  848   Mon Jun 17 02:31:53 2019 CA, TD, OHMonday 17 June 08.00-16.0010.41 DAQ continues OK file RIBF147/R2_352

      100Sn setting, no degrader
 21x 
  849   Mon Jun 17 03:01:04 2019 CA, TD, OHPID plot and selected isotope implantation ratesPID plot produced from 2 hours of merged data
- attachment 1
 2hrPID.pdf 
  850   Mon Jun 17 08:03:37 2019 CA, CB, TD, OHMon Jun 17 16:00-24:0016:04  DAQ continues running OK
       All system-wide checks OK except nnaida7
ADC calibration fails
 19x 
  851   Mon Jun 17 16:01:27 2019 CB, CG, OH, TDTuesday 18 June 00:00 - 16:0000:00 New day. The DAQ continues OK

      Beam setting 2 for enhanced yield of
 34x 
  852   Tue Jun 18 08:03:20 2019 DKTuesday 18 June 16:00 - 24:00Shift change

16:00 
 15x 
  853   Tue Jun 18 16:14:03 2019 CAWednesday 19 June 00.00 - 08.00 shift00.00 Shift Change

      DAQ continues ok 
 32x 
  854   Tue Jun 18 23:58:46 2019 CBWed Jun 19 8:00-16:00 08:00 Shift change
      No change in settings
 19x 
  855   Wed Jun 19 08:30:36 2019 CGWed Jun 19 16.00 - end of run16.10 DAQ continues as before.
      Merger rate ~700k items/s and ~5.3Kb/s
      Individual FEE rates remain roughly
 AIDAimplants.png 
  856   Thu Jun 20 02:37:55 2019 CA, CB, TD, CG, DKThursday 20 June10.37 Post - beam, AIDA & DTAS run only
      DTAS stop run 164
      AIDA file R2_1012
 23x 
  857   Thu Jun 20 07:35:46 2019 CA, TDBias & leakage current spreadsheet
https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=1560332343
 AIDA_leakage_current(1).xlsx 
  858   Thu Jun 20 07:42:54 2019 CA, TDAIDA shutdown checkliststop the daq

pause merger
  
  859   Fri Jun 21 01:08:35 2019 CA, CBFriday 21 June09.08 all system wide checks okay *except*
naida7 fails adc calibration
      mismatch between sync pulses received
 21junSync.png20june_2319_temps.png21jun_bias.png 
  860   Fri Jun 21 09:57:15 2019 CGB2F network cablesAIDA network cables in B2F disconnected, looped
and cable tied to hand rail, out of the way.
  
  861   Thu Nov 14 07:57:46 2019 TDAIDA moved from in-beam position at F11
To make room for the installation of an MR-TOF
device at F11, AIDA and DTAS have been removed
  
  862   Tue Feb 9 11:44:21 2021 OH, TD, CA, LS9th Feb GSI Dry runDatabase file - 2019Dec19-16.19.51
Current threshold at 0x64
 16x 
  863   Mon Apr 19 15:10:55 2021 OH TDLess HEC events than expected in DSSD3we are noticing we appear to see less implant
events in detector 3 than we expect. This
was first noticed in the xy spectra of the
 Capture.PNG 
  864   Thu Feb 23 16:15:31 2023 TD PJCSBench test of AIDA FEE64 mezzanines
Attachments 2 & 7 AIDA FEE64 mezzanine with
                  1) adaptor PCB connected
 7x 
  865   Wed Mar 1 16:42:06 2023 Further results from Mezzanine bench testsPJCSCarried out some further work on failed
mezzanine modules.

Inspected them externally and removed
 mezz_cap_gone_resized.jpgmezz_resistors_resized.jpg 
  867   Wed Apr 12 12:32:13 2023 PJCSASIC power short problemI have taken videos with an Infrared camera
of the power being supplied to one isolated
ASIC on a mezzanine.
 Mezzanine_Under_test_Wider_view_resized.jpgMezzanine_Under_test_resized.jpg 
  868   Thu Jul 6 10:20:25 2023 TDUnable to start Rly16 server
Unable to start Rly16 server - see attachment