AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 9 of 34  ELOG logo
Entry  Fri Mar 22 08:31:39 2024, TD, Friday 22 March 39x

09.30 Systems check
Entry  Fri Mar 22 08:29:55 2024, TD, Anydesk restarted remotely 
Anydesk restarted remotely per https://elog.ph.ed.ac.uk/CARME/489

Anydesk address now restored to 832827869
Entry  Thu Mar 21 15:41:49 2024, NH, AM, MP, CC, Thu Mar 21 6x
Fig 1-3: Noise situation at real thresholds (0xa p+n, 0xf n+n)

Fig 4-6: After AM and MP turn off Mesytec Preamps
    Reply  Fri Mar 22 08:22:43 2024, NH, AM, MP, CC, Thu Mar 21 
> Fig 1-3: Noise situation at real thresholds (0xa p+n, 0xf n+n)

> Fig 4-6: After AM and MP turn off Mesytec Preamps
Entry  Fri Mar 22 07:34:54 2024, NH, JB, Au Beam 
 
Entry  Wed Mar 20 17:02:53 2024, NH, /dev/sdd 
The following messages are in the system log very often:

Mar 20 18:00:56 aidas-gsi smartd[1076]: Device: /dev/sdd [SAT], 2224 Currently unreadable (pending) sectors
Entry  Wed Mar 20 12:22:27 2024, NH, Wed Mar 20 9x
Turn on AIDA for Dry Run demonstrations and so on

All system wide checks, temp, bias OK

Noise situation is dreadful (but has not been optimised). Deterioriation since first mounted, suspect cabling issues with bPlast and BB7.
Entry  Tue Mar 19 10:17:30 2024, NH, Dry Run 2024 - 19th March 24 Screenshot_from_2024-03-19_13-44-34.pngScreenshot_from_2024-03-19_13-44-22.pngScreenshot_from_2024-03-19_13-44-04.pngScreenshot_from_2024-03-19_13-43-44.pngScreenshot_from_2024-03-19_13-43-24.png
AIDA has 8 FEEs and 1 DSSSD 

Aida08 (HDMI#12) had no WR again, I moved it to a different MACB and now it gets WR
Entry  Mon Mar 18 18:04:43 2024, NH, Preparation for pre-s100 dry run (and test beam???) 
In preparation for the dry run the following *temporary* changes to the FEE numbering have been prepared
These should be reverted after the dry run to ensure cable->fee agreement again
Entry  Fri Mar 15 16:29:57 2024, NH, Leakage currents 
The behaviour of the DSSSD leakage current at low voltages and during biases is unusual and varies depending on how the adapter boards are connected
To summarise the behaviour I have observed
Entry  Thu Mar 14 13:00:23 2024, JB, NH, MA, AM, GA, Mounting and biasing DSSD 2 
new Downstream DSSD2: 3208-2/3208-5/3208-8

Covered with black cloth.
Entry  Thu Mar 14 12:13:17 2024, JB, NH, MA, Mounting and biasing DSSD 1 
Upstream bPlast mounted

new Upstream DSSD: 3208-2/3208-5/3208-8
Entry  Wed Mar 13 13:02:19 2024, JB, NH, HA, MA, DSSD 1 biasing tests 20240313_142551.jpg
Dismounted Snout and biased DSSSD1 channels

leftmost waifer working

middle waifer reaches 90V then current ramps up
Entry  Tue Mar 12 16:16:49 2024, NH, TD, JB, HA, Summary of DSSSD Biasing 12.03 
DSSD#1 undergoes a breakdown at 90V, two of the three wafers show this
- The adapter PCBs themselves have no breakdown at 100V, indicating the   issue is internal to the snout
Entry  Mon Mar 11 15:19:44 2024, JB, NH, Priyanka, Michael Armstrong, Helena Albers, To Do: AIDA PCB tests 
To do:

1) Disconnect ribbon cables from p+n junction FEE64 adaptor PCBs of upstream DSSSD, apply c. 100V bias and check leakage current is zero
i.e. eliminate shorts in PCBs
Entry  Sun Mar 10 17:08:12 2024, NH, AIDA FEE Layout + Cabling Plan for S100 AIDA_S100_WiringPlan.drawio.pngAIDA_S100_WiringPlan.drawioAIDA_S100_WiringPlan(1).drawioAIDA_S100_WiringPlan.drawio.png
Proposed FEE numbering and wiring plan for upcoming experiment S100 (2x Wide DSSSDs)

Image designed in draw.io, source attached 
Entry  Fri Mar 8 16:05:57 2024, JB, CC, TD, NH, Friday 8 March IV_test_AIDA.xlsxchart.pngDownstream_positive_bias_vs._Current_(uA).png
Bias tests of AIDA on individual wafers and in parallel. Spreadsheet can be found in attachment 1, and graphic results can be seen in Attachment 2. Summary:
Upstream detector cannot be biased in parallel nor individually. Downstream detector can be biased with positively and each wafer can individually be biased
negatively. In parallel, it was not possible to bias the downstream detector negatively as indicated by the tests below.
Entry  Thu Mar 7 15:15:29 2024, JB, NH, CC, AIDA HV Bias Test IV Curve 

AIDA I-V Test


Voltage (V)
Current
(uA)


10
1.43


20
2.065


30
2.415


40
2.64


50
2.825


60
2.99


70
3.185


80
3.58


90
5.01


100
9.4




-
Voltage-Current test of newly installed AIDA snout. Breakdown observed at around ~92 V. Probably caused my light leakage into the snout, will investigate
Entry  Thu Mar 7 11:09:05 2024, HA, JB, CC, TD, MG, Thursday 7 March 

Snout assembly
Entry  Tue Mar 5 09:10:01 2024, MA, JB, TD, Tuesday 5 March 20240305_101140.jpg20240305_101146.jpg20240305_165949.jpg

Old ribbon cable assemblies - attachments 1  2
Entry  Mon Mar 4 11:35:30 2024, TD, Monday 4 March 11x
12.30 FEE64 41:d7:cd ASIC mezzanine u/s, no data, ASIC temperature c. 20 deg C ( ambient ) low
      Replaced ASIC mezzanine with new ASIC mezzanine
      Installed as aida08
ELOG V3.1.4-unknown