Wed Jan 29 12:22:13 2020, NH, aida10 troubleshooting  
|
aida10 has no ASIC events when running without pulser
DSSD ribbon cable was replaced, no change
|
Wed Jan 29 19:09:51 2020, NH, aida10 troubleshooting
|
> aida10 has no ASIC events when running without pulser
>
> DSSD ribbon cable was replaced, no change
|
Wed Jan 15 14:53:41 2020, NH, AIDA Noise 14.01.2019 6x
|
Checking noise
DESPEC crate entirely offline except:
|
Mon Jan 20 14:01:23 2020, NH, AIDA Noise 20.01.2019 6x
|
> Checking noise
>
> DESPEC crate entirely offline except:
|
Fri Dec 20 12:04:03 2019, NH, TD, Friday 20 December 2019 7x
|
Fig 1: DSSD Leakage currents ok
Fig 2: FEE Temps ok
|
Fri Dec 20 10:19:29 2019, NH, Alpha Analysis (Pre Run) 
|
======================================
AIDA Unpacker Analysis |
Thu Dec 19 14:45:42 2019, TD, FEE64 ASIC settings - different diode link settings
|
[npg@aidas-gsi 2019Oct31-13.24.23]$ pwd
/MIDAS/DB/EXPERIMENTS/AIDA/2019Oct31-13.24.23
[npg@aidas-gsi 2019Oct31-13.24.23]$ /bin/csh
|
Thu Dec 19 14:26:09 2019, TD, BNC PB-5 - Manual
|
|
Thu Dec 19 14:07:38 2019, TD, Report - low - aida08 ADC spectrum size 32k cf. 64k channels expcted using layout 6x
|
Note that aida08 spectrum 1.8.L size is (shown as) 32k channels cf. 64k channels expected using layout - attachment 1 - 5
Layout configuration - attachment 6
Why?
|
Thu Dec 19 13:09:32 2019, TD, MIDAS app launcher command lines
|
App Path
|
Thu Dec 19 13:06:02 2019, TD, NH, AIDA@DESPEC To Do list
|
FAIR phase 0 DESPEC experiments are scheduled March-May 2020 see
https://www.gsi.de/en/work/organisation/scientific_boards/user/beam_time.htm
|
Thu Dec 19 10:11:59 2019, TD, Report - medium - FEE64 panics during boot
|
Some of the FEE64s aida01 .. aida12 panic during boot
|
Thu Dec 19 09:22:52 2019, TD, Thusrday 19 December 21x
|
10.15 Found DAQ running at c. 1M data items/s
Rate spectra show aida09 1.*.H and one 1x LEC channel of aida08 asic running hot
|
Wed Dec 18 17:39:27 2019, TD, Wednesday 18 December 23x
|
18.40 Detector biases & leakage currents OK - attachment 1
FEE64 temperatures OK - attachment 2
|
Wed Dec 18 02:44:27 2019, NH, 17.12.19, 18.12.19 7x
|
Beam: 238U (850 MeV/u)
Fragment: 168Re
|
Mon Dec 16 14:48:02 2019, NH TD, AIDA 16.12.19    
|
DSSD Snout was reassembled to install the second bPlast (downstream)
(fig 1)
|
Wed Dec 11 10:58:52 2019, NH, Initital Dec. Analysis 11x
|
Fig 1: 2D hit pattern of each AIDA DSSD for MBS run 24 (40Ar primary beam, centred)
Low statistics in DSSD2 partly due to low energy deposition
|
Sat Dec 7 02:39:02 2019, DK, NH et al., 34Si Fragments PID   
|
See attached
Tentative PID (DK) as attachment #3
|
Fri Dec 6 20:34:56 2019, CA, DK, NH, Dec 6 Night Shift 15x
|
21.35 AIDA DAQ currently running, TapeService on, not writing to storage
System wide checks ok
|
Thu Dec 5 22:00:11 2019, CA, DK, NH, Dec 5 Night Shift 30x
|
15:30
TD found the merger was running at ~43 Mb/s
The odd-numbered FEE64s all had significant (>200k) disk rates
|
Wed Nov 27 16:33:50 2019, NH, New Bias & Waveforms 
|
HV core (-160 V) now attached to bottom 3 FEEs (with grounded kapton)
DSSDs bias OK, leakages unchanged
No appreciable change in waveforms |
Fri Nov 22 08:55:31 2019, NH, Waveforms   
|
AIDA Waveforms immediately after beam at 21.11.19 8am or so. |
Mon Nov 25 13:25:51 2019, NH, Waveforms 
|
> AIDA Waveforms immediately after beam at 21.11.19 8am or so.
Update 25.11.19 with all FEE64 waveforms added
|