AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40 MONNET
  MONNET, Page 2 of 2  ELOG logo
ID Date Author Subject Text Attachments
  12   Sat Feb 28 08:59:14 2026 SB, TD, FGIR53
start: 16:14:44 27.2.26
stop: 08:38:26 2.3.26
 6x 
  11   Fri Feb 27 15:17:59 2026 SB, TD, FGIR52Start: 15:06:06 GMT
Stop: 16:13:45
Blocks: 875
  
  10   Fri Feb 27 14:38:28 2026 SB, TD, FGIR51
start: 14:31:03 (w23 is set to GMT)
stop: 14:38:09
 9.png 
  8   Fri Feb 27 12:41:34 2026 SB, TD, FGIFriday 27 February 2026
BNC PB-5 settings
Amplitude 5.0V
 11x 
  7   Thu Feb 12 12:18:16 2026 CLWpaper   Hanselman-2024-Improved-modeling-of-neutron-induce.pdf 
  6   Tue Feb 10 09:31:47 2026 Francisco Garci­a InfantesDetector Voltage vs CurrentAnalysis
of how the current changes with increasing
voltage for both detectors.
 Voltage_vs_Current.png 
  5   Tue Feb 10 09:03:26 2026 Francisco Garci­a InfantesContents of shipment boxesBOX
A

  
  3   Fri Jan 30 15:45:48 2026 Francisco Garci­a InfantesDAQ and cables statusConcerning the electronic
stuff. We will need:
 VME_V430_crate.jpegCAMAC_Crate.jpegJonction_Box.jpegNIM_bin.jpegVME_V430_crate.jpeg 
  2   Thu Jan 29 16:16:46 2026 Francisco García InfantesSetUp StatusHere is a brief status update on the chamber
setup.

At the moment, we have all the
 Preamp_Modules.jpegChamber_In.jpegFrom_Chamber.jpegVoltage_Cable.jpeg 
  1   Mon Jan 26 11:29:14 2026 ClaudiaCount rate estimate and particle energiesCount rate estimate for all reaction measurements
planned. 

 kinematics.cneutron_fluxes.xlsx 
ELOG V3.1.3-7933898