| |
ID |
Date |
Author |
Subject |
Text |
 |
|
|
391
|
Fri Oct 29 10:49:01 2021 |
OH | Noise tests - 28th October -29th October | Plan for the day was to connect a mechanical
ground to the FEEs connected to DSSD0 1,
2, 3, 4, 9, 10, 11 and 12
|
24x |
|
|
390
|
Wed Oct 27 15:12:50 2021 |
OH, NH | Noise tests - 27th October | Began by installing the triple.
Only the upstream detector was connected
to the FEEs the downstream detector cables |
6x |
|
|
387
|
Thu Oct 21 09:33:08 2021 |
OH | Noise tests - 21st Oct 2021 | Pulser was left on overnight with the bias
filters on
First plot is FEE14 not FEE8
|
    |
|
|
574
|
Mon Apr 15 09:23:43 2024 |
CC, JB, HMA, TD | Noise in AIDA when connecting BB7 | 9:40 started up AIDA. TEMP OK. Noise condition
same as Saturday. Attachments 1-3.
9:56 BB7 premaps connected but |
13x |
|
|
462
|
Mon May 16 17:23:27 2022 |
TD | NewMerger stats | |
   |
|
|
51
|
Mon May 20 13:33:06 2019 |
NH | New Merger/MBS Test Runs | New merger has been worked on by VP which
fixes the timewarp issues and MBS integration.
Currently no WAVE capture is supported, |
8x |
|
|
61
|
Tue Aug 13 13:55:45 2019 |
NH | New Merger/MBS Test Runs | AIDA Finally working again so can test
VP's added WAVE histogramming mode.
Fig 1. Waveforms for FEE12 ASIC |
6x |
|
|
157
|
Wed Mar 18 18:02:37 2020 |
PJCS | New Firmware loaded in all FEE64s | Loaded new frimware into all 12 FEE64s
in the system. IWR_Dec19_4.bin
Booted ok after power-cycle. |
|
|
|
102
|
Wed Nov 27 16:33:50 2019 |
NH | New Bias & Waveforms | HV core (-160 V) now attached to bottom
3 FEEs (with grounded kapton)
DSSDs bias OK, leakages unchanged |
 |
|
|
520
|
Thu Aug 31 15:24:56 2023 |
NH | New AIDA MBS PC | The AIDA MBS FDR will be x86l-119 from now
on, not x86l-94
|
|
|
|
675
|
Wed Dec 11 14:46:21 2024 |
TD, JB, CC, MP | Mounting of AIDA, bPlast and BB7 for test | Snout assembled for detector position and
timing test.
The planned test is to use a BGO |
   |
|
|
537
|
Thu Mar 14 13:00:23 2024 |
JB, NH, MA, AM, GA | Mounting and biasing DSSD 2 | new Downstream DSSD2: 3208-2/3208-5/3208-8
Covered with black cloth. |
|
|
|
536
|
Thu Mar 14 12:13:17 2024 |
JB, NH, MA | Mounting and biasing DSSD 1 | Upstream bPlast mounted
new Upstream DSSD: 3208-2/3208-5/3208-8
|
|
|
|
38
|
Mon Apr 1 08:50:35 2019 |
CA, TD | Monday April 1st 2019 - BEAM START | 09.28 System wide checks - aida06 global clock
failure (check clock status)
|
18x |
|
|
426
|
Mon May 9 08:36:23 2022 |
TD, NH | Monday 9 May |
09.32 Re-start AIDA
|
31x |
|
|
181
|
Mon Mar 8 17:02:38 2021 |
CA | Monday 8th March 18:00 - 00:00 | 18:00 ASIC settings 2019Dec19-16.19.51
DSSSD#1 slow comparator 0xa
DSSSD#2 slow comparator 0xa
|
12x |
|
|
179
|
Mon Mar 8 07:02:17 2021 |
CA, LS | Monday 8th March 08:00 - 17:00 | 08:00 ASIC settings 2019Dec19-16.19.51
DSSSD#1 slow comparator 0xa
DSSSD#2 slow comparator 0xa
|
24x |
|
|
178
|
Sun Mar 7 23:13:50 2021 |
OH | Monday 8th March | 00:00 ASIC settings 2019Dec19-16.19.51
DSSSD#1 slow comparator 0xa
DSSSD#2 slow comparator 0xa
|
13x |
|
|
566
|
Mon Apr 8 16:39:00 2024 |
JB, CC, TD | Monday 8 April |
17.32 Power and detector bias cycle
|
11x |
|
|
359
|
Mon Jun 7 10:33:48 2021 |
TD | Monday 7 June | 11.30 DAQ continues OK - file S496/R32_144
alpha background
|
9x |