  354   Tue Oct 31 06:57:53 2017 OH, TDAIDA Oct17 Beam Test AnalysisPDF file attached with the preliminary analysis
of the October 2017 AIDA in beam test.
 AIDA_Test_Results.pdf 
  14   Sun May 3 10:10:13 2015 J.L. Tain, J. Agramunt, G. Kiss94Se setting measurement94Se setting:
File: 150503_1500_1554_94Se.root
Rate per tube (n/s): U=0.966, D=0.263, US=0.538
  
  25   Wed May 6 05:10:14 2015 J.L. Tain, J. Agramunt, G. Kiss94Se setting measurementAfter the long shutdown the beam is back at
00:30 (06/05)
Intensity is slightly lower 26pnA and somewhat
  
  143   Tue Nov 8 14:28:54 2016 Many717273Ni runF7 CH2 F11 C-6mm
Total degrader thickness 6mm
  
  144   Tue Nov 8 15:10:24 2016 Many717273Ni RunF7 OUT F11 C-6mm

Start: 00:09
  
  141   Tue Nov 8 12:51:08 2016 Many717273Ni After removing the lead wall.

Start: 21:45
  
  140   Tue Nov 8 12:30:33 2016 Tain, Ale (who are not on shift)71,72,73Ni run71,72,73Ni  run

We started at approximately 21:00, only online,
  
  142   Tue Nov 8 13:49:58 2016 Many71,72,73NiF7 CH2 F11 Empty

We remove the 8mm Al plate from inside BRIKEN
  
  116   Sat Nov 5 17:07:27 2016 Tain, Alvaro, Jorge62Ni in F762Ni beam in F7 ON CH2 target

Strat with C target ladder in F11 in empty
 161106_0232_62Ni_F7_empty_Rates.pdf161106_0232_62Ni_F7_empty_F11.pdf161106_0232_62Ni_F7_empty_CorrBRF11R.pdf161106_0232_62Ni_F7_empty_VPL.pdf161106_0232_62Ni_F7_empty_CorrBRVPL.pdf 
  114   Sat Nov 5 15:07:11 2016 Tain, Ale62Ni beam on F11 C-6mm62Ni on 6 mm C target between MUSICs

The background before was 0.36 neutrons/s
 161106_0117_62Ni_F11_C6mm_Rates.pdf161106_0117_62Ni_F11_C6mm_F11.pdf161106_0117_62Ni_F11_C6mm_CorrBRF11R.pdf161106_0117_62Ni_F11_C6mm_VPL.pdf161106_0117_62Ni_F11_C6mm_CorrBRVPL.pdf 
  115   Sat Nov 5 16:27:13 2016 Tain,Ale,Jorge,Alvaro62Ni beam in F11 empty targetEmpty position of the target ladder at F11
(hole is smaller than beam size)
  
  120   Sun Nov 6 07:16:59 2016 Tain et al.58Ni on F7 CH2 F11 empty/C6mmCH2 target at F7 in
Start with Empty at F11
Change to C-6mm at F11 later
 161106_1725_58Ni_F7CH2_Rates.pdf161106_1725_58Ni_F7CH2_RatesRings.pdf 
  118   Sun Nov 6 06:27:49 2016 Tain et al.58Ni on F11 C-6mm inNew calibration in V_PL_T and V_PL_R (Energyx1/2)

Start: 15:15
  
  119   Sun Nov 6 06:39:23 2016 Tain et al.58Ni on F11 C-6mm58Ni in F11 C-6mm (later empty)
F7 CH2 target out (F5 CH2 target in)
Thresholds in V_PL_* lowered from 20MeV to
 161106_1609_58Ni_F11_empty_Rates.pdf 
  137   Tue Nov 8 08:31:52 2016 Tain et al424344Ca runSequence of settings:
1) No target at F7 and Empty target at F11
(up to t=1E6ms)
  
  170   Sat Nov 26 00:15:12 2016 AT41Al run008:15    BigRips tunning for centering 41Al.
Adqusition started.
Degrader: 5mm Pb located between MUSIC chambers
 161126_0815_000_RateBRIKEN.svg 
  174   Sat Nov 26 16:21:08 2016 Briken collaboration41Al run 2-1513:08 Beam is still OFF. Background acquisition
is started.
Degrader:
  
  172   Sat Nov 26 06:37:37 2016 AT41Al run 111:07  New acquisition is started for tungsten
degraders 
1mm W + 1mm Al
  
  184   Sun Nov 27 11:23:54 2016 PV, GK, AE, TD 40Mg. Run 35 =======    START    =======
Date 2016/11/27
Start time : 18:59
  
  183   Sun Nov 27 11:15:42 2016 PV, GK, AE, TD 40Mg. Run 34=======    START    =======
Date 2016/11/27
Start time : 17:29
  