Fri Sep 8 19:03:23 2017, TD, w26 network configuration 12x
|
Network configuration files for workstation w26 (Sun Ultra 45)
|
Sat Nov 11 05:49:00 2017, AM & MD, run 88
|
Header: 3.99 MeV/u and CH2_30+25.
Ender:
====================================================
|
Fri Nov 10 01:29:51 2017, ASM, MD, DK, run 75
|
Header: 4.7 MeV/u and C_09. PS back, but need to check how much beam actually there was before next issue
Ender: no beam at our sample; IHS cavity (part of normal conducting linac) tripped
====================================================
|
Sun Nov 12 18:32:52 2017, MB DK , run 112
|
Header: 4.4 MeV/u CH2_16 sample
Ender:
====================================================
|
Sun Nov 12 17:44:49 2017, MB DK RG, run 111
|
Header: empty target, 4.4 MeV/u
Ender: End
====================================================
|
Thu Nov 9 23:10:38 2017, MD, preparation for Carbon C_09 (Run 75)
|
10/11/17: 00:03
switch target ladder to Pos #5: 82.44 mm
|
Sat Nov 11 17:36:54 2017, ASM, more halflife stuff
|
Fitting those half life data more reasonably... fitted the decay curve with y=a*exp(-b*t)+c to all the data points, comes up with t1/2=(85.8+/-2.6)s |
Thu Sep 28 03:38:18 2017, dk, heavy ion degrader foil - updated 8x
|
--original email text--
Using Claudia's code, I added a layer of Al foil before the heavy ion
silicon detector. The attached plots correspond to the heavy ion
|
Thu Oct 19 14:41:19 2017, daid, heavy ion degrader foil - full / new 8x
|
See entry https://elog.ph.ed.ac.uk/ISOLDE/28 for a full description, but editing the same elog is altering attachment numbers etc.
Here I've added 20 um foil as well as 5.3 MeV/u (~313 MeV) 59Cu beam.
|
Thu Sep 28 03:34:20 2017, dk, heavy ion degrader foil
|
--text from email--
Using Claudia's code, I added a layer of Al foil before the heavy ion
|
Sat Nov 11 17:19:54 2017, ASM, CL, TD..., halflife
|
Placed a hand held rad monitor near the faraday cup and took rate readings every 20 seconds, right after inserting the gate valve in front of SEC:
seconds counts/s
0 590 |
Mon Nov 6 10:50:33 2017, Peter Black, foil mount drawings 
|
|
Thu Sep 14 09:47:02 2017, dk, discussion with beam operators
|
CERN side
Faraday cup at the end of SEC, ideally with automated control to insert and remove
|
Mon Nov 6 16:12:47 2017, Peter Black, chamber drawings 
|
work in progress. |
Mon Nov 6 10:52:58 2017, Peter Black, alignment hardware drawings   
|
|
Thu Sep 14 14:07:21 2017, pb, alignment
|
Chat with survey team
1. mauf plugs for both ends of chamber with concentric 8mmH7 holes, with nylon tipped grub screws/clamp bars
2. Manuf of target with 8mmH7 hole |
Thu Aug 23 18:23:27 2018, DK, Where to find (our) stuff at ISOLDE
|
=Overview=
Shoes, hard hats, 'underpants', spiders, etc: Cardboard box "R", Garage entry of ISOLDE, shelf opposite turnstyle.
|
Thu Aug 23 18:57:15 2018, DK, What daid is taking from ISOLDE to Edinburgh
|
1 bolt for chamber stand structure, for reference for new struts.
2 target ladders: spare 1/2 style ladder, ladder from inside chamber, including the bits to connect to actuator
|
Sun Feb 19 12:22:16 2017, td, md, Vacuum and detector test
|
------17.2.17 ------------------------------------------------------
closing chamber
|
Sat Sep 9 09:39:38 2017, Claudia, Vacuum Readings at ISOLDE Hall
|
Thursday, 7th September:
Vaccum after pumping all night preamps off, chiller off
09:37: IMG1 2.3E-5 mbar, Chamber 7.5 E-5 mbar; Julabo off;
09:38: IMG1 2.1E-5 mbar; Chamber 6.6E-5 mbar; Julabo 20 Celsius
09:41: |