ID |
Date |
Author |
Subject |
Text |
 |
30
|
Sat Jul 9 20:44:31 2016 |
J.L. Tain | BRIKEN neutron detector | START
Assembly and commissioning of BRIKEN neutron
detector
|
|
2
|
Fri Oct 31 11:36:57 2014 |
Alfredo Estrade | BRIKEN elog: take 2 | A elog for the setup of the
BRIKEN detector is now operational at |
|
1
|
Fri Oct 31 09:47:59 2014 |
Alfredo Estrade | BRIKEN elog: Hello world! | A elog for the setup of the BRIKEN detector
is now operational at https://elog.ph.ed.ac.uk/BRIKEN/
We have setup |
|
79
|
Wed Oct 12 11:30:53 2016 |
Ariel Tarifeno, Alvaro Toloza, JL Tain, J. Agramunt, et al | BRIKEN Z scan | Scanning of the BRIKEN detector with the 252Cf
source
along the longitudinal axis (Z axis)
|
|
7
|
Sat Apr 25 08:25:42 2015 |
G. Kiss, J. Agramunt | BRIKEN Test setup | Altogether 16 tubes are mounted for
the parasitic detector test (see the attached
photos): |
   |
150
|
Fri Nov 11 08:07:18 2016 |
BCR SG NTB | BRIKEN Hit Visualization | These are the files used to create and
visualize the hit patterns of the BRIKEN
detector. |
  |
314
|
Sat May 27 10:36:20 2017 |
JA,AT,JLT | BRIKEN DACQ | Manuals for BRIKEN DACQ:
GasificShort.pdf including "Run protocol"
and Gasific70Manual.pdf (long) |
 |
310
|
Fri May 26 14:27:08 2017 |
AIM, AT | BRIKEN Configuration File | New configuration file of BRIKEN
Changes of 26th-May-2017
Previous config file 24th-May-2017
|
|
390
|
Thu Oct 25 09:07:00 2018 |
ATS & JLT | BRIKEN Calibration check | We put the 252Cf source and check the aligment
of 3He tubes gains:
|
|
107
|
Thu Nov 3 23:28:01 2016 |
A. Tolosa | BRIKEN Bkg + 152Eu | Measurement over night with a 152Eu source
inside
|
 |
90
|
Sun Oct 16 12:58:34 2016 |
All | BRIKEN | Installation of BRIKEN PE shielding for beam
related neutrons
|
  |
206
|
Tue Mar 28 17:02:19 2017 |
DK | Applying Biases | Today, Gabor and I discussed with Nathan from
ORNL about the biasing system used for Ge,
3He, Plastic, and others. Phong is also |
|
113
|
Sat Nov 5 03:36:34 2016 |
Tain et al | Ancillary detectors | Some info on ancillary detector signals
Plastic veto detectors (Top and Botomm):
|
  |
333
|
Fri Oct 20 08:27:05 2017 |
BC Rasco | Analysis Slides | Here are the ORNL/UTK BRIKEN analysis slides
presented by BC Rasco on 2017/10/20.
|
|
22
|
Tue May 5 05:17:36 2015 |
J.L. Tain, J. Agramunt, G. Kiss | Ambient background measurement |
Failure of
a quadrupole triplet at BigRIPS (some time
after earthquake)
We take the chance of |
|
23
|
Tue May 5 05:29:26 2015 |
J.L. Tain, J. Agramunt, G. Kiss | Ambient background measurement | Beam still down. New background measurement
with new RIKEN tube below the MUSIC chamber
|
|
401
|
Tue Oct 30 01:01:42 2018 |
JLT, AA | Adjustment of 3He thresholds | Background with BigRIPS+ZD already working
No pulser
|
 |
315
|
Sat May 27 11:19:57 2017 |
AIM, AT | AIDA+BRIKEN background | Background measurement AIDA+BRIKEN
AIDA is inside BRIKEN
|
|
18
|
Mon May 4 04:14:18 2015 |
J.Agramunt J.L.Tain K.Gabor | AIDA trigger plugged in Mod2 Ch12 | AIDA trigger plugged in Mod2 Ch12 |
|
124
|
Mon Nov 7 04:49:57 2016 |
Tain, Ale | AIDA plastic (veto) and Si de calibration | AIDA plastic (veto) and Si de calibration
For the calibration the Compton edge of the |
|