AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 16 of 21  ELOG logo
Entry  Wed Jun 14 06:22:21 2017, Ariel, Liu, Go, Nishinmura, HV is off 
To protect HPGe and 3He tubes from high intentsity primary beam, HV of these detector are off and the HPGe will be dismounted.
Entry  Wed Oct 12 11:30:53 2016, Ariel Tarifeno, Alvaro Toloza, JL Tain, J. Agramunt, et al, BRIKEN Z scan 
Scanning of the BRIKEN detector with the 252Cf source 
along the longitudinal axis (Z axis)
Entry  Sun Nov 6 03:12:55 2016, Alvaro,Jorge, Overnight measurement 
Measurement during beam production
and measurement with F7 CH2 out, 
F11 C-tar in/out, F7 CH2 in C-target out/in
Entry  Thu Nov 3 05:27:48 2016, Alvaro, Tain, Gabor, Ale, 152Eu  161103_1426_152Eu.root
Energy calibration for clovers, 152Eu

Entry  Mon Nov 7 13:11:42 2016, Alvaro, Ale, Jose, Jorge, New directory and Config file 161107Conf_BrikenFull.xlsx
For second part of Takechi's run:

Directory: /data/1611Commissioning/161107Parasitic
Entry  Mon Nov 7 13:15:07 2016, Alvaro, Ale, Jorge, Jose, Background 161108_0751_Overnight_BRIKEN.pdf
Background measurement overnight.

Start: 23:27 (07/11/2016)
Entry  Mon Nov 7 13:44:26 2016, Alvaro, Ale, Jorge, Jose, Running Gasific and run protocol GasificShort.pdf
Preliminary
Entry  Tue Oct 18 09:36:07 2016, Alvaro Tolosa, 2016-Oct, Logbook 16Oct_logbook.pdf
Paper logbook for October-2016
For correct visualization, 
please download it.
Entry  Tue Oct 18 09:41:43 2016, Alvaro Tolosa, 2016 - July, Logbook 16Jul_logbook.pdf
Paper logbook for July-2016
For correct visualization, 
please download it.
Entry  Tue Nov 1 09:27:02 2016, Alvaro Tolosa, CLOVER cloversEff.xlscloversEff.ods
Efficiency calibration

File "cloversEff.ods" and "cloversEff.xls" contains the experimental efficiency from different measurements
Entry  Thu Nov 3 04:46:24 2016, Alvaro Tolosa, 252Cf 161103_1319_252Cf.root
Check of BRIKEN calibration and thresholds

Source more or less at the center
Entry  Fri Oct 14 14:06:38 2016, All, First measurement of BRIKEN and AIDA 161014Conf_BrikenFull.xlsx
Friday, October 14, 2016 21:50
AIDA and BRIKEN-CLOVER run with a common clock.
Entry  Sun Oct 16 12:58:34 2016, All, BRIKEN Shielding-BRIKEN-AIDA.jpgShielding-BRIKEN.jpgShieldingPlates.jpg
Installation of BRIKEN PE shielding for beam
related neutrons
Entry  Sun Oct 16 13:30:43 2016, All, END Sashimi.jpg
... and sashimi (see photo)

The detectors (BRIKEN tubes, CLOVER, VETO detectors, AIDA) 
Entry  Thu Nov 3 04:40:02 2016, All, START 161103Conf_BrikenFull.xlsx
Start of commissioning preparation

Entry  Sun Apr 2 16:18:57 2017, All, END OF PARASITIC RUN 
 
Entry  Fri Oct 31 09:47:59 2014, Alfredo Estrade, BRIKEN elog: Hello world! 
A elog for the setup of the BRIKEN detector is now operational at https://elog.ph.ed.ac.uk/BRIKEN/
 
We have setup a list of emails that will receive automatic updates for each new entry to the elog:
 
C.
Domingo, G. Lorusso, T. Davinson, A. Estrade, K. Rykaczewski, J.L. Tain, C. Griffin, S. Nishimura, I. Dillman, F. Montes, J. Agramunt, G. Cortes, F. Calvino,
Entry  Fri Oct 31 11:36:57 2014, Alfredo Estrade, BRIKEN elog: take 2 
A elog for the setup of the BRIKEN detector is now operational at https://elog.ph.ed.ac.uk/BRIKEN/

We have setup a list of emails that will receive automatic updates for each new entry to the logbook: C. Domingo, G. Lorusso, T. Davinson, A. Estrade, K. Rykaczewski, J.L. Tain, C. Griffin,
Entry  Mon Nov 7 02:39:55 2016, Ale, Photo of the white board with the details on the cards and preamps at B1F New_Doc_160_2.pdf
Photo of the white board with the details on the cards and preamps at B1F
Entry  Mon Nov 7 05:36:20 2016, Ale, new calibration for F11 
new calibration for F11

Using a value of 70 MeV energy loss and the file 161107_0833_Overnight.root
ELOG V3.1.3-7933898