AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 15 of 21  ELOG logo
ID Date Author Subject Text Attachments
  134   Tue Nov 8 02:49:19 2016 PV, LiuSpecification of the dE silicon detectorThe specification and picture of the dE silicon
detector is shown in the attached photos.
The detector  has an effective area of 134
 spec_de_1.jpgspec_de_2.jpgIMG_1340.JPG 
  133   Mon Nov 7 14:17:23 2016 BRIKEN collaborationPicture of shift schedule   IMG_20161107_183105.jpg 
  131   Mon Nov 7 13:44:26 2016 Alvaro, Ale, Jorge, JoseRunning Gasific and run protocolPreliminary  GasificShort.pdf 
  130   Mon Nov 7 13:15:07 2016 Alvaro, Ale, Jorge, JoseBackgroundBackground measurement overnight.

Start: 23:27 (07/11/2016)
 161108_0751_Overnight_BRIKEN.pdf 
  129   Mon Nov 7 13:11:42 2016 Alvaro, Ale, Jose, JorgeNew directory and Config fileFor second part of Takechi's run:

Directory: /data/1611Commissioning/161107Parasitic
 161107Conf_BrikenFull.xlsx 
  128   Mon Nov 7 09:05:09 2016 IrisDraft for Run sheetAttached is the draft for the paper run sheet
(version 2). If something is missing, please
let me know.
 Run_sheet-Nov16-v2.pdfRun_sheet-Nov16-v2.docx 
  127   Mon Nov 7 09:04:10 2016 Phong,Liu,Ale,JoseNew AIDA plastic calibrationTo have a range of about 200 MeV

Ortec671 Gain from x20 to x5 (fine gain :
 161107_1800_AIDAplasticCalib.pdf 
  126   Mon Nov 7 06:55:01 2016 NTB, SGHPGe Fill line to D4 replacedHPGe fill line to D4 replaced only small
leak (overflow) once Ge is full.

Solenoid was also wrapped to no
  
  125   Mon Nov 7 05:36:20 2016 Alenew calibration for F11new calibration for F11

Using a value of 70 MeV energy loss and the
  
  124   Mon Nov 7 04:49:57 2016 Tain, AleAIDA plastic (veto) and Si de calibrationAIDA plastic (veto) and Si de calibration

For the calibration the Compton edge of the
  
  123   Mon Nov 7 04:37:33 2016 Phong,Liu,...Si de and AIDA plastic calibration60Co source placed close to the detectors:

ROOT files: 
  
  122   Mon Nov 7 02:39:55 2016 AlePhoto of the white board with the details on the cards and preamps at B1FPhoto of the white board with the details
on the cards and preamps at B1F
 New_Doc_160_2.pdf 
  121   Sun Nov 6 23:35:42 2016 Tain et al.Overnight measurement: Ca isotopesFirst 50,49,48Ca beam and then 47,46,45Ca
beam
C-6mm IN and OUT
 161107_0833_Overnight_Rates.pdf161107_0833_Overnight_F11.pdf161107_0833_Overnight_CorrBRF11R.pdf 
  120   Sun Nov 6 07:16:59 2016 Tain et al.58Ni on F7 CH2 F11 empty/C6mmCH2 target at F7 in
Start with Empty at F11
Change to C-6mm at F11 later
 161106_1725_58Ni_F7CH2_Rates.pdf161106_1725_58Ni_F7CH2_RatesRings.pdf 
  119   Sun Nov 6 06:39:23 2016 Tain et al.58Ni on F11 C-6mm58Ni in F11 C-6mm (later empty)
F7 CH2 target out (F5 CH2 target in)
Thresholds in V_PL_* lowered from 20MeV to
 161106_1609_58Ni_F11_empty_Rates.pdf 
  118   Sun Nov 6 06:27:49 2016 Tain et al.58Ni on F11 C-6mm inNew calibration in V_PL_T and V_PL_R (Energyx1/2)

Start: 15:15
  
  117   Sun Nov 6 03:12:55 2016 Alvaro,JorgeOvernight measurementMeasurement during beam production
and measurement with F7 CH2 out, 
F11 C-tar in/out, F7 CH2 in C-target out/in
  
  116   Sat Nov 5 17:07:27 2016 Tain, Alvaro, Jorge62Ni in F762Ni beam in F7 ON CH2 target

Strat with C target ladder in F11 in empty
 161106_0232_62Ni_F7_empty_Rates.pdf161106_0232_62Ni_F7_empty_F11.pdf161106_0232_62Ni_F7_empty_CorrBRF11R.pdf161106_0232_62Ni_F7_empty_VPL.pdf161106_0232_62Ni_F7_empty_CorrBRVPL.pdf 
  115   Sat Nov 5 16:27:13 2016 Tain,Ale,Jorge,Alvaro62Ni beam in F11 empty targetEmpty position of the target ladder at F11
(hole is smaller than beam size)
  
  114   Sat Nov 5 15:07:11 2016 Tain, Ale62Ni beam on F11 C-6mm62Ni on 6 mm C target between MUSICs

The background before was 0.36 neutrons/s
 161106_0117_62Ni_F11_C6mm_Rates.pdf161106_0117_62Ni_F11_C6mm_F11.pdf161106_0117_62Ni_F11_C6mm_CorrBRF11R.pdf161106_0117_62Ni_F11_C6mm_VPL.pdf161106_0117_62Ni_F11_C6mm_CorrBRVPL.pdf 
ELOG V3.1.4-unknown