Thu Jan 9 12:46:43 2025 |
JB, MP, CC | AIDA timing test |
Quote: |
Quote: |
https://elog.gsi.de/despec/Implantation+Stack/9?suppress=1 - Day 1 ELOG
Day2:
10:14 we set up the detector with the pulser in BB7 and started biasing the detector and setting up the DAQ. Water flow and temperature check, OK. 677/1 677/2 677/3
FEE temps OK. Screenshots included for LOCAL controls for aida07, Discriminator for aida07, ASIC control for aida01 ASIC # 1,2,3,4 and the pulser setting - 1 V @ 10 Hz rep. 677/4 677/5 677/6 677/7 677/8 677/9
ASIC thresholds for the fast comparator LEC/MEC set to 0x20 for all the ASICs in aida10 - connected to BB7. Act on all ASICs did not work with this so each threshold was set to 0x20 on each ASIC by hand.
The pulser is now connected to BB7 test + and via a T-connector to the scope, triggering on the pulser signal. We saw now signals --> lower the threshold of the fast comparator to 1 MeV - 0x64 on all ASICs in aida10. 677/10
No signal was observed, threshold was then set to 0x190 (400 keV) 677/11
13:00 We resumed after lunch. It seems that our thresholds were way too high for starters each channel was actually 100 keV in HEX. We then set the thresholds in aida10 to 0x32, 0x20, 0x20, 0x11 for ASIC 1,2,3,4, respectively. This was to achieve a 10 Hz hit rate in all of the channels! This was done successfully see 677/12 for the hit rate spectrum and also 677/13-16 for the thresholds.
|
The pulser was set to 0.5 V to test if we can still see the time spectrum between AIDA and bPlast with reduced thresholds -- mimicking a beta event.
These thresholds were changes from 0x32, 0x20, 0x20, 0x11 for ASIC 1,2,3,4 ---> 0x10, 0x10, 0x0d, 0x10.
This was set to have the HitRate in aida10 to be just above the noise.
|
Initial results: copy from DESPEC elog.
We have managed to obtain the time difference between the bPlast White rabbit and the AIDA Fast time. We had to gate out the zero fast-time events and then also condition that we only take the data from aida10. We see this in 684/1. Then if we look at the time difference between the fast time and the bPlast WRT we see a sharp peak at zero, this makes sense as the AIDA fast time discriminator is being triggered by a pulser which is then being used as a trigger for bPlasts DAQ so these events should be virtually arriving without delay. The delay we do see is infact around 750 ns.
The data collected overnight was also analysed as shown in 684/3 this is the data accumulated with the 22Na source close to the snout and a global threshold in the fast discriminator of 0x0f. The centre peak was roughly fitted with a gaussian:
NO. NAME VALUE ERROR SIZE DERIVATIVE
1 Constant 1.21277e+03 2.74526e+01 5.66915e-01 -5.61074e-07
2 Mean -1.78513e+02 8.50699e+00 1.62947e-01 1.58554e-06
3 Sigma 3.48571e+02 4.03993e+00 6.26343e-05 -1.86863e-03 |
Attachment 1: AIDAfasttime_bPlastWRdt_AIDA10.png
|
|
Attachment 2: AIDACalAdcFasttime.png
|
|
Attachment 3: AIDAfasttime_bPlastWRdt_AIDA10_nopulser.png
|
|
Attachment 4: Centrepeak_gauss_fit.png
|
|
396
|
Wed Feb 16 10:32:52 2022 |
PJCS | AIDA software changes and some suggestions |
The Pi console monitor program now outputs a full date/time to file for each line of report.
The System Wide Checks has been upgraded to include a check of the PLL lock monitor counters. A baseline is taken when the software starts, or at the users command, then subsequent operation of the command compares the current counter value with the baseline. There are two PLLs on the pcb, LMK3200, and the remainder are in the FPGA. Should there be a disruption in the external clock source to the FEE64 then it is possible the Lock signal from one or more of the PLLs will go false to indicate the PLL is not locked to the input frequency. This transition is counted in the FPGA. If the clock source recovers then this is the only way to understand that a hiatus has occurred.
Noted this morning that the Options file sizes are different and there is no common update date across the 16. I will further improve this function to try and indicate differences ... if required ?
aida07 ADCs will not calibrate. I have attempted to understand why but I have not seen this behaviour before. I suggest, if this is a problem, that a power-cycle be carried out and then the module is replaced if no improvement is noted.
Merger message logging. I have transferred across my version of the New Merger to the npg folder. /home/npg/Patrick/NewMerger. It runs from the command /home/npg/Patrick/NewMerger/MergeServer/bin64/run and is currently set for 16 links. The only changes to the NewMerger code have been made in the message.c file. The rest is untouched.
This version will create a log file directory in /MIDAS/log/Merge_Logs. A new directory structure is created here each time the New Merger is started. The directory is named using the date and a number which refers to the number of times the New Merger has been started on that date. ( /MIDAS/log/Merge_Logs/16_02_22_5 )
Within this directory are text files storing the messages from each of the processes in the New Merger system. The link file messages are stored in a sub-directory as they are currently named by the process number and not the link number. (/MIDAS/log/Merge_Logs/16_02_22_5/links/Link_1529.txt )
The purpose of this change is to be able to correlate error messages reported from the FEE64 consoles with information from the Merger processes.
The system is currently running with this software for the next fortnight. |
681
|
Wed Jan 8 10:08:29 2025 |
JB, GB, SD, MP, CC, JG | AIDA noise test with platform in position |
Yesterday we spent time essentially performing a dry run to get AIDA DAQ and bPlast into the time sorter, there were some issues with the AIDA mbs PC x86l-119 which was related to some boot issue, it was booting to a newer version of debian while the Relay for AIDA to MBS is on an older version (scratch) (the machine is quite old). We spent a bit of time getting the thresholds correct for each of the ASICs. In the end we just elected to have a blanket level of 0x0f for all of the ASICs when we removed the pulser.
Last night we left the setup with the following thresholds on all of the FEEs to collect data. 681/1. The pulser was also turned off and the 22Na source was moved close to the snout.
This morning c. 9:25 we returned and checked the temperatures, HV and statistics and everything seems to be ok. The only problem was that the timesorter has crashed this morning at 8 am. |
Attachment 1: Screenshot_from_2025-01-09_09-32-08.png
|
|
Attachment 2: Screenshot_from_2025-01-09_09-35-11.png
|
|
Attachment 3: Screenshot_from_2025-01-09_09-32-20.png
|
|
Attachment 4: Screenshot_from_2025-01-09_09-31-58.png
|
|
702
|
Tue Apr 8 08:52:39 2025 |
TD | AIDA grounding |
AIDA DSSSDs and FEE64-DSSSD cabling are electrically isolated (by design) from snout, mounting rods and support assembly.
FEE64-DSSSD ribbon cables screened by 3M 1245 Cu foil, drain wire to FEE64 adaptor PCB
AIDA FEE64s are electrically isolated (by design) from the AIDA support frame and each other.
BNC PB-5 test signal
daisy chained to FEE64 adaptor PCBs via screened RG174 cable/Lemo 00-250
CAEN N1419ET DSSSD bias
daisy chained to 1x p+n junction FEE64 adaptor PCB/Si wafer via screened RG174 cable/Lemo 00-250
CAEN N1419ET outputs floating, locally grounded by 1x n+n Ohmic FEE64 adaptor PCB link/DSSSD
AIDA FEE64s are connected to the DESPEC 19" rack
power (AIDA FEE64 PSUs),
timestamp (AIDA NIM MACB modules),
system console (via serial-USB cables to USB hubs),
RJ45 network cables (24 port Gbit network switch)
AIDA PSU PowerStax MS1U-6C-222233-01 - see attachments 1-2
PSU outputs V+/V- and common
no direct ground connection
AIDA MACB
HDMI cabling MACB-FEE64 is screened and shield is grounded
system console
?
RJ45 network cables are coupled by ferrite beads to FEE64 PCB and network switch
no direct ground connection |
Attachment 1: powerstax-ms1u_instructionmanua.pdf
|
|
Attachment 2: 20250408_095624.jpg
|
|
8
|
Thu Sep 20 09:39:17 2018 |
TD | AIDA downstream window |
The AIDA downstream window ('endcap' of snout) consists of 2x 50um aluminized mylar sheets |
432
|
Thu May 12 10:10:51 2022 |
TD, OH | AIDA data throughput |
Attachment 1 - top aida06
Attachment 2 - top aida01
Attachment 3 - top aida-gsi (AIDA server)
Attachment 4 - TapeServer
Attachment 5 - NewMerger stats block 6 (aida06)
Attachment 6 - NewMerger stats block 1 (aida01)
Attachment 7 - NewMerger stats block 0 (all FEE64s)
Attachment 8 - NewMerger options
Attachment 9 - NewMerger link stats
Attachment 10 - NewMerger
Attachments 11-14 - ADC, pause, resume & correlation scaler data item stats
Attacgment 15 - Network traffic |
Attachment 1: Screenshot_from_2022-05-12_11-08-34.png
|
|
Attachment 2: Screenshot_from_2022-05-12_11-07-44.png
|
|
Attachment 3: Screenshot_from_2022-05-12_11-07-14.png
|
|
Attachment 4: Screenshot_from_2022-05-12_11-05-53.png
|
|
Attachment 5: Screenshot_from_2022-05-12_11-05-40.png
|
|
Attachment 6: Screenshot_from_2022-05-12_11-05-18.png
|
|
Attachment 7: Screenshot_from_2022-05-12_11-05-09.png
|
|
Attachment 8: Screenshot_from_2022-05-12_11-04-46.png
|
|
Attachment 9: Screenshot_from_2022-05-12_11-04-22.png
|
|
Attachment 10: Screenshot_from_2022-05-12_11-03-49.png
|
|
Attachment 11: Screenshot_from_2022-05-12_11-03-37.png
|
|
Attachment 12: Screenshot_from_2022-05-12_11-03-28.png
|
|
Attachment 13: Screenshot_from_2022-05-12_11-03-13.png
|
|
Attachment 14: Screenshot_from_2022-05-12_11-02-58.png
|
|
Attachment 15: Screenshot_from_2022-05-12_11-15-56.png
|
|
423
|
Sat May 7 13:27:39 2022 |
TD | AIDA configuration |
Adaptor PCB link settings
n+n FEE64s
aida02, 4, 6 & 8 - LK1 fitted, HV Lemo-00 not connected - left/right wafer n+n side bias ring -> gnd
p+n FEE64s
top - aida09, 1, 10 & aida13, 5, 14 - LK2 & LK4 fitted - front/back FP -> gnd
bottom - aida11, 3, 12 & aida15, 7, 16 - LK2 & LK4 fitted - front/back FP -> gnd
top - aida01, 5 - LK3 fitted - middle wafer n+n side bias ring -> gnd
bottom - aida03, 7 - LK3 fitted - DSSSD PCB gnd -> gnd
AIDA PSU
top 1-2, 3-4, 9-10, 11-12
bottom 5-6, 7-8, 13-14, 15-16
ASIC settings 2021Apr29-13-16-00
slow comparator 0x64 -> 0xa
BNC PB-5 settings
amplitude 1.000V
attenuation x1
tail pulse
tau_d 1ms
polarity +
frequency 25Hz |
696
|
Fri Jan 31 13:48:29 2025 |
JB | AIDA analysis from HI-DESPEC meeting 20.11.2024 |
AIDA analysis and presentation by J. Bormans for AIDA made in the HISPEC-DESPEC collaboration meeting.
https://docs.google.com/presentation/d/1hlZ30r294UqbVKGy3jg-wompFpc7TSfD/edit?usp=sharing&ouid=102131181856760114019&rtpof=true&sd=true |
64
|
Thu Aug 15 14:09:39 2019 |
NH | AIDA Waveforms |
Noise seemed less strong today, unsure of cause. I had re-taped snout as tape was not sticking well.
Figures 1-4: Waves for all 4 FEEs connected to the DSSD
Figures 5-8: Zoomed in on region 400-600
Figures 9-10: Rates in DSSD
Note in particular fee09 has a clear noise pickup somewhere. Also appears when no DSSD voltage.
Peak distance = 6 channels = 16.6 MHz.
Fee09 is connected to HV bias core (-160 V)
However unplugging the HV cable from it shows no difference.
Must be related to something else.
Update 16:29 CEST:
Distance is more like 5 channels (20 MHz)
Fee09 picks it by far most strongly but all fees you can make it out
Additionally can see a slower waveform especially on other fees... approximately 40 channels = 2.5 MHz
Checked with multimeter that low resistance path between FEE cooling plate and ground LEMO connector
also low resistance between ribbon cable copper shield and ground LEMO connector.
Noise seems to appear even if pulser cable unplugged at pulser end or when attentuation is increased weaking pulse.
|
Attachment 1: aida09-wave-all.PNG
|
|
Attachment 2: aida10-wave-all.png
|
|
Attachment 3: aida11-wave-all.png
|
|
Attachment 4: aida12-wave-all.png
|
|
Attachment 5: aida09-wave-zoom.png
|
|
Attachment 6: aida10-wave-zoom.png
|
|
Attachment 7: aida11-wave-zoom.png
|
|
Attachment 8: aida12-wave-zoom.png
|
|
Attachment 9: RateHists.png
|
|
Attachment 10: Rates.png
|
|
28
|
Thu Mar 21 13:59:08 2019 |
NH | AIDA Water |
The AIDA water system has been repaired and not leaking.
The interlock did not light immediately, but power cable reconnected to box and now it works.
|
418
|
Mon May 2 13:08:49 2022 |
NH | AIDA Updates 2 May |
The snout endcap has been sealed with new copper tape over the red tape
Observe significant drop in leakage current on DSSD #2 down to 7 uA (about 0.5 uA above DSSD #1) as it looked when the black cloth was on
It is possible more sealing needs to be done when bPlas is biased as bPlas is more sensitive
-
the AIDA LAN network interface is only running at 100 MBit/s - this will be problematic during the run
When 2A is free will try to reconnect cable to see if it returens to 1 Gbit/s
-
Preliminary alpha background analysis (over weekend, 90 hours statistics)
Cause of sporadic PAUSE/RESUME is not clear as rate is nearly always 0 outside of aida02/aida04
======================================
AIDA Unpacker Analysis
--------------------------------------
First event: Thu Apr 28 19:50:20 2022
Last event : Mon May 2 14:04:03 2022
Duration : 324823 seconds
--------------------------------------
MBS Events (M): 912899 (2 Hz)
AIDA Words (W): 7472078760 (-3441 Hz)
ADC Words (A): 2742871865 (-4778 Hz)
-- Decays (D): 2728717223 (-4821 Hz)
-- Implants (I): 14154642 (43 Hz)
Info Words (F): 4729206895 (1 kHz)
-- SYNC48 (S): 2093328 (6 Hz)
-- SYNC63 (s): 2093328 (6 Hz)
-- PAUSE (P): 3823161 (11 Hz)
-- RESUME (R): 3823161 (11 Hz)
-- Discrim (D): 1390520565 (4 kHz)
-- Scaler (C): 3326853352 (3 kHz)
-- Unknown (U): 0 (0 Hz)
Timewarps (T): 20 (0 Hz)
Dead Time (X): 5024.43 s (1.54682%)
======================================
======================================
Individual FEE Overview
======================================
FEE | W A D I F S s P R D C U T X
1 | 9593 6985 6628 357 2608 2 2 0 0 2604 0 0 0 0
2 | 31134221 31115668 31115166 502 18553 8183 8183 0 0 2187 0 0 0 0
3 | 717765720 17634 17218 416 717748086 216426 216426 0 0 1653 717313581 0 0 0
4 | 3467468322 2684820687 2684820157 530 782647635 1293089 1293089 0 0 62747129 717314328 0 20 0
5 | 177575 108631 107352 1279 68944 21 21 20 20 68862 0 0 0 0.00102142
6 | 8371118 8361524 8358540 2984 9594 1350 1350 23 23 6848 0 0 0 10.6775
7 | 1396478942 4860615 57719 4802896 1391618327 346048 346048 1286994 1286994 446838393 941513850 0 0 3071.3
8 | 954933629 3978543 3975110 3433 950955086 118195 118195 5 5 7093 950711593 0 0 5.47318
9 | 9877 7923 7429 494 1954 4 4 0 0 1946 0 0 0 0
10 | 8076 6236 5917 319 1840 4 4 0 0 1832 0 0 0 0
11 | 26792 24399 24029 370 2393 3 3 0 0 2387 0 0 0 0
12 | 18271 16025 15382 643 2246 6 6 0 0 2234 0 0 0 0
13 | 1094646 51444 48305 3139 1043202 195 195 1 1 1042810 0 0 0 0.179207
14 | 7314376 152823 84786 68037 7161553 906 906 18158 18158 7123425 0 0 0 32.882
15 | 438092 22117 20290 1827 415975 56 56 251 251 415361 0 0 0 4.91581
16 | 886829510 9320611 53195 9267416 877508899 108840 108840 2517709 2517709 872255801 0 0 0 4970.9 |
Attachment 1: elog_temps1.png
|
|
Attachment 2: alpha_1d.png
|
|
419
|
Tue May 3 14:15:17 2022 |
NH | AIDA Updates 2 May |
PAUSE/RESUME stats are dominated by 2x FEE64s - aida07 and aida16
These FEE64s also have the highest rates of discriminator data?
> The snout endcap has been sealed with new copper tape over the red tape
>
> Observe significant drop in leakage current on DSSD #2 down to 7 uA (about 0.5 uA above DSSD #1) as it looked when the black cloth was on
> It is possible more sealing needs to be done when bPlas is biased as bPlas is more sensitive
>
>
>
> -
>
> the AIDA LAN network interface is only running at 100 MBit/s - this will be problematic during the run
> When 2A is free will try to reconnect cable to see if it returens to 1 Gbit/s
>
> -
>
> Preliminary alpha background analysis (over weekend, 90 hours statistics)
>
> Cause of sporadic PAUSE/RESUME is not clear as rate is nearly always 0 outside of aida02/aida04
>
> ======================================
> AIDA Unpacker Analysis
> --------------------------------------
> First event: Thu Apr 28 19:50:20 2022
> Last event : Mon May 2 14:04:03 2022
> Duration : 324823 seconds
> --------------------------------------
> MBS Events (M): 912899 (2 Hz)
> AIDA Words (W): 7472078760 (-3441 Hz)
> ADC Words (A): 2742871865 (-4778 Hz)
> -- Decays (D): 2728717223 (-4821 Hz)
> -- Implants (I): 14154642 (43 Hz)
> Info Words (F): 4729206895 (1 kHz)
> -- SYNC48 (S): 2093328 (6 Hz)
> -- SYNC63 (s): 2093328 (6 Hz)
> -- PAUSE (P): 3823161 (11 Hz)
> -- RESUME (R): 3823161 (11 Hz)
> -- Discrim (D): 1390520565 (4 kHz)
> -- Scaler (C): 3326853352 (3 kHz)
> -- Unknown (U): 0 (0 Hz)
> Timewarps (T): 20 (0 Hz)
> Dead Time (X): 5024.43 s (1.54682%)
> ======================================
> ======================================
> Individual FEE Overview
> ======================================
> FEE | W A D I F S s P R D C U T X
> 1 | 9593 6985 6628 357 2608 2 2 0 0 2604 0 0 0 0
> 2 | 31134221 31115668 31115166 502 18553 8183 8183 0 0 2187 0 0 0 0
> 3 | 717765720 17634 17218 416 717748086 216426 216426 0 0 1653 717313581 0 0 0
> 4 | 3467468322 2684820687 2684820157 530 782647635 1293089 1293089 0 0 62747129 717314328 0 20 0
> 5 | 177575 108631 107352 1279 68944 21 21 20 20 68862 0 0 0 0.00102142
> 6 | 8371118 8361524 8358540 2984 9594 1350 1350 23 23 6848 0 0 0 10.6775
> 7 | 1396478942 4860615 57719 4802896 1391618327 346048 346048 1286994 1286994 446838393 941513850 0 0 3071.3
> 8 | 954933629 3978543 3975110 3433 950955086 118195 118195 5 5 7093 950711593 0 0 5.47318
> 9 | 9877 7923 7429 494 1954 4 4 0 0 1946 0 0 0 0
> 10 | 8076 6236 5917 319 1840 4 4 0 0 1832 0 0 0 0
> 11 | 26792 24399 24029 370 2393 3 3 0 0 2387 0 0 0 0
> 12 | 18271 16025 15382 643 2246 6 6 0 0 2234 0 0 0 0
> 13 | 1094646 51444 48305 3139 1043202 195 195 1 1 1042810 0 0 0 0.179207
> 14 | 7314376 152823 84786 68037 7161553 906 906 18158 18158 7123425 0 0 0 32.882
> 15 | 438092 22117 20290 1827 415975 56 56 251 251 415361 0 0 0 4.91581
> 16 | 886829510 9320611 53195 9267416 877508899 108840 108840 2517709 2517709 872255801 0 0 0 4970.9 |
516
|
Fri Dec 16 14:02:12 2022 |
NH | AIDA System off for christmas break |
The AIDA NIM crate, pis and workstation have been powered off for the Christmas break and will not be accessible |
163
|
Mon Feb 1 15:19:07 2021 |
NH | AIDA Status Feb 2021 |
01.02.2021 - Four new sets of PSU, HDMI & Ethernet cables were ran from the DESPEC rack to the AIDA frame, in preparation for 4 new FEE64s.
A new 7 port USB hub has also been placed for the last few serial connections.
For the first experiment this year, we will run with a narrow AIDA configuration as in 2020. (12 FEEs)
The system has been powered up and biased successfully. To be monitored over the next few days.
A lot of the FEE serial monitors are missing, I think a hub has been disconnected from nnrpi1. This will be investigated on Wednesday.
The rack will also be grounded properly on Wednesday to investigate the impact on the noise.
A single new water line (feed and return) needs to be installed for the 16th FEE, this will be done once the hose is found/ordered...
The 4 new FEE64s will be mounted and powered up at some point to obtain the MAC addresses, and possibly check MIDAS merging 16 FEE64s.
Waveform data will be taken wednesday before & after grounding the rack to see noise situation currently |
164
|
Sat Feb 6 10:45:55 2021 |
NH | AIDA Status Feb 2021 |
> 01.02.2021 - Four new sets of PSU, HDMI & Ethernet cables were ran from the DESPEC rack to the AIDA frame, in preparation for 4 new FEE64s.
> A new 7 port USB hub has also been placed for the last few serial connections.
>
> For the first experiment this year, we will run with a narrow AIDA configuration as in 2020. (12 FEEs)
>
> The system has been powered up and biased successfully. To be monitored over the next few days.
>
> A lot of the FEE serial monitors are missing, I think a hub has been disconnected from nnrpi1. This will be investigated on Wednesday.
> The rack will also be grounded properly on Wednesday to investigate the impact on the noise.
>
> A single new water line (feed and return) needs to be installed for the 16th FEE, this will be done once the hose is found/ordered...
>
> The 4 new FEE64s will be mounted and powered up at some point to obtain the MAC addresses, and possibly check MIDAS merging 16 FEE64s.
>
> Waveform data will be taken wednesday before & after grounding the rack to see noise situation currently
05.02.2021 -
The serial hub was disconnected and was reconnected. Unfortunately nnrpi1 seems to have gone offline so cannot be used still. Will try to reboot pi when possible.
The hose has arrived and the water line will be prepared in my office mid next week.
All the leaf MACBs have been updated to the latest firmware (MACB_GSI_Simple.jed) and set to mode '0'. A fourth leaf MACB is now in the NIM crate but has no HDMI connections in or out yet.
All 12 FEEs powered up and have no WR issues (one MABC was first set to wrong mode, but was fixed)
A new tape server to support unmerged waveform readout has been loaded and documented by VP. This will largely be unused but the option is there and will be tested.
The rack was grounded to the platform floor with a large cable to potentially improve situation. Waveforms before (fig 1-2) and after (fig 3-4) attached.
There will be a DESPEC Dry Run next week Mon-Tue. |
Attachment 1: pregrd050222_E.png
|
|
Attachment 2: pregrd050221_O.png
|
|
Attachment 3: postgrd050221_O.png
|
|
Attachment 4: postgrd050221_E.png
|
|
31
|
Fri Mar 22 13:32:55 2019 |
NH | AIDA Startup @ 22.03.2019 |
FEEs have been on this morning, temperatures attached
Leakage current attached
the DSSD is attached to the following AIDA modules:
Beam Left: 10
Beam Right: 12
Bottom: 11
Top: 9
MIDAS Servers on, will be looking at resolution (pulser) |
Attachment 1: 20190323Bias.png
|
|
Attachment 2: 20190322FEETemps.png
|
|
632
|
Wed May 22 20:10:19 2024 |
NH, CC, HMA, MV, ZC, KZ | AIDA Snout Remounted |
AIDA and the Snout have been remounted in S4
I had a check of the AIDA connectors and all looked good, the kapton PCB connectors were sitting comfortably above the interstage and I saw no stressed/loose connectors.
Multimeter showed no continuity between snout or inter-stage and AIDA ground
We put a single layer of wide black tape inside the end-cap to improve the light seal and minimise reflections
After mounting the snout I managed to bias both DSSDs to 100 V with no issues. I had to raise the DSSD#1 (Ch0) limit to 40 uA because it rises quite high during ramp up (then settles).
It is very hot in S4 (28 C) and the roof is closed for high-radiation experiments, so I expect it to get hotter. DSSD leakage currents were similar to before (20 and 15 uA)
There is also the new Temp and Humidity monitor, which you can view on AnyDesk at 192.168.11.119 (I think), there is a firefox window open already |
Attachment 1: 20240522_153750.jpg
|
|
Attachment 2: 20240522_153752.jpg
|
|
Attachment 3: 20240522_153755.jpg
|
|
Attachment 4: 20240522_153757.jpg
|
|
Attachment 5: 20240522_153805.jpg
|
|
Attachment 6: 20240522_153807.jpg
|
|
Attachment 7: 20240522_153809.jpg
|
|
Attachment 8: 20240522_153810.jpg
|
|
Attachment 9: 20240522_153819.jpg
|
|
511
|
Tue Aug 30 13:48:32 2022 |
NH | AIDA Single Switch Configuration |
The second switch was moved back to CARME so AIDA has been configured back to using a single switch
aida02/aida04/aida06/aida08 updated back to first switch as per https://elog.ph.ed.ac.uk/DESPEC/433
Additionally a ribbon cable is attached to aida01 and aida05 to introduce some noise into the system |
27
|
Wed Mar 20 15:35:10 2019 |
NH | AIDA Setup @ GSI |
Currently
- 1 DSSD and Plastic is in the AIDA snout, which is not mounted
- The FEEs are offline due to a water supply issue, this will be repaired early 21/03/2019
- The pis & aida-3 are online
The water interlock also didn't clear, which will be investigated
Ideally installation can be completed tomorrow but this depends on water |
166
|
Mon Feb 22 18:18:47 2021 |
NH | AIDA Rates/Situation |
The ground cable (LEMO00) in aida07 was disconnected, it has been reinserted and the waveforms now look good.
(All data below taken with thresholds 0xA for all)
Noise in aida09 is visible and aida12 is quite high too. (All of DSSD3? Except aida10?)
Event rate in them is very high. The lower frequency noise visible in figs 5,7 seems slow enough for the ASICs
DSSD#2 has nice event rate and DSSD#1 seems "OK"
Leakage currents high but S4 very warm at the moment as roof is still closed.
Some PCBs from bPlas are touching the ribbon cables, so should be insulated better.
Next S4 access later this week will reseat all connectors to ensure good connection.
Other ideas can also be done
Figures: 1, 2 - Good Event + ADC Data Stats
Figure 3 - Rate Spectra (log scale)
Figure 4, 5 - Odd FEE64s Waveforms, 50 MS/s (Sample rate 0) and 5 MS/s (Sample rate 10)
Figure 6, 7 - Even FEE64s Waveforms, 50 MS/s (Sample rate 0) and 5 MS/s (Sample rate 10)
Figure 8 - Grafana (DSSD HV)
aida01-aida04 DSSD 1
aida05-aida08 DSSD 2
aida09-aida12 DSSD 3 |
Attachment 1: GoodRates.png
|
|
Attachment 2: ADCRates.png
|
|
Attachment 3: Rates.png
|
|
Attachment 4: Waves_0.png
|
|
Attachment 5: Waves_10.png
|
|
Attachment 6: EvenWaves_0.png
|
|
Attachment 7: EvenWaves_10.png
|
|
Attachment 8: Grafana.png
|
|