  391   Fri Oct 29 10:49:01 2021 OHNoise tests - 28th October -29th OctoberPlan for the day was to connect a mechanical
ground to the FEEs connected to DSSD0 1,
2, 3, 4, 9, 10, 11 and 12
 24x 
  390   Wed Oct 27 15:12:50 2021 OH, NHNoise tests - 27th October Began by installing the triple.
Only the upstream detector was connected
to the FEEs the downstream detector cables
 6x 
  387   Thu Oct 21 09:33:08 2021 OHNoise tests - 21st Oct 2021Pulser was left on overnight with the bias
filters on
First plot is FEE14 not FEE8
 211021_0951_fee8_x8L.png211021_0953_fee14waveform_zoom.png211021_0956_fee14_waveform.png211021_0957_fee8_x8L.png211021_0959_fee8_waveform_zoom.png 
  574   Mon Apr 15 09:23:43 2024 CC, JB, HMA, TDNoise in AIDA when connecting BB79:40 started up AIDA. TEMP OK. Noise condition
same as Saturday. Attachments 1-3.

9:56 BB7 premaps connected but
 13x 
  462   Mon May 16 17:23:27 2022 TDNewMerger stats   Screenshot_from_2022-05-16_18-17-10.pngScreenshot_from_2022-05-16_18-17-50.pngScreenshot_from_2022-05-16_18-18-24.pngScreenshot_from_2022-05-16_18-20-02.png 
  51   Mon May 20 13:33:06 2019 NHNew Merger/MBS Test RunsNew merger has been worked on by VP which
fixes the timewarp issues and MBS integration.

Currently no WAVE capture is supported,
 8x 
  61   Tue Aug 13 13:55:45 2019 NHNew Merger/MBS Test RunsAIDA Finally working again so can test
VP's added WAVE histogramming mode.

Fig 1. Waveforms for FEE12 ASIC
 6x 
  157   Wed Mar 18 18:02:37 2020 PJCSNew Firmware loaded in all FEE64sLoaded new frimware into all 12 FEE64s
in the system. IWR_Dec19_4.bin 

Booted ok after power-cycle.  
  
  102   Wed Nov 27 16:33:50 2019 NHNew Bias & WaveformsHV core (-160 V) now attached to bottom
3 FEEs (with grounded kapton)

DSSDs bias OK, leakages unchanged
 waves_new_odd.pngwaves_new_even.png 
  520   Thu Aug 31 15:24:56 2023 NHNew AIDA MBS PCThe AIDA MBS FDR will be x86l-119 from now
on, not x86l-94
  
  675   Wed Dec 11 14:46:21 2024 TD, JB, CC, MPMounting of AIDA, bPlast and BB7 for testSnout assembled for detector position and
timing test.

The planned test is to use a BGO
 20241211_161837.jpg20241211_161833.jpg20241211_161830.jpg20241211_161820.jpg 
  537   Thu Mar 14 13:00:23 2024 JB, NH, MA, AM, GAMounting and biasing DSSD 2new Downstream DSSD2: 3208-2/3208-5/3208-8

Covered with black cloth.
  
  536   Thu Mar 14 12:13:17 2024 JB, NH, MAMounting and biasing DSSD 1Upstream bPlast mounted

new Upstream DSSD: 3208-2/3208-5/3208-8
  
  38   Mon Apr 1 08:50:35 2019 CA, TDMonday April 1st 2019 - BEAM START09.28 System wide checks - aida06 global clock
failure (check clock status)
 18x 
  426   Mon May 9 08:36:23 2022 TD, NHMonday 9 May
09.32 Re-start AIDA
 31x 
  181   Mon Mar 8 17:02:38 2021 CAMonday 8th March 18:00 - 00:0018:00 ASIC settings 2019Dec19-16.19.51
      DSSSD#1 slow comparator 0xa
      DSSSD#2 slow comparator 0xa
 12x 
  179   Mon Mar 8 07:02:17 2021 CA, LSMonday 8th March 08:00 - 17:0008:00 ASIC settings 2019Dec19-16.19.51
      DSSSD#1 slow comparator 0xa
      DSSSD#2 slow comparator 0xa
 24x 
  178   Sun Mar 7 23:13:50 2021 OHMonday 8th March00:00 ASIC settings 2019Dec19-16.19.51
      DSSSD#1 slow comparator 0xa
      DSSSD#2 slow comparator 0xa
 13x 
  566   Mon Apr 8 16:39:00 2024 JB, CC, TDMonday 8 April
17.32 Power and detector bias cycle
 11x 
  359   Mon Jun 7 10:33:48 2021 TDMonday 7 June11.30 DAQ continues OK - file S496/R32_144
      alpha background
 9x 