AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 4 of 4  ELOG logo
ID Date Authorup Subject Text Attachments
  6   Fri Oct 16 15:36:13 2015 Sarah Lonsdale06/10/15 Leakage, dE signal problem solving and external pulser trigger   6x 
  7   Fri Oct 16 15:41:14 2015 Sarah Lonsdale06/10/15 Changes to DAQ and pulser settings   2015-10-06_delay.jpg2015-10-06_trig.jpg 
  8   Fri Oct 16 15:56:01 2015 Sarah Lonsdale07/10/15 Alpha source in, change to pulser delay   6x 
  9   Fri Oct 16 16:01:41 2015 Sarah Lonsdale08/10/15 Removed source and sample, leakage current checkRemoved source and removed Li sample for
blank frame test
  
  10   Fri Oct 16 16:11:41 2015 Sarah Lonsdale09/10/15 Photos of detectors (reversed dE wiring) and upper level frame for future set up, leakage current   2015-10-09_09.16.16.jpg2015-10-09_09.16.22.jpg2015-10-09_09.29.23.jpg2015-10-09_09.29.35.jpg2015-10-09_09.30.02.jpg 
  43   Thu Jul 27 11:53:52 2023 TDMSL type W1 detector data for 26Al(n,X) experiment EAR2, n_TOFMSL type W1(SS)-20

3186-9  20um Depletion voltage 3V Operating
  
  62   Mon Aug 14 11:00:13 2023 TDRAL108 +/-15V PSU test in ISOLDE hall
This morning 2x RAL108 +/-15V PSUs were borrowed
from the Edinburgh equipment in the ISOLDE
 13x 
  66   Sat Aug 19 14:14:26 2023 TDRAL108 +/-15V PSU test - JCMB 18.8.23PSU Calex

Setup and PSU details - attachments 1-3
 10x 
  67   Mon Aug 21 12:08:59 2023 TDRAL108 +/-15V PSU test - JCMB 21.8.23PSU Calex

Setup, PSU and ac mains filter - attachments
 13x 
  63   Tue Aug 15 10:17:39 2023 TD, NSRAL108 +/-15V PSU test at EAR2, n_TOF Monday 14 AugustOn the morning of Monday 14 August 2x RAL108
+/-15V PSUs were borrowed from the Edinburgh
equipment in the ISOLDE hall to check whether
 7x 
  64   Tue Aug 15 11:41:27 2023 TD, NSMonday 14 August - vacuum chamber pressure
08.35 Vacuum chamber pressure OK - see attachment
1
 20230814_083514.jpg 
  52   Thu Aug 10 16:11:57 2023 TD, NS, ARNoise
Observe c. 2mV p to p noise with DSO ( Z_in
= 50 Ohm ) c. 60us period with HF structure.
 20230810_162959.JPGIMG_2906.jpeg20230810_164219.JPG 
  56   Fri Aug 11 10:02:08 2023 TD, NS, ARNoise
Check RAL108 +/-15V PSU
 20230811_104233.jpg20230811_104253.jpg 
ELOG V3.1.4-unknown