Tue Jul 22 17:00:26 2025, MP, CC, Status 
|
Test with shielded HV cables for both detectors.
The FWHM for ch1 is now 184 ch.
Yesterday cables for cards 5, 6, 10, 11, 12, 14, 16 were partially connected (only 1 out of 2 flat cables was in), now both are connected. |
Mon Jul 21 13:01:19 2025, MP, Status 
|
Status before grounding checks |
Sun Apr 18 17:27:44 2021, ML-OH, system wide checks 17x
|
system wide checks at 6pm CET
##################################################
Difference noted from previous shift: |
Sun Apr 18 19:05:33 2021, ML-OH, All spectra reset
|
All spectra reset at 8pm CET.
|
Sun Apr 18 21:43:01 2021, ML-OH, system wide checks 20x
|
New System wide check 10pm CET
Clock status test result: Passed 12, Failed 0
Understand status as follows |
Fri Apr 16 05:13:09 2021, ML, system wide checks 16x
|
system wide checks:
Done around 4am.
################################# |
Sat Apr 24 01:44:09 2021, ML, system wide checks 7x
|
system wide checks:
|
Sat Apr 24 03:13:05 2021, ML, AIDA DAQ Reset
|
AIDA PC crashe completely at ~3:30am CET.
Tom was called and he Restarted the AIDA system at ~4am with Run 52.
Not sure what cause the crash but AnyDesk remote connection was suddenly lost and once reconnected all Terminal sessions were gone. |
Sat Apr 24 03:32:11 2021, ML, quick checks
|
Quick system checks after crash
Temperature ok.
Still cannot connect remotely to /ucesb with my gsi web login and password (?). |
Sat Apr 24 04:07:23 2021, ML, ucesb scalers
|
ucesb is back - see attachment |
Sat Apr 24 04:50:01 2021, ML, Spectra 8x
|
Some screenshot of spectra attached |
Sat Apr 24 05:17:51 2021, ML, End of beam
|
Beam has now stopped (end of expriment) and background measurements starts. |
Fri May 21 02:17:47 2021, ML, system wide checks 9x
|
Wide check at 3am -
All fine.
Same output as at the beginning of the shift (see my previous entry) and attachments. |
Fri May 21 06:09:28 2021, ML, system wide checks 8x
|
System wide checks at 7am CET
All seems fine, nothing significant to report
Slight increase of dead time noted in FEE 3, 5 and 7. |
Fri May 13 00:50:16 2022, ML, 2h-Shift Checks  
|
All seems ok (apart for my virgin network connection usually quite reliable but not so tonight !?!).
Statistics seems ok.
Temperatures appears stable |
Fri May 13 02:28:36 2022, ML, beam dropped
|
We see less counts in AIDA implant DSSD1 (~1Hz) than at the beginning of the night shift (~10Hz).
This seems to be beam related as the count rates in DESPEC & FRS Scalers seems to have dropped too. |
Fri May 13 02:56:36 2022, ML, 2h-Shift Checks  
|
All seemnormal on AIDA side.
Stats as before
Temperatures stable |
Fri May 13 04:45:23 2022, ML, 2h-Shift Checks  
|
AIDA is running ok. Note that, in the last hour or so, the rate of implant in DSSD1 is back to higher rate ~10 Hzto 15 Hz as at the beginning of this
shift.
Stats seems ok |
Fri May 13 06:47:33 2022, ML, 2h-Shift Checks  
|
It has been a quiet night. AIDA has been stable.
Stats appears stable appear
Temperature also stable |
Fri May 13 23:37:59 2022, ML, 2h-Shift Checks   
|
Took over remotely from CB about an hour ago
At 0h40 (CET):
Stats still ok - attach 1
Leakage still OK - Attach 2
Temps
- attach 3
Grafana OK
UCESB rates ok - attach 5
System-wide checks: aida09 fails clock (1), aida02 06 09 10 13 fail ADC calibration,
all pass WR |