91
|
Mon Nov 11 10:34:19 2019 |
NH | Alpha Analysis (11.11.19) | Analysis of approx 20GB of data since Thursday
night (not continuous - estimate of hours
incominG) |
9x |
241
|
Sun Apr 18 19:05:33 2021 |
ML-OH | All spectra reset | All spectra reset at 8pm CET.
|
|
94
|
Tue Nov 12 14:10:18 2019 |
NH, OH, CA | Aida10 Unusual Pulser Peak | aida10 (no alpha rate recorded) has a strange
pulser peak - looks like double peak?
Pulser terminator checked and OK... |
  |
95
|
Wed Nov 13 01:54:00 2019 |
TD | Aida10 Unusual Pulser Peak | Double peaking normally indicates periodic
baseline variations with period comparable
to shaping time |
|
593
|
Tue Apr 23 10:52:39 2024 |
PP | Aida02 down and back | We lost aida02 at about 11:25 again. Nick
fixed it about 11:50.
It is now back in the DAQ. |
|
65
|
Fri Aug 16 15:09:05 2019 |
NH | Aida Waves (All FEEs) | Included waves for all 12 FEEs
FEES 1, 5, 9 all show this HF noise
on it, and are all located at the top of |
12x |
59
|
Fri Aug 9 12:33:14 2019 |
NH | Aida Test 9/8/19 - FEES 1-6 | The water issue has been resolved - merely
incorrect temperature guages (replaced).
Water is 20 C as required. |
|
54
|
Fri Jun 28 15:05:49 2019 |
NH | Aida 28/6/2019 - WATER OFF | The humidity sensor hasn't reported
humdities under 90% yet. In order to try
and help dry the pipes and turn AIDA the |
|
56
|
Mon Jul 8 16:02:52 2019 |
NH, PJCS | Aida 28/6/2019 - WATER OFF | It occurs to to wonder if there is now
water inside the modules. If the metal of
the cooling plates is damp on the outside |
|
380
|
Fri Sep 3 13:39:42 2021 |
OH | Additional noise tests performed at GSI | Contents of an email from NH to OH and TD
about tests performed on an additional bias
supply:
|
   |
112
|
Thu Dec 19 13:06:02 2019 |
TD, NH | AIDA@DESPEC To Do list | FAIR phase 0 DESPEC experiments are scheduled
March-May 2020 see
|
|
2
|
Thu Sep 6 15:25:19 2018 |
OH, TD | AIDA@DESPEC Setup Photos | |
|
92
|
Tue Nov 12 13:22:19 2019 |
OH, NH, CA | AIDA09 Replacement | ASIC 1 on FEE9 was not producing signals.
A new HDMI cable was installed but still |
|
57
|
Wed Jul 10 10:46:05 2019 |
NH | AIDA/Water 10.07.2019 | S4 Conditions:
25.2 C, 35.3% RH, Td = 8.8 C
Water temperature: 20 C |
|
384
|
Tue Oct 19 16:17:49 2021 |
OH | AIDA-gsi server to centos 7 | Following advice of CU have updated the server
to centos 7.
|
|
4
|
Thu Sep 13 17:21:59 2018 |
TD | AIDA upstream window |
The upstream window of the AIDA detector
assembly consists of 2x 50um aluminized mylar |
|
206
|
Wed Mar 24 10:31:03 2021 |
TD | AIDA to do (or to understand) list |
In no particular order
|
|
677
|
Mon Dec 16 13:07:04 2024 |
JB, MP, CC | AIDA timing test | https://elog.gsi.de/despec/Implantation+Stack/9?suppress=1
- Day 1 ELOG
Day2: |
16x |
678
|
Tue Dec 17 12:45:36 2024 |
JB, MP, CC | AIDA timing test |
|
  |
683
|
Wed Jan 8 16:47:05 2025 |
JB, MP, CC | AIDA timing test |
|
|