  98   Mon May 4 02:32:29 2015 VFEP & TDHow to fix DAQ stalls at GOIt has been observed that when starting the
AIDA data acquisition (select 'GO' from the
'Data Acquisition Run
  
  97   Mon May 4 02:03:24 2015 TDUnable to obtain Data Acqusition Statistics frame

    

       
            
  
  96   Mon May 4 01:27:56 2015 JA, TD, AE, CG & JLTMonday 4 May 2015
09.18 SN changed degrader to 5.7mm Al (4mm
+ all variable degraders + additional 1mm)
 16x 
  95   Mon May 4 01:23:48 2015 TDUnable to obtain Data Acqusition Statistics frameGot the error Server Internal Error
while trying to obtain /DataAcquisitionControl/DataAcquisitionStats.tml.
  
  94   Sun May 3 01:32:18 2015 JA, TD, AE, CG, VP & JLTSunday 3 May 2015
09.19 Beam off on arrival, now back
      R51 running
  
  93   Sat May 2 19:20:59 2015 AErun R51 online spectraOnline spectra to monitor condition during
run R51.
 ADClow_vs_Ch_R51online.pngADChigh_vs_Ch_R51online.pngX_implant_R51online.pngE_implant_R51online.pngTraking_implant_R51online.png 
  92   Sat May 2 19:17:25 2015 AEtime-stamp for event reconstructionSome first analysis of building events to
look for implants and decays
 time_stamp_dist_disc.pngevt_time_stamp_disc_R51.pngXY_implant_disc_R51.pngevt_time_stamp_slowcomp_R51.pngXY_implant_slowcomp_R51.png 
  91   Sat May 2 14:41:20 2015 JA, TD, AE, CG, VP & JLTMUSIC detector signalsAdjusted setting of MUSIC detector signals
during break
 
 MUSIC_lowE.pngMUSIC_highE_log.png 
  90   Sat May 2 02:04:50 2015 JA, TD, AE, CG, VP & JLTSaturday 2 May 20150055: Degrader changed. 1mm removed.
         
  1.4mm total
 50x 
  89   Thu Apr 30 20:21:20 2015 Patrick Coleman-SmithHigh Energy Spectra from LYCCA with pulser> I have an eight FEE64 system now in place
on the LYCCA chamber with a PB-5 pulser going
into the adapter cards 
  
  88   Thu Apr 30 17:43:36 2015 Patrick Coleman-SmithHigh Energy Spectra from LYCCA with pulserI have an eight FEE64 system now in place
on the LYCCA chamber with a PB-5 pulser going
into the adapter cards 
  
  87   Thu Apr 30 16:20:54 2015 JA, LHB, TD, AE, CG & VPFriday 1 May 2015      diode link threshold 0xca -> 0xb6
                           0x11 -> 0x2c 
  
  86   Thu Apr 30 15:28:25 2015 Patrick Coleman-SmithHigh Energy Spectra from LYCCA with pulserI have an eight FEE64 system now in place
on the LYCCA chamber with a PB-5 pulser going
into the adapter cards test input. The test
 LYCCA_High_Energy.png 
  85   Thu Apr 30 03:00:48 2015 TDDegrader changes
From 20.00 29.4.15
  
  84   Thu Apr 30 02:11:19 2015 TDExample waveforms with heavy-ion beam
1 - nnaida1 DSSSD#3 p+n (pulser?)
2 - nnaida1 DSSSD#3 p+n heavy ion
 7x 
  83   Thu Apr 30 01:06:44 2015 JA, LHB, TD, AE, CG & VPThursday 30 April 2015Overnight
      Degrader OUT
      DAQ ran OK - data file R22
 16x 
  82   Wed Apr 29 18:12:02 2015 AEonline analysis codeA first online analysis code is running now
in Desktop 4 aidas1
 8x 
  81   Wed Apr 29 11:34:09 2015 Patrick Coleman-SmithFast Trigger timings against Pulser Input and LEC/MEC Fast Comparator threshold settingI have tried the latest version ( 26 )
of the FEE64 code and carried out some measurements
of the Fast Trigger delay from the Pulser
  
  80   Wed Apr 29 11:00:29 2015 TDWednesday 29 April 2015 - R20 screenshots1230: Attachments 

19.00 Screenshots taken during R20
 10x 
  79   Wed Apr 29 10:01:27 2015 Patrick Coleman-SmithFast Trigger output fault in FEE64 FPGA logic The Fast Trigger output of the FEE64
is formed from the OR of the four OR16 signals
( one from each of the ASICs.
  