Tue Apr 21 09:39:00 2015, AE, LISE estimates for implantation setup [updated] 
|
[UPDATED 22/4: initial LISE file had incorrect thickness for MACi plastic]
Calculations for Al degrader thickness required to implant ions in AIDA DSSD stack.
|
Tue Apr 28 05:59:48 2015, AE, "beta" trigger from MACB Trigger outputs 6x
|
We've constructed a beta trigger with the signals from the p-side of the three DSSDs (OR of all fast
discriminator channels of each FEE).
|
Wed Apr 29 18:12:02 2015, AE, online analysis code 8x
|
A first online analysis code is running now in Desktop 4 aidas1
The source code and executable are in
|
Sat May 2 19:17:25 2015, AE, time-stamp for event reconstruction    
|
Some first analysis of building events to look for implants and decays
Using both DISC and slow comparator values for time-stamp (whatever is available). Clearly there are some ADC
|
Sat May 2 19:20:59 2015, AE, run R51 online spectra    
|
Online spectra to monitor condition during run R51.
Position and energy spectra indicate implantation in 2nd DSSD.
|
Mon May 4 12:10:35 2015, AE, online monitor and data transfer  
|
Online monitor program for AIDA is in /homes/npg/AIDAonline
The program is now running in Desktop#4 of aidas1, with mode to forward data to BRIKEN PC enabled (if more than one instance forwarding data are |
Fri Jul 17 17:28:35 2015, AE, [Data Analysis] Correlation Scaler 100Kr data (go4_30**.root)    
|
Plots of corr-scaler vs event number in Root files for 100Kr(?) setting: go4_40XX.root.
Same script, and plot description, as in the ELOG entry for go4_30XX.root files: https://elog.ph.ed.ac.uk/AIDA/112
|
Wed May 11 05:49:51 2016, AE, VHDL update to FEE_GF_Feb16_16  
|
The firmware of all FEEs was updated to the version in FEE_GF_Feb16_16.bin (https://elog.ph.ed.ac.uk/AIDA/215).
This provides a 25 MHz clock output from MACB, plus a manual reset request signal.
|
Mon May 30 18:29:54 2016, AE, Co/Bi source run (R7)    
|
Some comments regarding source run for beta-gamma calibration, to complement EURICA16 elog entry:
http://ribf-exp.riken.jp/elog/EURICA+U-campaign+2016/
|
Mon May 30 22:57:58 2016, AE, Co/Bi source run (R7)
|
> Some comments regarding source run for beta-gamma calibration, to complement EURICA16 elog entry:
> http://ribf-exp.riken.jp/elog/EURICA+U-campaign+2016/
>
|
Sat Nov 26 12:18:25 2016, AE, Saturday 26 November, Part III 6x
|
19:30 Power cycled of AIDA reuired after Ge filling
20:04 Started new run: R10_0
|
Sun Jun 24 09:08:03 2018, 3OH, TD, June 2018 New Stack Configuration 
|
Stack has been changed in configuration from a 6 DSSD stack to 8 DSSD stack.
What was detectors 1-6 are now 3-8 with 2 new detectors added to the front.
|
Mon Jun 6 15:06:22 2016, 1TD, ML & YS, R1119 
|
R1118 ended OK
R1119 DAQ GO, check AIDA SYNCs OK, toggle merge input etc
|
Tue Oct 24 10:54:14 2023, at 19:14NH, CC, AIDA test   
|
Started AIDA at 11:54am, writing to disk: file BG18OCT2/R5, stopped at 19:14
pict1: HV supply
|
Mon Mar 9 16:45:35 2015, TD, Julabo FL11006 Recirculating Chiller: connection to 3ph ac mains 7x
|
3ph 100VAC/50Hz to Julabo FL11006 3ph 230VAC/50Hz via local transformer |
Mon May 4 01:27:56 2015, JA, TD, AE, CG & JLT, Monday 4 May 2015 16x
|
09.18 SN changed degrader to 5.7mm Al (4mm + all variable degraders + additional 1mm)
|
Thu Apr 30 01:06:44 2015, JA, LHB, TD, AE, CG & VP, Thursday 30 April 2015 16x
|
Overnight
Degrader OUT
DAQ ran OK - data file R22
|
Thu Mar 30 16:12:21 2017, DK, OH, CG, Friday, March 31 run status 14x
|
00:11 BigRIPS has started a new run at 00:10:42 run 0165.
AIDA subrun R16_357 was about halfway (~1 GB) at 00:11.
BRIKEN run 21 ( so-called 170331_0012_Mg40 )
|
Wed Oct 5 07:29:29 2016, CG & TD, Wednesday 5 October (inc AIDA+BRIKEN photos) 11x
|
14.30 Adjusted and checked insertion of AIDA snout into BRIKEN (CH2)n moderator.
up-down AIDA snout appears centred (@ (CH2)n centre) and tracks into (CH2)n moderator with no
significant vertical movement
|
Fri May 13 06:18:53 2016, AE, VP, BM, Friday May 13th 9x
|
11 am: Changed configuration of power source for AIDA PSU (see paper logbook). Now both cables with power for
USB relay are connected to the 'C' unit of the F11 power supply. They use different socket pads, and share them
with power cables for raspberry pi and NIM crates. Situation intermediate to what we have on Tuesday.
|