AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 25 of 35  ELOG logo
ID Date Author Subjectdown Text Attachments
  479   Fri Jun 10 10:32:46 2022 NHFri 10 JunProbe PSU output with 'scope again and 10X
probe
 8x 
  518   Sun Jul 16 09:32:57 2023 TDFirefox browser proxy setting change
Firefox browser proxy setting changed to
'Auto-detect proxy settings for this network'
  
  397   Tue Mar 1 08:29:19 2022 OH, NHFindings from the upgrade to centos7 from SL6Required packages not included as default


csh
(For running MIDAS scripts)
xinetd
(Runs the rdate server for the FEEs)
Telnet
 TapeServer.desktopScreenshot_from_2022-03-01_09-40-18.png 
  222   Thu Apr 15 12:23:22 2021 NHFast Discriminator MasksIt is possible to get good rates with the
fast discriminators with a few hot channels
mask in aida03 and aida10
 Image_Pasted_at_2021-4-14_18-57.png 
  362   Wed Jun 9 19:17:21 2021 TDFEE64 system console logs    logs-090621.tar.gz 
  3   Thu Sep 6 15:42:53 2018 OH, TDFEE64 system console logs
Kernel panics during boot cab be observed
in files ttyUSB1 and ttyUSB5
 logs.tar 
  562   Sun Apr 7 13:08:52 2024 TDFEE64 configurationFEE64 configuration per https://elog.gsi.de/despec/S100/6

Configuration: Wide - 16 FEEs, 2 DSSD
 AIDA_S100_WiringPlan.drawio.png 
  293   Tue May 4 14:26:50 2021 NHFEE64 Adapter wiring diagram and layoutA figure showing the FEE64 numbers (a previous
diagram had 2/6 and 4/8 on the wrong side
of the DSSD) and the wiring of pulser/HV
 AIDA_Adapter_Configuration(1).png 
  116   Thu Dec 19 14:45:42 2019 TDFEE64 ASIC settings - different diode link settings[npg@aidas-gsi 2019Oct31-13.24.23]$ pwd
/MIDAS/DB/EXPERIMENTS/AIDA/2019Oct31-13.24.23
[npg@aidas-gsi 2019Oct31-13.24.23]$ /bin/csh
  
  388   Thu Oct 21 16:18:51 2021 OHFEE and Adaptor board groundingsDuring investigations into the noise today
by NH and OH a couple of findings were made
on the grounding of the FEEs and Adaptor
  
  389   Tue Oct 26 16:08:46 2021 NHFEE and Adaptor board groundings> During investigations into the noise today
by NH and OH a couple of findings were made
on the grounding of the FEEs and Adaptor
  
  29   Thu Mar 21 14:10:10 2019 NHFEE TemperaturesAll 12 FEEs powered up, and temperatures
are OK.

Passed ASIC checks and system wide
 FEETemps.png 
  275   Sat Apr 24 05:17:51 2021 MLEnd of beamBeam has now stopped (end of expriment)
and background measurements starts.
  
  156   Mon Mar 16 07:25:24 2020 NHEnd of Experiment08:25 Beam Stopped, end of S480

Tape Server stopped at R12_2097

Started again in no storage mode
  
  34   Fri Mar 22 15:44:20 2019 NHEnd of 22.03.2019End of the day - Detector unbiased and
FEE64s turned off for the weekend as they
won't be monitored.
  
  541   Tue Mar 19 10:17:30 2024 NHDry Run 2024 - 19th March 24AIDA has 8 FEEs and 1 DSSSD 

Aida08 (HDMI#12) had no WR again, I moved
 Screenshot_from_2024-03-19_13-44-34.pngScreenshot_from_2024-03-19_13-44-22.pngScreenshot_from_2024-03-19_13-44-04.pngScreenshot_from_2024-03-19_13-43-44.pngScreenshot_from_2024-03-19_13-43-24.png 
  69   Wed Oct 30 11:51:08 2019 CA, TD, NHDetector biasing12.51 - detector bias and leakage currents
- detector 3 has no current
                                        
 bias30Oct.png30Octbias2.pnghvsketch.pdf 
  639   Wed Jun 5 08:34:47 2024 JB. AM, MP, MYDetector bias testsWe are trying to bias each system on its
own and in sequence biasing each other detector
system to see the interdependence.
 14x 
  11   Thu Dec 6 15:31:40 2018 TD, CA, NHDecember 6th 201815.32 1.8.W spectra for aida01, aida09, aida10,
aida11, aida12 (attachments 1, 2, 3)
      2 and 3 expanded in Y and X direction
 11x 
  104   Fri Dec 6 20:34:56 2019 CA, DK, NHDec 6 Night Shift21.35 AIDA DAQ currently running, TapeService
on, not writing to storage
 15x 
ELOG V3.1.4-unknown