Sun Oct 30 04:37:31 2016, TD, Spectrum layouts created 8x
|
The following spectrum layouts have been created
1 All Rate spectra
|
Mon Aug 22 11:45:07 2016, Patrick Coleman-Smith, Software updated in Aida
|
Logged into aidas1, installed AidaExecV8 with a test of the time difference between SYNC data items. Failure to be 0x40000 clocks will cause a statistic
to be incremented. "SYNC Time Warp"
Installed updated versions of /MIDAS/TclHttpd/Html/AIDA/RunControl/sys.tcl and /MIDAS/TclHttpd/Html/AIDA/RunControl/implementation.tcl |
Thu Dec 14 10:53:27 2023, NH, MP, CC, GA, Snout Removed
|
Snout removed from S4
All detectors removed
|
Fri Dec 2 09:58:54 2016, DK, Simple PID with LISE++  
|
I wrote this LISE++ file based on the Takechi .lpp modified by AE for 77Ni, 78Ni, 76Ni.
Basically, I changed the primary beam to 48Ca, reduced the production target thickness to 1 mm (I think it may
|
Mon Aug 21 13:17:54 2023, TD, Silena 7710 HV test - JCMB 21.8.23 11x
|
Silena 7710 - see attachment 1
Bias -60V
|
Sun Aug 20 16:21:45 2023, TD, Silena 7710 HV test - JCMB 20.8.23 6x
|
Silena 7710 - see attachment 1
Bias -60V
|
Sun Jun 18 07:57:26 2017, TD, Seagate Backup Plus Hub 8Tb USB disk #3
|
N.B. data directory RIBF148 incomplete
|
Sun Jun 18 08:01:42 2017, TD, Seagate Backup Plus Hub 8Tb USB disk #2
|
aidas1> df -h
Filesystem Size Used Avail Use% Mounted on
/dev/mapper/vg_aidas1-lv_root
|
Mon May 29 05:26:39 2017, TD, Seagate Backup Plus Hub 8Tb USB disk #1
|
aidas1> df -h
Filesystem Size Used Avail Use% Mounted on
|
Tue Apr 26 07:10:56 2016, TD, Seagate Backup Plus 8Tb USB disk installed
|
I have installed a Seagate Backup Plus 8Tb (nominal) USB disk for data backup and
transfer to the UK
|
Wed May 22 07:36:08 2019, TD, Screenshots miscellaneous AIDA Control tabs 13x
|
| |
Sat Jun 1 09:14:19 2019, TD, Screenshots miscellaneous AIDA Control & Merge tabs 22x
|
| |
Sat Sep 30 12:14:52 2023, TD, Satuurday 30 September 10x
|
12.54 Power up
All system wide checks OK
|
Sat May 9 03:50:56 2015, TD & CG, Saturday 9 May 2015 
|
Gzip'd tar file of /MIDAS/DB - attachment 1
Scan of AIDA logbook - attachment 2
|
Sun May 29 10:11:07 2016, TD, CG & reply by PJCS, Saturday 8 May 2016 - reply about 'H' and "X"
|
> 15.20 DAQ histogramming & data transfer #1 enabled
> Merger configured, started, input paused
> Following DAQ GO nnaida9 data transfer 'X' nnaida19 histogramming 'H' disappear - see attachments 1-7
|
Sat Jun 8 06:08:52 2019, CB, TD, Saturday 8 June 13x
|
14.14 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
Water level c. 70% M-H markers
Temperature +25.3 deg C dew point +8.5 deg C RH 34.7%
|
Sat May 6 03:32:38 2017, OH, TD, Saturday 6 May 8x
|
11.30 Detector biases & leakage currents OK - see attachments 1 & 2
Ambient Temperature 24.3 Humidity 37.5% Dew Point 8.9
|
Sat Nov 5 01:55:15 2016, CG, TD, OH, Saturday 5th November 20x
|
10.55 DAQ found to have stopped at 06:47 during LN fill cycle.
10:57 Screen shots of system after stop
|
Fri Nov 3 23:09:36 2017, TD, OH, Saturday 4 November 20x
|
08.09 DAQ running OK - data transfer not enabled
BNC PB-4
|
Sat Jun 4 04:53:25 2016, TD, AE, CG, DK, GL YL & PJW (Team AIDA), Saturday 4 June 2016 8x
|
12.27 DAQ run R61 started 01.30
Appears to have stopped abruptly at ~06.55
All FEE64 AIDA SYNCs zero
|