AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 1 of 5  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Mon Jul 31 10:21:41 2023, Nikolay Sosnin, n_TOF Data and Filtering Al26_Filtering.pptx
 
Entry  Wed Feb 12 13:51:02 2025, CLW, expected counts B and Li 6x
The rootfiles countsB.root and countsLi.root contain histograms of count spectra that would be expected at n_TOF for a 10B and a 6Li target,
respectively. The units in y are arbitrary. This can be used to check, if we can reproduce the expected trend with our Li and B measurements. So the histograms
called "counts" can be directly compared to the histograms called "energy" in Sili_deed.c (they should have the same binning). You
Entry  Mon Jul 21 10:30:01 2025, Selin, The 2D Energy Spectrum of Ca41 Screenshot_from_2025-07-21_08-51-09.png
The 2D energy spectrum of Ca41 (36 runs). The expected alpha energies are 4.8 MeV (alpha_0) and 2.7 MeV (alpha_1).
Entry  Thu Oct 6 09:34:30 2022, Claudia, Test setup Photos and cabling 20221005_174742.jpg20221005_174759.jpg20221005_184752.jpg20221005_184801.jpg20221005_174742.jpg
Setup 5.10.22

dE 20 um (ID 2837-33) and 494 um double sided (ID 1194-9)

46 channels (2 connectors missing)
Entry  Thu Aug 10 11:30:32 2023, Nikolay Sosnin, Silicons and LiF3+Gafchromic Target 18x
 
Entry  Fri Jun 20 09:49:11 2025, CLW, Silicon detector setup description SiliSetupEAR2.pdf
 
Entry  Sat Oct 8 11:56:49 2022, Nikolay Sosnin, Silicon Strips of Concern 
DEED 6 and 9 no signal throughout the campaign.

EFED 27 high oscillations in baseline throughout the campaign.
Entry  Fri Jul 11 09:16:18 2025, TD, Silena 7710 Quad Bias Supply manual and internal configuration Silena_7710_quad_bias_supply.pdf
Manual - see attachment 1

Entry  Fri Aug 11 13:06:54 2023, Annie, Signal Spreadsheet info IMG_2920.JPGIMG_2921.JPGIMG_2922.JPG
Spreadhseet made for shifters to manually enter that they have checked each signal and that they can see gamma-flashes. It is saved as "26Al_EAR2_Signal_Checks.ods",
it is located on the second monitor on the right of the control room, next to the monitor used to see the beam intensity (same monitor used to see signals).

It will stay open throughout the campeign. Shifters have been told to check signals more than just the once to record that they're okay,
Entry  Fri Sep 2 12:03:40 2016, Sarah, SPD card changed 
14 bit card replaced for DEED 9-12, to prevent issue with pulser arriving before gamma flash.
Entry  Wed Jul 16 08:55:22 2025, Selin, Run221141 Boron Uncalibrated Data B_Strip1.pngB_ded_2d.pngB_Strip22.png
Plots of Boron #1 run (221141) from the Ca41 campaign with the right voltage applied (11.07.2025).

1- Uncalibrated amplitude spectra of strip 1 (dedicated).

2- Uncalibrated 2d energy plot of Boron dedicated data.
Entry  Wed Jul 16 08:51:06 2025, Selin, Run221136 Lithium Uncalibrated Data Li_Strip1.pngLi_Strip1_Par.pngLi_ded_2d.png
Plots of Lithium #3 run (221136) from the Ca41 campaign with the right voltage applied (11.07.2025).

1- Uncalibrated amplitude spectra of strip 1 (dedicated).

2- Uncalibrated amplitude spectra of strip 1 (parasitic).
Entry  Sat Jul 12 10:30:06 2025, Francisco García Infantes, Report Experimental SetUp Ca41 Experimental_Setup_Ca41.pdfCurrent_Value_Voltage_-15.jpegCurrent_Value_Voltage_15.jpegLeakage_Current_Detector.jpeg
I'm attaching a report for the experimental setup so far.

There is a main problem which haven't been solved yet and I don't know if that can cause problem in the future analysis.

Channels #23, #24, #31 and #32 are not working well. The signal os these channels look attenuated from the pulser, make impossible to see
Entry  Mon Aug 14 11:00:13 2023, TD, RAL108 +/-15V PSU test in ISOLDE hall 13x

This morning 2x RAL108 +/-15V PSUs were borrowed from the Edinburgh equipment in the ISOLDE hall to check whether the same transient noise is observed
at the +/-15V PSU 
Entry  Tue Aug 15 10:17:39 2023, TD, NS, RAL108 +/-15V PSU test at EAR2, n_TOF Monday 14 August 7x
On the morning of Monday 14 August 2x RAL108 +/-15V PSUs were borrowed from the Edinburgh equipment in the ISOLDE hall to check whether the same transient

noise is observed at the +/-15V PSU outputs.
Entry  Mon Aug 21 12:08:59 2023, TD, RAL108 +/-15V PSU test - JCMB 21.8.23 13x
PSU Calex

Setup, PSU and ac mains filter - attachments 1-3
Entry  Sat Aug 19 14:14:26 2023, TD, RAL108 +/-15V PSU test - JCMB 18.8.23 10x
PSU Calex

Setup and PSU details - attachments 1-3
Entry  Wed Aug 6 11:20:52 2025, Selin, Pulser Test front_2V.pngfront_less2V.pngfront_less1V.pngback_2V.png
The pulser test was performed with a frequency of 500 Hz and with voltage settings of: 2V, 1.6V, 1.2V, 0.8V, 0.6V, 0.4V, 0.3V, 0.2V, 0.1V, 0.05V, 0.025V.

The run was started with calibration settings and then the voltage was changed every 2.5-3 minutes.

From the attached plots, it can be seen that everything is as expected. This means that the pulser multipolarity is consistent with front and
Entry  Fri Aug 11 09:11:04 2023, Annie, Pulse Settings IMG_2908.JPGIMG_2909.JPGIMG_2910.JPGIMG_2911.JPG
 
Entry  Fri Aug 11 10:12:02 2023, Annie, Pressure, voltage and current check IMG_2915.JPGIMG_2916.JPGIMG_2918.JPG
 
ELOG V3.1.4-unknown