AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 5 of 5  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Mon Mar 25 12:57:30 2024, Clw, Adapters for ntof setup 20240325_125536.jpg20240325_125528.jpg
10 new Adapters for lemo to bnc on my desk
Entry  Thu Sep 12 11:07:29 2024, Nick, 40K Borrowed Items 
We borrowed from n_TOF:

1x O-ring for circular side-flanges on the chamber (the borrowed part has a small green marker cross on it)

10x LIMO-to-BNC connectors (BNC female) from electronics lab outside EAR1
Entry  Mon Sep 16 12:36:45 2024, TD, 34-way IDC to 37-way D connector ribbon cables 20240916_121057_(1).jpg20240916_121052_(1).jpg20240916_121047_(1).jpg20240916_121003_(1).jpg

The 2x sets of 34-way IDC to 37-way D connctor ribbon cables used at GSI for the two-alpha decay measurement have been located - see attachments 1-4.
Entry  Sat Aug 12 09:24:19 2023, Nikolay Sosnin, 26Al Protons 
Here is a Google spreadsheet for counting protons for the runs:

https://docs.google.com/spreadsheets/d/1INX8G9GAu-M70SdZdz55qXnMZNXKXLW7xfFH-eaLuQw/edit?usp=sharing
Entry  Wed Sep 27 09:54:06 2023, Emmanuel, 10B sample in 20230926_113136.jpg20230926_113811.jpg20230926_115036.jpg20230926_115053.jpg20230926_111737.jpg
We switched from Aluminium target to Boron Target (number 1) on Tuesday (26th of Sept.). The Aluminium target was placed in the material room
by the RP. We will change to LiF (number 3) on Thursday (28th of Sept.)
Entry  Fri Oct 16 16:11:41 2015, Sarah Lonsdale, 09/10/15 Photos of detectors (reversed dE wiring) and upper level frame for future set up, leakage current 2015-10-09_09.16.16.jpg2015-10-09_09.16.22.jpg2015-10-09_09.29.23.jpg2015-10-09_09.29.35.jpg2015-10-09_09.30.02.jpg
 Leakage before take down:
Entry  Fri Oct 16 16:01:41 2015, Sarah Lonsdale, 08/10/15 Removed source and sample, leakage current check 
Removed source and removed Li sample for blank frame test

Entry  Fri Oct 16 15:56:01 2015, Sarah Lonsdale, 07/10/15 Alpha source in, change to pulser delay 6x
Alpha source in - containing 148Gd, 241Am, 239Pu, 244Cm    (4x 1kBq)
Entry  Fri Oct 16 15:36:13 2015, Sarah Lonsdale, 06/10/15 Leakage, dE signal problem solving and external pulser trigger 6x
 Leakage tues am
Entry  Fri Oct 16 15:41:14 2015, Sarah Lonsdale, 06/10/15 Changes to DAQ and pulser settings 2015-10-06_delay.jpg2015-10-06_trig.jpg
 Pulser out of 5,6,7 EFED- extended to 32ms
Entry  Mon Oct 12 11:50:52 2015, Sarah Lonsdale, 05/10/15 Pulser, Wiring information and DAQ initial set up 2015-10-05_15.19.54.jpg2015-10-05_15.20.24.jpg2015-10-05_15.22.39.jpg2015-10-05_15.22.46.jpg
600mV in 50ohm coax with 25 hz pulser (positive signal) - see 2015-10-05_15.19.54.jpg 
Entry  Mon Oct 12 12:04:51 2015, Sarah Lonsdale, 05/10/15 Photo of detector distances and layout 8x
Fairly self explanatory, note that images with time-stamps before 13.08.29 were taken before fitting the o-ring on the flange and therefore lateral positions
will be different to photos after 13.08.29. Individual detector heights were not changed.
Entry  Mon Oct 12 12:07:24 2015, Sarah Lonsdale, 05/10/15 Changes to DAQ settings 
 Note that detailed DAQ information available from project-ntof.cern.ch erunbook ear2.
As a rough guide: 
Entry  Mon Oct 12 11:27:02 2015, Sarah Lonsdale, 05/10/15 - Set up notes 8x
 20 micron (see 2015-10-05_12.46.59.jpg
Entry  Sat Jul 12 11:25:35 2025, Selin, The Detector Bias-Leakage Current Data Ca-VoltageCurrent.xlsx
This Excel sheet has the detector bias-leakage current data and plot for both detectors.

Detector 2 has lower leakage current and a flatter plateau region.
ELOG V3.1.4-unknown