AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 8 of 46  ELOG logo
  ID Date Author Subject Text Attachments
  804   Sat May 18 04:47:22 2019 TDSaturday 18 May12.47 DAQ continues OK to file May19/R7_3

      alpha background
 17x 
  803   Fri May 17 08:10:05 2019 TDAIDA+DTAS @ BigRIPS F11   10x 
  802   Fri May 17 02:15:56 2019 CA, TD, OHFriday 17 May10.18 DAQ continues OK to file May19/R5_1

      alpha background
 15x 
  801   Thu May 16 02:13:10 2019 CA, OH, TDThursday 16th May10:13 all system wide checks OK *except* nnaida7
fails ADC calibration
 16x 
  800   Wed May 15 02:17:23 2019 CA, OH, TDWednesday 15 May10.18 DAQ continues OK to file May19/R2

      alpha background
 20x 
  799   Tue May 14 02:19:20 2019 CA, OH, TDTuesday 14th May 201910.20 System wide checks ok (except naida07
ADC calibration failure)
 11x 
  798   Mon May 13 10:13:26 2019 TDAIDA with 25MHz external clock does not work ... !
OH setup AIDA external clock using  Tektronix
AFG3102 - settings as follows
 2.png 
  797   Mon May 13 10:00:01 2019 TDReport - low - SETUP/Perform Timestamp Resync produces error message
AIDA@RIKEN
 1.png 
  796   Mon May 13 03:43:08 2019 CA, TD, OHSunday 12 May
19.12 all system wide checks OK *except*
nnaida7 fails ADC calibration
 14x 
  795   Mon May 13 03:23:58 2019 CA, TD, OHMonday 13 May
09.55 all system wide checks OK *except*
nnaida7 fails ADC calibration
 18x 
  794   Sat May 11 02:50:14 2019 CA, OH, TDSaturday 11th May 201910:52 system wide checks ok, except naida07
fails ADC calibration
      good event statistics, rates in naida19,20,23,24
 190511_1053_stats.png190511_1053_temp.png190511_1054_bias.png 
  793   Fri May 10 05:58:01 2019 CA, OH, TDFriday 10 May 201911.00 - chiller refilled and switched on
        set to 20 degrees celsius
 12x 
  792   Tue Mar 26 14:02:59 2019 OHInventory to be shipped backInventory is currently packaged up under the
AIDA desk in B3F
  
  791   Sun Nov 18 02:02:48 2018 TDLatest detector bias & leakage current spreadsheet (URL and csv & xlsx files)https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=1347508769  AIDA_leakage_current(17).xlsxAIDA_leakage_current_-_Sep2018.csv 
  790   Fri Nov 16 06:01:47 2018 CAHigh Energy Channel Ex vs Ey for different degrader thicknesses15.04 Plots of X Energy vs Y Energy for each
detector, and for 4 different Al degrader
thicknesses, as indicated
 2_3HECexey.png2_8HECexey.png3_0HECexey.png3_3HECexey.png 
  789   Fri Nov 16 04:47:39 2018 CA, TD, OHCorrelation analysis at different degrader Al thickness13.53 Correlation analysis plot of all detectors
with 3.3mm Al degrader thickness (attachment
1)
 3mmcorr.png181116_1350_det12.png181116_1351_det34.png181116_1352_det56.png 
  788   Thu Nov 15 22:55:38 2018 CA, TD, OH, LSFriday 16th November 08.00 - 16.0007.56 DAQ continues - AIDA file RIBF148/R5_822
      165Pm BigRIPS setting + 2.8mm Al degrader
 42x 
  787   Thu Nov 15 15:05:33 2018 LSFriday 16 November 00.00 to 08.00
00.25 System wide checks ok * except nnaida
7 fails adc*
 9x 
  786   Thu Nov 15 06:52:09 2018 OHThursday 15th November 16:00 - 24:0015:51 DAQ continues - AIDA file RIBF148/R5_664
      165Pm BigRIPS setting + 2.8mm Al degrader
 11x 
  785   Wed Nov 14 22:54:11 2018 LSThursday 15th November 08:00 - 16:00
08.10 BRIKEN stop
      AIDA file RIBF148/R5_587
 10x 
ELOG V3.1.4-unknown