AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 46 of 46  ELOG logo
Entry  Tue Apr 21 09:39:00 2015, AE, LISE estimates for implantation setup [updated] LISE_estimates_84Zn.docxLISE_estimates_94Se.docx
[UPDATED 22/4: initial LISE file had incorrect thickness for MACi plastic]

Calculations for Al degrader thickness required to implant ions in AIDA DSSD stack.
Entry  Tue Apr 28 05:59:48 2015, AE, "beta" trigger from MACB Trigger outputs 6x
We've constructed a beta trigger with the signals from the p-side of the three DSSDs (OR of all fast
discriminator channels of each FEE).
Entry  Wed Apr 29 18:12:02 2015, AE, online analysis code 8x
A first online analysis code is running now in Desktop 4 aidas1

The source code and executable are in 
Entry  Sat May 2 19:17:25 2015, AE, time-stamp for event reconstruction time_stamp_dist_disc.pngevt_time_stamp_disc_R51.pngXY_implant_disc_R51.pngevt_time_stamp_slowcomp_R51.pngXY_implant_slowcomp_R51.png
Some first analysis of building events to look for implants and decays

Using both DISC and slow comparator values for time-stamp (whatever is available). Clearly there are some ADC
Entry  Sat May 2 19:20:59 2015, AE, run R51 online spectra ADClow_vs_Ch_R51online.pngADChigh_vs_Ch_R51online.pngX_implant_R51online.pngE_implant_R51online.pngTraking_implant_R51online.png
Online spectra to monitor condition during run R51.

Position and energy spectra indicate implantation in 2nd DSSD. 
Entry  Mon May 4 12:10:35 2015, AE, online monitor and data transfer R53_implant_E.pngR53_implant_XY.pngR53_decat_E.png
Online monitor program for AIDA is in  /homes/npg/AIDAonline

The program is now running in Desktop#4 of aidas1, with mode to forward data to BRIKEN PC enabled (if more than one instance forwarding data are
Entry  Fri Jul 17 17:28:35 2015, AE, [Data Analysis] Correlation Scaler 100Kr data (go4_30**.root)  scaler_r4001_4010.pngscaler_r4011_4020.pngscaler_r4021_4030.pngscaler_r4031_4040.pngscaler_r4041_4049.png
Plots of corr-scaler vs event number in Root files for 100Kr(?) setting: go4_40XX.root.

Same script, and plot description, as in the ELOG entry for go4_30XX.root files: https://elog.ph.ed.ac.uk/AIDA/112
Entry  Wed May 11 05:49:51 2016, AE, VHDL update to FEE_GF_Feb16_16 FEEprogram1.pngFEEprogram2.pngFEEprogram3.png
The firmware of all FEEs was updated to the version in FEE_GF_Feb16_16.bin (https://elog.ph.ed.ac.uk/AIDA/215).
This provides a 25 MHz clock output from MACB, plus a manual reset request signal.
Entry  Mon May 30 18:29:54 2016, AE, Co/Bi source run (R7) R7_1.pngR7_2.pngR7_3.pngR7_5.pngR7_6.png
Some comments regarding source run for beta-gamma calibration, to complement EURICA16 elog entry:
http://ribf-exp.riken.jp/elog/EURICA+U-campaign+2016/
    Reply  Mon May 30 22:57:58 2016, AE, Co/Bi source run (R7) 
> Some comments regarding source run for beta-gamma calibration, to complement EURICA16 elog entry:
> http://ribf-exp.riken.jp/elog/EURICA+U-campaign+2016/
Entry  Sat Nov 26 12:18:25 2016, AE, Saturday 26 November, Part III 6x
19:30 Power cycled of AIDA reuired after Ge filling

20:04 Started new run: R10_0
Entry  Sun Jun 24 09:08:03 2018, 3OH, TD, June 2018 New Stack Configuration IMG_20180623_104349.jpgIMG_20180623_113315.jpg
Stack has been changed in configuration from a 6 DSSD stack to 8 DSSD stack.
What was detectors 1-6 are now 3-8 with 2 new detectors added to the front.
Entry  Mon Jun 6 15:06:22 2016, 1TD, ML & YS, R1119 41.png42.png
R1118 ended OK

R1119 DAQ GO, check AIDA SYNCs OK, toggle merge input etc 
Entry  Tue Oct 24 10:54:14 2023, at 19:14NH, CC, AIDA test Screenshot_from_2023-10-24_11-54-48.pngScreenshot_from_2023-10-24_11-55-08.pngScreenshot_from_2023-10-24_11-55-46.pngScreenshot_from_2023-10-24_11-55-33.png
Started AIDA at 11:54am, writing to disk: file BG18OCT2/R5, stopped at 19:14

pict1: HV supply
Entry  Mon Mar 9 16:45:35 2015, TD, Julabo FL11006 Recirculating Chiller: connection to 3ph ac mains  7x

3ph 100VAC/50Hz to Julabo FL11006 3ph 230VAC/50Hz via local transformer
Entry  Mon May 4 01:27:56 2015, JA, TD, AE, CG & JLT, Monday 4 May 2015 16x

09.18 SN changed degrader to 5.7mm Al (4mm + all variable degraders + additional 1mm)
Entry  Thu Apr 30 01:06:44 2015, JA, LHB, TD, AE, CG & VP, Thursday 30 April 2015 16x
Overnight
      Degrader OUT
      DAQ ran OK - data file R22
Entry  Thu Mar 30 16:12:21 2017, DK, OH, CG, Friday, March 31 run status 14x
00:11 BigRIPS has started a new run at 00:10:42 run 0165.
      AIDA subrun R16_357 was about halfway (~1 GB) at 00:11.
      BRIKEN run 21 ( so-called 170331_0012_Mg40 )
Entry  Wed Oct 5 07:29:29 2016, CG & TD, Wednesday 5 October (inc AIDA+BRIKEN photos) 11x
14.30 Adjusted and checked insertion of AIDA snout into BRIKEN (CH2)n moderator.
      up-down    AIDA snout appears centred (@ (CH2)n centre) and tracks into (CH2)n moderator with no
significant vertical movement
Entry  Fri May 13 06:18:53 2016, AE, VP, BM, Friday May 13th 9x
11 am: Changed configuration of power source for AIDA PSU (see paper logbook). Now both cables with power for
USB relay are connected to the 'C' unit of the F11 power supply. They use different socket pads, and share them
with power cables for raspberry pi and NIM crates. Situation intermediate to what we have on Tuesday.
ELOG V3.1.3-7933898