AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 14 of 21  ELOG logo
  ID Date Author Subjectdown Text Attachments
  30   Sat Jul 9 20:44:31 2016 J.L. TainBRIKEN neutron detectorSTART
Assembly and commissioning of BRIKEN neutron
detector 
  
  2   Fri Oct 31 11:36:57 2014 Alfredo EstradeBRIKEN elog: take 2A elog for the setup of the
BRIKEN detector is now operational at 
  
  1   Fri Oct 31 09:47:59 2014 Alfredo EstradeBRIKEN elog: Hello world!A elog for the setup of the BRIKEN detector
is now operational at https://elog.ph.ed.ac.uk/BRIKEN/
 
We have setup
  
  79   Wed Oct 12 11:30:53 2016 Ariel Tarifeno, Alvaro Toloza, JL Tain, J. Agramunt, et alBRIKEN Z scanScanning of the BRIKEN detector with the 252Cf
source 
along the longitudinal axis (Z axis)
  
  7   Sat Apr 25 08:25:42 2015 G. Kiss, J. AgramuntBRIKEN Test setupAltogether 16  tubes are mounted for
the parasitic detector test (see the attached
photos):
 P1120020.JPGP1120023.JPGJap1Cf.pdfUS1Cf.pdf 
  150   Fri Nov 11 08:07:18 2016 BCR SG NTBBRIKEN Hit VisualizationThese are the files used to create and
visualize the hit patterns of the BRIKEN
detector.
 HybridBRIKENPhysicalHistogram.cppHybridBRIKENPhysicalHistogram.hppHybridBRIKEN_Tube_Info_1.txt 
  314   Sat May 27 10:36:20 2017 JA,AT,JLTBRIKEN DACQManuals for BRIKEN DACQ: 
GasificShort.pdf including "Run protocol"
and Gasific70Manual.pdf (long)
 Gasific70Manual.pdfGasificShort.pdf 
  310   Fri May 26 14:27:08 2017 AIM, ATBRIKEN Configuration FileNew configuration file of BRIKEN
Changes of 26th-May-2017
Previous config file 24th-May-2017
 170526_Conf_BrikenFull.xlsx 
  390   Thu Oct 25 09:07:00 2018 ATS & JLTBRIKEN Calibration checkWe put the 252Cf source and check the aligment
of 3He tubes gains:
  
  107   Thu Nov 3 23:28:01 2016 A. TolosaBRIKEN Bkg + 152EuMeasurement over night with a 152Eu source
inside
 161104_0826_152Eu.png161104_0826_152Eu_CLOVERS.png 
  90   Sun Oct 16 12:58:34 2016 AllBRIKENInstallation of BRIKEN PE shielding for beam
related neutrons
 Shielding-BRIKEN-AIDA.jpgShielding-BRIKEN.jpgShieldingPlates.jpg 
  206   Tue Mar 28 17:02:19 2017 DKApplying BiasesToday, Gabor and I discussed with Nathan from
ORNL about the biasing system used for Ge,
3He, Plastic, and others.  Phong is also
  
  113   Sat Nov 5 03:36:34 2016 Tain et alAncillary detectorsSome info on ancillary detector signals

Plastic veto detectors (Top and Botomm):
 VetoBottomPlastic.JPGVetoTopPlastic.JPGAIDAPlasticShaped.JPG 
  333   Fri Oct 20 08:27:05 2017 BC RascoAnalysis SlidesHere are the ORNL/UTK BRIKEN analysis slides
presented by BC Rasco on 2017/10/20.

 
 PreliminaryPnCalcsWithBkgCoin_BRIKENGroup.pdf 
  22   Tue May 5 05:17:36 2015 J.L. Tain, J. Agramunt, G. KissAmbient background measurement

Failure of
a quadrupole triplet at BigRIPS (some time
after earthquake)

We take the chance of
  
  23   Tue May 5 05:29:26 2015 J.L. Tain, J. Agramunt, G. KissAmbient background measurementBeam still down. New background measurement
with new RIKEN tube below the MUSIC chamber
  
  401   Tue Oct 30 01:01:42 2018 JLT, AAAdjustment of 3He thresholdsBackground with BigRIPS+ZD already working
No pulser
 181030_Conf_BrikenFull_LowThrAdj_masterCLK.xlsxScreenshot_from_2018-10-30_16-22-32.png 
  315   Sat May 27 11:19:57 2017 AIM, ATAIDA+BRIKEN backgroundBackground measurement AIDA+BRIKEN
AIDA is inside BRIKEN
  
  18   Mon May 4 04:14:18 2015 J.Agramunt J.L.Tain K.GaborAIDA trigger plugged in Mod2 Ch12AIDA trigger plugged in Mod2 Ch12   
  124   Mon Nov 7 04:49:57 2016 Tain, AleAIDA plastic (veto) and Si de calibrationAIDA plastic (veto) and Si de calibration

For the calibration the Compton edge of the
  
ELOG V3.1.4-unknown