AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  EDI_PSA, Page 1 of 2  ELOG logo
ID Date Authordown Subject Text Attachments
  22   Mon Jun 5 15:48:47 2023 Lucia B,David RWork on DAQ for 23Na target testWe started the acquisition via CoMPASS
with one CeBr (90)  and the HPGe. The
germanium was already cooled at 80K with
 GeBo_baseline-5-6-23.jpg 
  23   Tue Jun 6 11:15:31 2023 Lucia B,David RWork on DAQ for 23Na target testAttached a picture of the germanium baseline
in the morning 6/6/23.

-----------------------
 GeBo_baseline-06-06-23.jpg 
  30   Fri Jun 16 10:42:38 2023 Lucia B, Federico FPowercut during long run on LNL9 - end of shiftOn 15/06/2023 morning, around 6:32 am,
a powercut caused failure in the Compresed
Air Pressure system. Faraday cup was closed
 LNL9_front.jpgLNL9_back.jpg 
  24   Thu Jun 8 10:36:26 2023 Lucia B, Carlo BStart of the measurementsWe have started the pumping system and
reached ~10^-6 mbar vacuum. We have then
filled the cold trap reaching ~10^-7 mbar.
 23NaTarget_tests.xlsx 
  25   Fri Jun 9 13:47:24 2023 Lucia B, Carlo BLNL1We performed the scan on the LNL1 23Na
target (details in the excel sheets in previous
entry) for the E_p=309 keV resonance. The
 1686234338228.jpg1686314774177.jpg1686314774200.jpg1686315494678.jpg 
  26   Sun Jun 11 09:18:23 2023 Lucia B, Carlo BLNL4When opening LNL4 target jar, the
valve did not sound as if air was entering
it: we suspect the target was actually not
 lnl4_before1.jpglnl4_before2.jpgLnl4_before3.jpg 
  27   Tue Jun 13 12:44:05 2023 Lucia B, Carlo BLNL4 dismounted - LNL6 mountedOn 12/06/2023 we dismounted LNL4 after
approximately 12 C were deposited.

We then mounted LNL6 (sputtered,
 LNL4_after.jpgLNL6_before.jpg 
  28   Wed Jun 14 11:30:42 2023 Lucia B, Carlo BLNL6-LNL2-LNL9On 13/06/2023 afternoon we dismounted LNL6
sputtered target and mounted LNL2 (identical
to LNL1, one Cr layer). We performed a scan
 7x 
  29   Thu Jun 15 10:13:56 2023 Lucia B23Na target locationUsed and new 23Na targets are in a
box in LAB7, next to the other targets
  
  3   Mon Jun 10 06:17:51 2019 CB, RG, AK3-6 June - first DAQ testsTested performance of DAQ with following equipment

Hamamatsu photodiode (S3590-09)
  
  12   Sun May 23 14:02:58 2021 CB, PB, LdF2021 Runs - grade B MSL SiR1: 
Same as previous configuration? 
Negative signals.
  
  11   Tue Feb 11 14:49:29 2020 CB, PB, IMK2020 runsRuns acquired in Jan-Feb 2020

Detector bias -50V
  
  19   Tue Jun 15 09:52:10 2021 CB, PB2021 Runs - Hamamatsu diodeUsing a 1x1 Hamamatsu photodiode (uncoated)
+75V bias supplied via RAL108 and standard
photodiode mount. Imon ~0 
  
  2   Mon Jun 10 06:09:59 2019 CB, OHSorting programSort program written by Oscar, adapted from
the RIKEN AIDA sort.
EDIT 26 Jun 2019 by CB - C++11 dependencies
 dataReader.tar.gz 
  1   Mon Jun 10 03:26:41 2019 CBDAQ setup, start & stop instructions(Updated to 10/01/2020)

If recovering from a crash, turn off the
 7x 
  4   Tue Jun 25 11:51:00 2019 CBTest run 4P9 3-alpha source
Hamamatsu Photodiode - bias = 15V
Cooknell preamplifier
  
  5   Wed Jun 26 14:15:43 2019 CBWaves to histogram programWrote simple program to convert from waves
to amplitude/energy histogram.
Program uses semi-gaussian filtering with
 WavesToHisto.cpp 
  6   Wed Jun 26 14:19:36 2019 CBAnalysis of R2Analysed first ~500 MB of R2_0 using sorting
program
 260619_R2Histo.png 
  7   Wed Jun 26 17:04:07 2019 CBNew settings for internal CFDTried using settings attached to enable internal
CFD.
Restored / DAQ Go. No waveforms.
 1725_PosSig_Working.txt 
  8   Fri Jun 28 18:01:09 2019 CBLong run to test DAQ stabilityLeft DAQ running with pulser signal to attempt
to reproduce error leading loss of communication
with VME crate.
  
ELOG V3.1.4-unknown