Fri Nov 10 10:46:54 2017 |
SL | Investigation of E detector thickness | While changing HI degrader foil to 10um Al, the E detector was investigated, due to previously observed alpha punch-through.
On visual inspection, the E detector appeared to be 1mm in thickness, leading us to believe that instead we were not fully depleting the detector.
The bias supply was investigated, and was found to be supplying a lower voltage (on all channels) than was shown on the display (14V -> 2V in reality, 350V -> 60V in reality).
The bias module was replaced, and the faulty module marked as such.
As a result of this change, the configuration of the detector bias channels has been altered (as ch 2 on new module can't supply >100V).
-------------
New Configuration:
Detector : Voltage : Leakage Current
Ch 1 - dE : 40 V : 0.92 uA
Ch 2 - HI : 14 V : 2.52 uA
Ch 3 - E : 350 V : 3.91 uA |
84
|
Fri Nov 10 08:31:06 2017 |
TD | CAEN V767 TDC trigger/channel 0 logic change | Approximately 5-10% of events overnight were 'bad' i.e. missing TDC data
Checked the CAEN V767 trigger/channel 0 logic (without beam) this morning
and observed that the delayed event trigger was within 20-30ns of trailing
edge of MON2 (trigger accepted). Increased width of MON2 from 100ns to 150ns.
Check whether this change reduces or eliminates 'bad' events when beam
returns. |
83
|
Fri Nov 10 07:00:14 2017 |
MD, CLW, ASM, TD | Run 80 |
Header: 4.7 MeV/u and CH2_30+25.
Ender: beam stop at PS (6 hour interruption)
====================================================
Run number : 80
Date : 10/11
Start time : 08:00:49
Stop time : 08:35:05
Trigger rate (MIDAS) : 8
Blocks written : 202
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 9
1- Gated : 8
2- dE : 42
3- E : 8
4- HI : 482
5- Pulser : 2
6- Clock : 967
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 4.7 MeV/u
Beam intensity : not checked this run (should be around 1.5pA)
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32
del_E leakage (uA) : 0.8
E voltage (V) : -350
E leakage (uA) : 1.745
E_hi voltage (V) : -13.5 to -14
E_hi leakage (uA) : 0.905
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : -0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : -0.28 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 6.75E-06
Pressure (old gauge) : 1.9E-05
Pressure (SEC) : 3.9E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -10.0
Temp (chamber) : 5.5
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
- since 6:20 RF problem on ring2 (although 3 full inj are shown) : ~1.6E+14 protons only
- 8.21 comment on PS: 6 hours of no beam
- 08:35 stop run, because no beam
==================================================== |
82
|
Fri Nov 10 04:53:34 2017 |
MD, ASM | Run 79 | Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run number : 79
Date : 10/11
Start time : 05:52:13
Stop time : 08:00:08
Trigger rate (MIDAS) : 8
Blocks written : 789
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 11
1- Gated : 10
2- dE : 49
3- E : 8
4- HI : 536
5- Pulser : 2
6- Clock : 967
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 4.7 MeV/u
Beam intensity : ~1.8 pA (~1.5 pA @7.30) --> Laser quality is decreasing
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32
del_E leakage (uA) : 0.8
E voltage (V) : -350
E leakage (uA) : 1.745
E_hi voltage (V) : -13.5 to -14
E_hi leakage (uA) : 0.895
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : -0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : -0.28 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 6.8E-06
Pressure (old gauge) : 1.9E-05
Pressure (SEC) : 3.9E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -9.9
Temp (chamber) : 5.6 (from before)
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
- since 6:20 RF problem on ring2 (although 3 full inj are shown) : ~1.6E+14 protons only
- 07:34 MIDAS crashed ("arithmetic exception (core dumped)")
- 07:36 restart MIDAS-session: DAQ is still fine, start spectrum viewer, SortSas still open and working, Open
Scalers (tick "Enable Rates") fine)
==================================================== |
81
|
Fri Nov 10 04:18:41 2017 |
MD, ASM | Run 78 | Header: 4.7 MeV/u and Empty frame.
Ender:
====================================================
Run number : 78
Date : 10/11
Start time : 05:18:20
Stop time : 05:49:43
Trigger rate (MIDAS) : 2-3
Blocks written : 165
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 2
1- Gated : 2
2- dE : 31
3- E : 2
4- HI : 11
5- Pulser : 2
6- Clock : 967
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 4.7 MeV/u
Beam intensity : ~2.0 pA (at the end maybe ~1.7 pA)
Target : Empty frame (Pos#7)
Ladder position : 52.09
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32
del_E leakage (uA) : 0.8
E voltage (V) : -350
E leakage (uA) : 1.75
E_hi voltage (V) : -13.5 to -14
E_hi leakage (uA) : 0.895
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : -0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : -0.28 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 6.8E-06
Pressure (old gauge) : 1.9E-05
Pressure (SEC) : 3.9E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -10.0
Temp (chamber) : 5.6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: scaler on HI-det: around 10 --> prescaler = 0. Thats why only E trigger. Check if trigger technique
also suits empty frame runs.
see few dE versus E event --> scattered on target frame (I guess)
==================================================== |
80
|
Fri Nov 10 02:12:06 2017 |
MD, ASM, DK | Run 77 |
Header: 4.7 MeV/u and C_09. continue after fixing IHS Cavity (part of normal conducting linac)
Ender:
====================================================
Run number : 77
Date : 10/11
Start time : 03:13:59
Stop time : 05:14:52
Trigger rate (MIDAS) : 6
Blocks written : 796
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 8
1- Gated : 7
2- dE : 34
3- E : 7
4- HI : 586
5- Pulser : 2
6- Clock : 967
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 4.7 MeV/u
Beam intensity : 2.25 pA
Target : C_09 (Pos#5; ~545 ug/cm2)
Ladder position : 82.44
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32.5
del_E leakage (uA) : 0.8
E voltage (V) : -350
E leakage (uA) : 1.75
E_hi voltage (V) : -14
E_hi leakage (uA) : 0.88
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55A
PA power (upstream, negative) : 0.55A
PA power (downstream, positive) : 0.8A
PA power (downstream, negative) : 0.28A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 6.8E-06
Pressure (old gauge) : 1.9E-05
Pressure (SEC) : 3.9E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -9.9
Temp (chamber) : 5.6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments:
before run number increased twice --> no run76
2h of Carbon reference.
==================================================== |
79
|
Fri Nov 10 01:29:51 2017 |
ASM, MD, DK | run 75 | Header: 4.7 MeV/u and C_09. PS back, but need to check how much beam actually there was before next issue
Ender: no beam at our sample; IHS cavity (part of normal conducting linac) tripped
====================================================
Run number : 75
Date : 10/11
Start time : 02:20:11
Stop time : 02:41:21
Trigger rate (MIDAS) :
Blocks written : 77
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated : 2
1- Gated : 2
2- dE : 7
3- E : 2
4- HI : 2
5- Pulser : 967
6- Clock : 0
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 4.7 MeV/u
Beam intensity : 2.0-2.5 pA (in the beginning)
Target : C_09 (Pos #5 - 82.44mm), chosen due to similar thickness as CH2_30+25, as used before
Ladder position : 82.44
HI Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -32
del_E leakage (uA) : 0.8
E voltage (V) : -350
E leakage (uA) : 1.75
E_hi voltage (V) : -14
E_hi leakage (uA) : 0.88
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive) : 1.55A
PA power (upstream, negative) : 0.55A
PA power (downstream, positive) : 0.8A
PA power (downstream, negative) : 0.28A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 6.8E-06
Pressure (old gauge) : 1.9E-05
Pressure (SEC) : 3.8E-06
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -10.1
Temp (chamber) : 5.4 (from before)
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: realised no beam on target after couple of minutes: normal conducting cavity tripped
Alex and Daid try to fix it.
==================================================== |
78
|
Thu Nov 9 23:10:38 2017 |
MD | preparation for Carbon C_09 (Run 75) | 10/11/17: 00:03
switch target ladder to Pos #5: 82.44 mm
Carbon foil C_09 in place
(similar thickness as CH2_30+25, as used before)
Ready for beam coming back. |
77
|
Thu Nov 9 21:31:16 2017 |
SL | Run 74 |
Header: 4.7 MeV/u and CH2_30+25.
Ender: STOP due to PSB fire.
====================================================
Run number : 74
Date : 09/11
Start time : 22:33
Stop time : 23:42
Trigger rate (MIDAS) :
Blocks written : 422
——————————————————————————————
Run Scalars (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.5pA
Target : #6 CH2_33+35
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : 32
del_E leakage (uA) : 0.75
E voltage (V) : 350
E leakage (uA) : 1.73
E_hi voltage (V) : 14
E_hi leakage (uA) : 0.85
——————————————————————————————
PA power (upstream, positive) : 1.55A
PA power (upstream, negative) : 0.55A
PA power (downstream, positive) : 0.8A
PA power (downstream, negative) : 0.28A
——————————————————————————————
Pressure (IMG1) : 7.0E-06
Pressure (old gauge) : 2.0E-05
Pressure (SEC) : 3.9E-06
——————————————————————————————
Temp (Chiller) : -10
Temp (chamber) : 5.4
——————————————————————————————
Comments:
ISOLDE: (PSB is 1 ring down - CCC operator to return 1st ring when fixed)
Fluctuations in intensity throughout run, as operator attempts to restart.
Final decision made to run with 3 rings and more runs per supercycle at 23:10.
==================================================== |
76
|
Thu Nov 9 20:46:29 2017 |
SL | Run 73 |
Header: 4.7 MeV/u and CH2_30+25.
Ender: NO BEAM FROM PSB - called CCC and stopped run.
====================================================
Run number : 73
Date : 09/11
Start time : 21:44
Stop time : 22:25
Trigger rate (MIDAS) :
Blocks written : 263
——————————————————————————————
Run Scalars (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E :
4- HI :
5- Pulser :
6- Clock :
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.7pA
Target : #6 CH2_33+35
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : 32
del_E leakage (uA) : 0.75
E voltage (V) : 350
E leakage (uA) : 1.73
E_hi voltage (V) : 14
E_hi leakage (uA) : 0.85
——————————————————————————————
PA power (upstream, positive) : 1.55A
PA power (upstream, negative) : 0.55A
PA power (downstream, positive) : 0.8A
PA power (downstream, negative) : 0.28A
——————————————————————————————
Pressure (IMG1) : 7.0E-06
Pressure (old gauge) : 2.0E-05
Pressure (SEC) : 3.9E-06
——————————————————————————————
Temp (Chiller) : -10
Temp (chamber) : 5.4
——————————————————————————————
Comments:
TDCs now in common stop mode, previously in normal mode. Now working correctly.
==================================================== |
75
|
Thu Nov 9 19:06:08 2017 |
SL | Run 68-71 | JUNK |
74
|
Thu Nov 9 18:56:13 2017 |
SL | Run 72 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run number : 72
Date : 09/11
Start time : 20:14
Stop time : 21:41
Trigger rate (MIDAS) :
Blocks written : 570
——————————————————————————————
Run Scalars (approx rates)
0- Ungated : 12
1- Gated : 10
2- dE : 59
3- E : 8
4- HI : 672
5- Pulser : 2
6- Clock : 967
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.7pA
Target : #6 CH2_33+35
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : 32
del_E leakage (uA) : 0.75
E voltage (V) : 350
E leakage (uA) : 1.73
E_hi voltage (V) : 14
E_hi leakage (uA) : 0.85
——————————————————————————————
PA power (upstream, positive) : 1.55A
PA power (upstream, negative) : 0.55A
PA power (downstream, positive) : 0.8A
PA power (downstream, negative) : 0.28A
——————————————————————————————
Pressure (IMG1) : 7.0E-06
Pressure (old gauge) : 2.0E-05
Pressure (SEC) : 3.9E-06
——————————————————————————————
Temp (Chiller) : -10
Temp (chamber) : 5.4
——————————————————————————————
Comments:
TDCs now in common stop mode, previously in normal mode. Now working correctly.
==================================================== |
73
|
Thu Nov 9 17:35:32 2017 |
RG | Run 67 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run number : 67
Date : 09/11
Start time : 18:30
Stop time : 19:57
Trigger rate (MIDAS) : 10
Blocks written : 463
——————————————————————————————
Run Scalars (approx rates)
0- Ungated : 10
1- Gated : 9
2- dE : 48
3- E : 7
4- HI : 561
5- Pulser : 2
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.7pA
Target : #6 CH2_33+35
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : 32
del_E leakage (uA) : 0.75
E voltage (V) : 350
E leakage (uA) : 1.73
E_hi voltage (V) : 14
E_hi leakage (uA) : 0.85
——————————————————————————————
PA power (upstream, positive) : 1.55A
PA power (upstream, negative) : 0.55A
PA power (downstream, positive) : 0.8A
PA power (downstream, negative) : 0.28A
——————————————————————————————
Pressure (IMG1) : 7.0E-06
Pressure (old gauge) : 2.0E-05
Pressure (SEC) : 3.9E-06
——————————————————————————————
Temp (Chiller) : -10
Temp (chamber) : 5.4
——————————————————————————————
Comments:
saving spectra: /directory/r67/spectra
"Online dE v E and PI v dE+E spectra show foldback for alpha events at
c. 32MeV which implies that the thickness of the E detector is c. 500um."
==================================================== |
72
|
Thu Nov 9 17:01:49 2017 |
TD | CAEN V560 Scalers added to datastream | CAEN V560 Scaler channels #0-7 have been added to the EbyE datastream by adding
per event readout of defined VME registers identified as group 31, items 0-15
w26> cat /MIDAS/experiments/daq/VMEDataSources
32 0x00660010 32 31 0
32 0x00660014 32 31 2
32 0x00660018 32 31 4
32 0x0066001c 32 31 6
32 0x00660020 32 31 8
32 0x00660024 32 31 10
32 0x00660028 32 31 12
32 0x0066002c 32 31 14 |
71
|
Thu Nov 9 16:30:15 2017 |
SL | Run 66 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (p+n E OR p+n HI (with 2^8 prescaler))
Ender:
====================================================
Run number : 66
Date : 9 / 11
Start time : 18:09
Stop time : 18:30
Trigger rate (MIDAS) :
Blocks written : 84
——————————————————————————————
Run Scalars
0- Ungated : 14
1- Gated : 12
2- dE : 51
3- E : 11
4- HI : 672
5- Pulser : 2
6- 1kHz Clock : 967
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.5 to 2.0 pnA
Target : #6 CH2_30+25
Ladder position : 67.26 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.5 V
del_E leakage (uA) : 0.08 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.835 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.0 x 10^-6 mbar
Pressure (old gauge) : 2.0 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.2 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments: Beam stopped short because the beam went off from PBS towards the end.
==================================================== |
70
|
Thu Nov 9 15:55:56 2017 |
SL | Run 65 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (E - corrected, not HI, now ~50% live time)
Ender:
====================================================
Run number : 65
Date : 9 / 11
Start time : 16:56
Stop time : 17:27
Trigger rate (MIDAS) :
Blocks written : 179
——————————————————————————————
Run Scalars
0- Ungated : 10
1- Gated : 10
2- dE : 50
3- E : 10
4- HI : 666
5- Pulser : 2
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.5 to 2.0 pnA
Target : #6 CH2_30+25
Ladder position : 67.26 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.5 V
del_E leakage (uA) : 0.08 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.835 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.1 x 10^-6 mbar
Pressure (old gauge) : 2.1 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.0 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments:
in sum spectra S4000: Counts above 100 MeV: 12
==================================================== |
69
|
Thu Nov 9 15:34:14 2017 |
SL | Run 64 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (JUST E, not HI, now ~50% live time)
Ender: Stopping as trigger seems slightly off
====================================================
Run number : 64
Date : 9 / 11
Start time : 16:38
Stop time : 16:56
Trigger rate (MIDAS) :
Blocks written : 102
——————————————————————————————
Run Scalars
0- Ungated : 10
1- Gated : 10
2- dE : 75
3- E : 6
4- HI : 90
5- Pulser : 2
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.5 to 2.0 pnA
Target : #6 CH2_30+25
Ladder position : 67.26 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.5 V
del_E leakage (uA) : 0.08 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.835 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.1 x 10^-6 mbar
Pressure (old gauge) : 2.1 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.0 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments:
==================================================== |
68
|
Thu Nov 9 15:03:21 2017 |
SL | Run 63 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (dE+E, not HI, now ~50% live time)
Ender:
====================================================
Run number : 63
Date : 9 / 11
Start time : 16:03
Stop time : 16:33
Trigger rate (MIDAS) :
Blocks written : 270
——————————————————————————————
Run Scalars (approx rates)
0- Ungated : 56
1- Gated : 34
2- dE : 43
3- E : 5
4- HI : 654
5- Pulser : 2
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.5 to 2.0 pnA
Target : #6 CH2_30+25
Ladder position : 67.26 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.5 V
del_E leakage (uA) : 0.08 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.835 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.1 x 10^-6 mbar
Pressure (old gauge) : 2.1 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.0 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments:
in sum spectra S4000: Counts above 100 MeV: 8
==================================================== |
67
|
Thu Nov 9 12:15:33 2017 |
SL | TIMBER: Faraday Cup Measurements | Faraday Cup (at end of Edinburgh chamber) measurements recorded in TIMBER (from approx 10.00 9/11/17). |
66
|
Thu Nov 9 12:14:05 2017 |
SL | Run 62 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run number : 62
Date : 9 / 11
Start time : 13:55
Stop time : 16:03
Trigger rate (MIDAS) : 50
Blocks written : 1299
——————————————————————————————
Run Scalars (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E :
4- HI :
5- Pulser :
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : 1.5 to 2.0 pnA
Target : #6 CH2_30+25
Ladder position : 67.26 mm
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32.5 V
del_E leakage (uA) : 0.08 uA
E voltage (V) : -350 V
E leakage (uA) : 1.73 uA
E_hi voltage (V) : -14 V
E_hi leakage (uA) : 0.835 uA
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : 0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : 0.28 A
——————————————————————————————
Pressure (IMG1) : 7.1 x 10^-6 mbar
Pressure (old gauge) : 2.1 x 10^-5 mbar
Pressure (SEC) : 3.9 x 10^-6 mbar
——————————————————————————————
Temp (Chiller) : -10.0 deg
Temp (chamber) : 5.5 deg
——————————————————————————————
Comments:
==================================================== |
|