Entry  Sat Feb 28 08:59:14 2026, SB, TD, FGI, R53 6x

start: 16:14:44 27.2.26
stop: 08:38:26 2.3.26
Entry  Fri Feb 27 15:17:59 2026, SB, TD, FGI, R52 
Start: 15:06:06 GMT
Stop: 16:13:45
Blocks: 875
Entry  Fri Feb 27 14:38:28 2026, SB, TD, FGI, R51 9.png

start: 14:31:03 (w23 is set to GMT)
stop: 14:38:09
Entry  Fri Feb 27 12:41:34 2026, SB, TD, FGI, Friday 27 February 2026 11x

BNC PB-5 settings
Amplitude 5.0V
Entry  Thu Feb 12 12:18:16 2026, CLW, paper Hanselman-2024-Improved-modeling-of-neutron-induce.pdf
 
Entry  Tue Feb 10 09:31:47 2026, Francisco Garci­a Infantes, Detector Voltage vs Current Voltage_vs_Current.png
Analysis of how the current changes with increasing voltage for both
detectors.

Detector 100 um.
Entry  Tue Feb 10 09:03:26 2026, Francisco Garci­a Infantes, Contents of shipment boxes 
BOX A

1) VME V340 crate, fan tray. Serial number 3797053, type UEL
6020.
Entry  Fri Jan 30 15:45:48 2026, Francisco Garci­a Infantes, DAQ and cables status VME_V430_crate.jpegCAMAC_Crate.jpegJonction_Box.jpegNIM_bin.jpegVME_V430_crate.jpeg
Concerning the electronic stuff. We will need:


1x NIM bin.


Pulser
(Model PB-5)
Sum&Invert (Model 433A)
Entry  Thu Jan 29 16:16:46 2026, Francisco García Infantes, SetUp Status Preamp_Modules.jpegChamber_In.jpegFrom_Chamber.jpegVoltage_Cable.jpeg
Here is a brief status update on the chamber setup.

At the moment, we have all the main components required for the experiment related to the chamber:



Vacuum chamber
Entry  Mon Jan 26 11:29:14 2026, Claudia, Count rate estimate and particle energies kinematics.cneutron_fluxes.xlsx
Count rate estimate for all reaction measurements planned. 


Assumptions: