA, CJAIDA 27 Apr 22Remount snout in S4 (photos to come) 
Alignment with DEGAS OK but a bit short...
 DEGAS platform will be brought 31 mm closer
 7x 
  414   Fri Apr 8 08:59:42 2022 OH, NHFriday 8th April09:59 Noticed that the right hand ribbon cable
for aida07 was offset vertically by 1. i.e.
Only 1 of the 2 rows of pins in. Unbiassed
 11x 
  413   Thu Apr 7 12:42:14 2022 OH, NH, TDThursday 7 April
Re-assembled triple snout re-installed on
the AIDA stand - DSSSD ribbon cables and
 8x 
  412   Wed Apr 6 10:09:21 2022 OH, NH, TDWednesday 6 AprilDSSSD bias OFF. DAQ STOPped

Attachment 6 FEE64 temps OK
 6x 
  411   Tue Apr 5 12:46:52 2022 TDMSL type BB18(DS)-1000 triple - cable lengths
OH/NH disassembling current AIDA triple snout
and DSSSD stack.
  
  410   Tue Apr 5 08:52:16 2022 TDTuesday 5 AprilDSSSD bias OFF. DAQ STOPped

Attachment 1 FEE64 temps OK
 6x 
  409   Mon Apr 4 09:19:49 2022 TDMonday 4 AprilAIDA adaptor PCB config - all LKs removed
*except*
 12x 
  408   Sun Apr 3 10:56:11 2022 TDSunday 3 April
all system wide checks OK *except* aida10
failed ADC calibration
 35x 
  407   Sat Apr 2 10:42:49 2022 TDSaturday 2 April11.10 Found aida08 not running - merger/TapeServer
stalled
 21x 
  406   Wed Mar 9 10:15:56 2022 NH TDWednesday 9 March - noise tests contd.11.15 - S4 is currently closed no access

If access possible (should be) plan is
 38x 
  405   Tue Mar 8 10:26:56 2022 TD NHTuesday 8 March 2022
11.25 System wide checks OK except aida06
clock fail status 6 - attachments 1-13
 40x 
  404   Mon Mar 7 12:20:26 2022 NH, TDAIDA Grounding Checks Mon 7 MarRemove all DSSD ribbon cable braid ground
from FEE64s to check n+n ground loops
 14x 
  403   Sat Mar 5 10:43:45 2022 OH, NHGrounding and noise tests 4th-5th March SummaryTests performed


After
leaving overnight noticed the pulser was
not fully inserted into aida09

Little
 13x 
ELOG V3.1.4-unknown