ID |
Date |
Author |
Subject |
Text |
 |
354
|
Tue Oct 31 06:57:53 2017 |
OH, TD | AIDA Oct17 Beam Test Analysis | PDF file attached with the preliminary analysis
of the October 2017 AIDA in beam test. |
|
14
|
Sun May 3 10:10:13 2015 |
J.L. Tain, J. Agramunt, G. Kiss | 94Se setting measurement | 94Se setting:
File: 150503_1500_1554_94Se.root
Rate per tube (n/s): U=0.966, D=0.263, US=0.538
|
|
25
|
Wed May 6 05:10:14 2015 |
J.L. Tain, J. Agramunt, G. Kiss | 94Se setting measurement | After the long shutdown the beam is back at
00:30 (06/05)
Intensity is slightly lower 26pnA and somewhat |
|
143
|
Tue Nov 8 14:28:54 2016 |
Many | 717273Ni run | F7 CH2 F11 C-6mm
Total degrader thickness 6mm
|
|
144
|
Tue Nov 8 15:10:24 2016 |
Many | 717273Ni Run | F7 OUT F11 C-6mm
Start: 00:09
|
|
141
|
Tue Nov 8 12:51:08 2016 |
Many | 717273Ni | After removing the lead wall.
Start: 21:45
|
|
140
|
Tue Nov 8 12:30:33 2016 |
Tain, Ale (who are not on shift) | 71,72,73Ni run | 71,72,73Ni run
We started at approximately 21:00, only online, |
|
142
|
Tue Nov 8 13:49:58 2016 |
Many | 71,72,73Ni | F7 CH2 F11 Empty
We remove the 8mm Al plate from inside BRIKEN |
|
116
|
Sat Nov 5 17:07:27 2016 |
Tain, Alvaro, Jorge | 62Ni in F7 | 62Ni beam in F7 ON CH2 target
Strat with C target ladder in F11 in empty |
    |
114
|
Sat Nov 5 15:07:11 2016 |
Tain, Ale | 62Ni beam on F11 C-6mm | 62Ni on 6 mm C target between MUSICs
The background before was 0.36 neutrons/s
|
    |
115
|
Sat Nov 5 16:27:13 2016 |
Tain,Ale,Jorge,Alvaro | 62Ni beam in F11 empty target | Empty position of the target ladder at F11
(hole is smaller than beam size)
|
|
120
|
Sun Nov 6 07:16:59 2016 |
Tain et al. | 58Ni on F7 CH2 F11 empty/C6mm | CH2 target at F7 in
Start with Empty at F11
Change to C-6mm at F11 later
|
 |
118
|
Sun Nov 6 06:27:49 2016 |
Tain et al. | 58Ni on F11 C-6mm in | New calibration in V_PL_T and V_PL_R (Energyx1/2)
Start: 15:15
|
|
119
|
Sun Nov 6 06:39:23 2016 |
Tain et al. | 58Ni on F11 C-6mm | 58Ni in F11 C-6mm (later empty)
F7 CH2 target out (F5 CH2 target in)
Thresholds in V_PL_* lowered from 20MeV to |
|
137
|
Tue Nov 8 08:31:52 2016 |
Tain et al | 424344Ca run | Sequence of settings:
1) No target at F7 and Empty target at F11
(up to t=1E6ms)
|
|
170
|
Sat Nov 26 00:15:12 2016 |
AT | 41Al run0 | 08:15 BigRips tunning for centering 41Al.
Adqusition started.
Degrader: 5mm Pb located between MUSIC chambers
|
|
174
|
Sat Nov 26 16:21:08 2016 |
Briken collaboration | 41Al run 2-15 | 13:08 Beam is still OFF. Background acquisition
is started.
Degrader:
|
|
172
|
Sat Nov 26 06:37:37 2016 |
AT | 41Al run 1 | 11:07 New acquisition is started for tungsten
degraders
1mm W + 1mm Al
|
|
184
|
Sun Nov 27 11:23:54 2016 |
PV, GK, AE, TD | 40Mg. Run 35 | ======= START =======
Date 2016/11/27
Start time : 18:59
|
|
183
|
Sun Nov 27 11:15:42 2016 |
PV, GK, AE, TD | 40Mg. Run 34 | ======= START =======
Date 2016/11/27
Start time : 17:29
|
|