AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 9 of 11  ELOG logo
Entry  Mon Nov 6 16:12:47 2017, Peter Black, chamber drawings FullAssemb2.PDFsection.PDF
Entry  Mon Nov 6 10:52:58 2017, Peter Black, alignment hardware drawings ladder_alignment_block.PDFS2_alignment_bar.PDFalignment_plug_70mm.PDFalignment_plug.PDF
Entry  Mon Nov 6 10:50:33 2017, Peter Black, foil mount drawings SiPD_foil_mount.PDFfOIL_HOLDER.PDF
Entry  Mon Nov 6 10:46:53 2017, Peter Black, Faraday cup drawings Farady_cup.PDFcup.PDFsupressor.PDFFarady_cup_main.PDF
Entry  Sun Nov 5 20:25:10 2017, Ruchi, Circuit diagram and cable mapping Cabling.pdfPreampsPCBs.pdfCircuit.pdf
Entry  Sat Nov 4 14:10:20 2017, daid, Julabo chiller operation 
Entry  Sat Nov 4 06:29:03 2017, TD, MIDASsort online sort programs, spectrum titles, calibration s/w & READMEs IS607.tar.gzCalibration.tar.gzREADMEs.tar.gz
Entry  Mon Oct 30 09:46:04 2017, Peter Black, Notes on iris install/operation 
Entry  Tue Oct 24 09:27:24 2017, Peter Black, DK, Safety words  
Entry  Thu Oct 19 14:41:19 2017, daid, heavy ion degrader foil - full / new 8x
Entry  Thu Oct 19 10:55:54 2017, Claudia, Meeting 19.10. 
Entry  Thu Oct 12 12:45:54 2017, Claudia, Meeting 12.10.17 
Entry  Thu Oct 5 11:34:34 2017, Claudia, Meeting 5.10.17 
Entry  Wed Oct 4 18:57:16 2017, dk, Digitized run notes from tests at CERN 
Entry  Thu Sep 28 03:38:18 2017, dk, heavy ion degrader foil - updated 8x
Entry  Thu Sep 28 03:34:20 2017, dk, heavy ion degrader foil degrader.pdf
Entry  Mon Sep 25 14:50:46 2017, dk, To do list before main exp. - update from meeting 28th September 
Entry  Thu Sep 21 14:54:00 2017, Claudia, Alpha Calibration Spectra Screenshot_from_2017-09-21_14-43-48.pngScreenshot_from_2017-09-21_14-43-17.png
Entry  Tue Sep 19 14:54:47 2017, Claudia, Toby, Setup Photos 14x
Entry  Thu Sep 14 15:40:42 2017, TD, MSL type S2 bias data MSLtypeS2.txt
ELOG V3.1.4-unknown