ID |
Date |
Author |
Subject |
70
|
Thu Nov 9 15:55:56 2017 |
SL | Run 65 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (E - corrected, not HI, now ~50% live time)
Ender:
====================================================
Run number : 65
Date : 9 / 11
Start time : 16:56
Stop time : 17:27
Trigger rate (MIDAS) :
Blocks written : 179
——————————————————————————————
Run Scalars
0- Ungated : 10
1- Gated : 10
2- dE : 50
3- E : 10
4- HI : 666
5- Pulser : 2
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.5 to 2.0 pnA
Target : #6 CH2_30+25
Ladder position : 67.26 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.5 V
del_E leakage (uA) : 0.08 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.835 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.1 x 10^-6 mbar
Pressure (old gauge) : 2.1 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.0 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments:
in sum spectra S4000: Counts above 100 MeV: 12
==================================================== |
71
|
Thu Nov 9 16:30:15 2017 |
SL | Run 66 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (p+n E OR p+n HI (with 2^8 prescaler))
Ender:
====================================================
Run number : 66
Date : 9 / 11
Start time : 18:09
Stop time : 18:30
Trigger rate (MIDAS) :
Blocks written : 84
——————————————————————————————
Run Scalars
0- Ungated : 14
1- Gated : 12
2- dE : 51
3- E : 11
4- HI : 672
5- Pulser : 2
6- 1kHz Clock : 967
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.5 to 2.0 pnA
Target : #6 CH2_30+25
Ladder position : 67.26 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.5 V
del_E leakage (uA) : 0.08 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.835 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.0 x 10^-6 mbar
Pressure (old gauge) : 2.0 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.2 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments: Beam stopped short because the beam went off from PBS towards the end.
==================================================== |
74
|
Thu Nov 9 18:56:13 2017 |
SL | Run 72 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run number : 72
Date : 09/11
Start time : 20:14
Stop time : 21:41
Trigger rate (MIDAS) :
Blocks written : 570
——————————————————————————————
Run Scalars (approx rates)
0- Ungated : 12
1- Gated : 10
2- dE : 59
3- E : 8
4- HI : 672
5- Pulser : 2
6- Clock : 967
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.7pA
Target : #6 CH2_33+35
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : 32
del_E leakage (uA) : 0.75
E voltage (V) : 350
E leakage (uA) : 1.73
E_hi voltage (V) : 14
E_hi leakage (uA) : 0.85
——————————————————————————————
PA power (upstream, positive) : 1.55A
PA power (upstream, negative) : 0.55A
PA power (downstream, positive) : 0.8A
PA power (downstream, negative) : 0.28A
——————————————————————————————
Pressure (IMG1) : 7.0E-06
Pressure (old gauge) : 2.0E-05
Pressure (SEC) : 3.9E-06
——————————————————————————————
Temp (Chiller) : -10
Temp (chamber) : 5.4
——————————————————————————————
Comments:
TDCs now in common stop mode, previously in normal mode. Now working correctly.
==================================================== |
75
|
Thu Nov 9 19:06:08 2017 |
SL | Run 68-71 |
JUNK |
76
|
Thu Nov 9 20:46:29 2017 |
SL | Run 73 |
Header: 4.7 MeV/u and CH2_30+25.
Ender: NO BEAM FROM PSB - called CCC and stopped run.
====================================================
Run number : 73
Date : 09/11
Start time : 21:44
Stop time : 22:25
Trigger rate (MIDAS) :
Blocks written : 263
——————————————————————————————
Run Scalars (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.7pA
Target : #6 CH2_33+35
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : 32
del_E leakage (uA) : 0.75
E voltage (V) : 350
E leakage (uA) : 1.73
E_hi voltage (V) : 14
E_hi leakage (uA) : 0.85
——————————————————————————————
PA power (upstream, positive) : 1.55A
PA power (upstream, negative) : 0.55A
PA power (downstream, positive) : 0.8A
PA power (downstream, negative) : 0.28A
——————————————————————————————
Pressure (IMG1) : 7.0E-06
Pressure (old gauge) : 2.0E-05
Pressure (SEC) : 3.9E-06
——————————————————————————————
Temp (Chiller) : -10
Temp (chamber) : 5.4
——————————————————————————————
Comments:
TDCs now in common stop mode, previously in normal mode. Now working correctly.
==================================================== |
Attachment 1: Screen_Shot_2017-11-09_at_22.38.49.png
|
|
77
|
Thu Nov 9 21:31:16 2017 |
SL | Run 74 |
Header: 4.7 MeV/u and CH2_30+25.
Ender: STOP due to PSB fire.
====================================================
Run number : 74
Date : 09/11
Start time : 22:33
Stop time : 23:42
Trigger rate (MIDAS) :
Blocks written : 422
——————————————————————————————
Run Scalars (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.5pA
Target : #6 CH2_33+35
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : 32
del_E leakage (uA) : 0.75
E voltage (V) : 350
E leakage (uA) : 1.73
E_hi voltage (V) : 14
E_hi leakage (uA) : 0.85
——————————————————————————————
PA power (upstream, positive) : 1.55A
PA power (upstream, negative) : 0.55A
PA power (downstream, positive) : 0.8A
PA power (downstream, negative) : 0.28A
——————————————————————————————
Pressure (IMG1) : 7.0E-06
Pressure (old gauge) : 2.0E-05
Pressure (SEC) : 3.9E-06
——————————————————————————————
Temp (Chiller) : -10
Temp (chamber) : 5.4
——————————————————————————————
Comments:
ISOLDE: (PSB is 1 ring down - CCC operator to return 1st ring when fixed)
Fluctuations in intensity throughout run, as operator attempts to restart.
Final decision made to run with 3 rings and more runs per supercycle at 23:10.
==================================================== |
Attachment 1: Screen_Shot_2017-11-09_at_22.35.20.png
|
|
Attachment 2: Screen_Shot_2017-11-09_at_22.38.49.png
|
|
Attachment 3: Screen_Shot_2017-11-10_at_13.54.40.png
|
|
85
|
Fri Nov 10 10:46:54 2017 |
SL | Investigation of E detector thickness |
While changing HI degrader foil to 10um Al, the E detector was investigated, due to previously observed alpha punch-through.
On visual inspection, the E detector appeared to be 1mm in thickness, leading us to believe that instead we were not fully depleting the detector.
The bias supply was investigated, and was found to be supplying a lower voltage (on all channels) than was shown on the display (14V -> 2V in reality, 350V -> 60V in reality).
The bias module was replaced, and the faulty module marked as such.
As a result of this change, the configuration of the detector bias channels has been altered (as ch 2 on new module can't supply >100V).
-------------
New Configuration:
Detector : Voltage : Leakage Current
Ch 1 - dE : 40 V : 0.92 uA
Ch 2 - HI : 14 V : 2.52 uA
Ch 3 - E : 350 V : 3.91 uA |
88
|
Fri Nov 10 19:01:13 2017 |
SL | Run 81 |
Header: 3.99 MeV/u and CH2_30+25.
Ender: Stopped to check E hardware.
====================================================
Run number : 81
Date : 10/11
Start time : 20:20
Stop time : 20:50
Trigger rate (MIDAS) :
Blocks written : 70
——————————————————————————————
Run Scalars (approx rates)
0- Ungated : 0
1- Gated : 0
2- dE : 12k
3- E : 92
4- HI : 50
5- Pulser : 2
6- Clock : 970
——————————————————————————————
Beam energy : 3.99 MeV/u
Beam intensity : 1.8 pA
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position : 67.26
HI Degrader foil (um) : 10 um Al
——————————————————————————————
del_E voltage (V) : -40
del_E leakage (uA) : 0.6
E voltage (V) : -350
E leakage (uA) : 2.17
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.325
——————————————————————————————
PA power (upstream, positive) : 1.55 mA
PA power (upstream, negative) : -0.55 mA
PA power (downstream, positive) : 0.8 mA
PA power (downstream, negative) : -0.28 mA
——————————————————————————————
Pressure (IMG1) : 1.0E-05 mbar
Pressure (old gauge) : 3.8E-05 mbar
Pressure (SEC) : 5.4E-06 mbar
——————————————————————————————
Temp (Chiller) : -9.9 degrees C
Temp (chamber) : 5.5 degrees C
——————————————————————————————
Comments:
==================================================== |
89
|
Fri Nov 10 19:57:49 2017 |
SL | Run 82 |
Header: 3.99 MeV/u and CH2_30+25.
Ender:
====================================================
Run number : 82
Date : 10/11
Start time : 21:03
Stop time : 21:30
Trigger rate (MIDAS) :
Blocks written :
——————————————————————————————
Run Scalars (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
——————————————————————————————
Beam energy : 3.99 MeV/u
Beam intensity : 1.98 pA
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position : 67.26
HI Degrader foil (um) : 10 um Al
——————————————————————————————
del_E voltage (V) : -40
del_E leakage (uA) : 0.6
E voltage (V) : -210
E leakage (uA) : 2.02
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.325
——————————————————————————————
PA power (upstream, positive) : 1.55 mA
PA power (upstream, negative) : -0.55 mA
PA power (downstream, positive) : 0.8 mA
PA power (downstream, negative) : -0.28 mA
——————————————————————————————
Pressure (IMG1) : 1.0E-05 mbar
Pressure (old gauge) : 3.8E-05 mbar
Pressure (SEC) : 5.4E-06 mbar
——————————————————————————————
Temp (Chiller) : -9.9 degrees C
Temp (chamber) : 5.5 degrees C
——————————————————————————————
Comments:
==================================================== |
90
|
Fri Nov 10 20:30:57 2017 |
SL | Run 83 |
Header: 3.99 MeV/u and CH2_30+25.
Ender: Recompiling sort code.
====================================================
Run number : 83
Date : 10/11
Start time : 21:30
Stop time : 22:59
Trigger rate (MIDAS) :
Blocks written : 150
——————————————————————————————
Run Scalars (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
——————————————————————————————
Beam energy : 3.99 MeV/u
Beam intensity : 1.7 - 2.0 pA
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position : 67.26
HI Degrader foil (um) : 10 um Al
——————————————————————————————
del_E voltage (V) : -40
del_E leakage (uA) : 0.6
E voltage (V) : -210
E leakage (uA) : 2.02
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.325
——————————————————————————————
PA power (upstream, positive) : 1.55 mA
PA power (upstream, negative) : -0.55 mA
PA power (downstream, positive) : 0.8 mA
PA power (downstream, negative) : -0.28 mA
——————————————————————————————
Pressure (IMG1) : 1.0E-05 mbar
Pressure (old gauge) : 3.8E-05 mbar
Pressure (SEC) : 5.4E-06 mbar
——————————————————————————————
Temp (Chiller) : -9.9 degrees C
Temp (chamber) : 5.5 degrees C
——————————————————————————————
Comments:
==================================================== |
157
|
Tue Nov 14 14:30:51 2017 |
SL | Photos inside chamber (detectors, IRIS, etc) |
|
Attachment 1: OneDrive-2017-11-14_2.zip
|
48
|
Wed Nov 8 21:21:31 2017 |
Ruchi Garg, Daid | RunLogTemplate |
Header:
Ender:
====================================================
Run number :
Date :
Start time :
Stop time :
Trigger rate (MIDAS) :
Blocks written :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) :
Beam intensity (epA) :
Target :
Ladder position (mm) :
HI Degrader foil (um) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) :
del_E leakage (uA) :
E voltage (V) :
E leakage (uA) :
E_hi voltage (V) :
E_hi leakage (uA) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) :
PA power (Up, negative) (A) :
PA power (Down, positive) (A) :
PA power (Down, negative) (A) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) :
Pressure (old gauge) (mbar) :
Pressure (SEC) (mbar) :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg :
Temp (chamber) deg :
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
44
|
Tue Nov 7 14:38:25 2017 |
Ruchi Garg | Target ladder configuration |
|
Attachment 1: TargetLadder.pdf
|
|
38
|
Sun Nov 5 20:25:10 2017 |
Ruchi | Circuit diagram and cable mapping |
|
Attachment 1: Cabling.pdf
|
|
Attachment 2: PreampsPCBs.pdf
|
|
Attachment 3: Circuit.pdf
|
|
51
|
Wed Nov 8 22:21:35 2017 |
Ruchi | Beam transmission |
By the end of beam tuning (around 6pm), beam transmission between Faraday cups at the end of SEC and at end of Edinburgh chamber:
~100% through 10mm collimator (empty target frame)
> 50% thought 3mm collimator
|
179
|
Thu Nov 16 15:37:35 2017 |
RG, MD, CLW | Run 167 JUNK |
|
106
|
Sat Nov 11 17:08:50 2017 |
RG, DK, CL, TD, AM, MD | Run 96 |
Header: Continue with 4.0 MeV/u Empty Frame
Ender:
====================================================
Run number : 96
Date : 11 / 11 / 2017
Start time : 18:09:43
Stop time : 18:40
Trigger rate (MIDAS) :
Blocks written : 0 blocks written, it says.
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 0 (actually ~0.1 Hz)
1- Gated : 0 (actually ~0.1 Hz)
2- dE : 150k
3- E : 30
4- HI : 37
5- Pulser : 2
6- Clock : 968
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : Nominal 4.0 MeV/u
Beam intensity (epA) :
Target : Empty Frame
Ladder position (mm) : 52.09
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.67
E voltage (V) : -350
E leakage (uA) : 2.10
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.57
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.55
PA power (Down, positive) (A) : 0.79
PA power (Down, negative) (A) : 0.25
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.9 x 10^-6
Pressure (old gauge) (mbar) : 2.0 x 10^-5
Pressure (SEC) (mbar) : 3.9 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.0
Temp (chamber) deg : 5.9 ~ 6.0
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Increased pulser rate to 250 Hz after the run, to flush the previous buffer in the Tape Server.
See run 97
==================================================== |
142
|
Mon Nov 13 17:23:16 2017 |
RG SL | Run 128 |
Header: CH2 #33_10_01, beam energy 3.5 MeV/u
Ender: Stop for laser optimisation
====================================================
Run number : 128
Date : 13/11/2-17
Start time : 18:24:39
Stop time : 19:57:51
Trigger rate (MIDAS) : 6
Blocks written : 412
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 142346
3- E : 29
4- HI : 668
5- Pulser : 1
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 3.6
Beam intensity (epA) : 1.3
Target : CH2 #33_10_01
Ladder position (mm) : 97.61
HI Degrader foil (um) : 10 Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.79
E voltage (V) : -350
E leakage (uA) : 2.06
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.85
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.6
PA power (Down, positive) (A) : 0.8
PA power (Down, negative) (A) : 0.3
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.3E-06
Pressure (old gauge) (mbar) : 1.7E-05
Pressure (SEC) (mbar) : 4.0E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : 5.3
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
130
|
Mon Nov 13 00:12:24 2017 |
RG MD DK | Run 116 |
Header: CH2 #16, beam energy 4.4 MeV/u
Ender: Run stopped short - IHS tripped
====================================================
Run number : 116
Date : 13/11/2017
Start time : 01:12
Stop time : o1:41:50
Trigger rate (MIDAS) : 4
Blocks written : 117
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 155999
3- E : 15
4- HI : 351
5- Pulser : 2
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.4
Beam intensity (epA) : 1.45
Target : CH2_16
Ladder position (mm) : 127.95
HI Degrader foil (um) : 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.77
E voltage (V) : -350
E leakage (uA) : 2.09
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 0.8
PA power (Up, negative) (A) : 0.3
PA power (Down, positive) (A) : 1.55
PA power (Down, negative) (A) : 0.6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.4E-06
Pressure (old gauge) (mbar) : 1.8E-05
Pressure (SEC) (mbar) : 3.8E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10
Temp (chamber) deg : 5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |
132
|
Mon Nov 13 02:59:37 2017 |
RG MD | Run 118 - short |
Header: CH2 #16, beam energy 4.4
Ender: IHS tripped (third time tonight)
====================================================
Run number : 118
Date : 13/11/2017
Start time : 04:00:25
Stop time : 04:36:39
Trigger rate (MIDAS) : 3
Blocks written : 152
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalers (approx rates)
0- Ungated : 4
1- Gated : 4
2- dE : 125k
3- E : 33
4- HI : 375
5- Pulser : 1
6- Clock : 969
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u) : 4.4
Beam intensity (epA) : 1.3
Target : CH2 #16
Ladder position (mm) : 127.95
HI Degrader foil (um) : 10 Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -40
del_E leakage (uA) : 0.77
E voltage (V) : -350
E leakage (uA) : 2.08
E_hi voltage (V) : -14
E_hi leakage (uA) : 2.80
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive) (A) : 1.55
PA power (Up, negative) (A) : 0.59
PA power (Down, positive) (A) : 0.79
PA power (Down, negative) (A) : 0.28
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) (mbar) : 6.4E-06
Pressure (old gauge) (mbar) : 1.7E-05
Pressure (SEC) (mbar) : 3.9E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) deg : -10.1
Temp (chamber) deg : 5.8
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
==================================================== |