AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 16 of 21  ELOG logo
Entry  Wed Jun 14 06:22:21 2017, Ariel, Liu, Go, Nishinmura, HV is off 

To protect HPGe and 3He tubes from high intentsity primary beam, HV of these detector are off and the HPGe will be dismounted.

Entry  Wed Oct 12 11:30:53 2016, Ariel Tarifeno, Alvaro Toloza, JL Tain, J. Agramunt, et al, BRIKEN Z scan 
Scanning of the BRIKEN detector with the 252Cf source 
along the longitudinal axis (Z axis)

Measurements from Z: -42.5cm to 42.5cm with steps of 2.5cm. 
Entry  Sun Nov 6 03:12:55 2016, Alvaro,Jorge, Overnight measurement 
Measurement during beam production
and measurement with F7 CH2 out, 
F11 C-tar in/out, F7 CH2 in C-target out/in

START: 02:45
STOP: 12:47

ROOT file: 161106_1247_Overnight.root
Entry  Thu Nov 3 05:27:48 2016, Alvaro, Tain, Gabor, Ale, 152Eu  161103_1426_152Eu.root
Energy calibration for clovers, 152Eu



The Eu source positioned in the center roughly. 
File name: 161103_1426_152Eu.root
Entry  Mon Nov 7 13:11:42 2016, Alvaro, Ale, Jose, Jorge, New directory and Config file 161107Conf_BrikenFull.xlsx
For second part of Takechi's run:

Directory: /data/1611Commissioning/161107Parasitic
Config File: 161107Conf_BrikenFull.xlsx
Entry  Mon Nov 7 13:15:07 2016, Alvaro, Ale, Jorge, Jose, Background 161108_0751_Overnight_BRIKEN.pdf
Background measurement overnight.

Start: 23:27 (07/11/2016)
Stop: 07:52 (08/11/2016)
ROOT file: 161108_0751_Overnight.root


The spectra have a terrible aspect!

This is consequence of DACQ crashing because LN2 filling!
Entry  Mon Nov 7 13:44:26 2016, Alvaro, Ale, Jorge, Jose, Running Gasific and run protocol GasificShort.pdf
Preliminary
Entry  Tue Oct 18 09:36:07 2016, Alvaro Tolosa, 2016-Oct, Logbook 16Oct_logbook.pdf
Paper logbook for October-2016
For correct visualization, 
please download it.
Entry  Tue Oct 18 09:41:43 2016, Alvaro Tolosa, 2016 - July, Logbook 16Jul_logbook.pdf
Paper logbook for July-2016
For correct visualization, 
please download it.
Entry  Tue Nov 1 09:27:02 2016, Alvaro Tolosa, CLOVER cloversEff.xlscloversEff.ods
Efficiency calibration

File "cloversEff.ods" and "cloversEff.xls" contains the experimental efficiency from different measurements
during July and October
(G7 broke before Eu-152 measurement). We can assume the efficiency didn't change from July measurements to
October measurements. 
Entry  Thu Nov 3 04:46:24 2016, Alvaro Tolosa, 252Cf 161103_1319_252Cf.root
Check of BRIKEN calibration and thresholds

Source more or less at the center

Online File: 161103_1319_252Cf.root
Entry  Fri Oct 14 14:06:38 2016, All, First measurement of BRIKEN and AIDA 161014Conf_BrikenFull.xlsx
Friday, October 14, 2016 21:50
AIDA and BRIKEN-CLOVER run with a common clock.

After installing the shielding and checking electronics
(See next entry)

252Cf source 7.5cm from the center.
AIDA nose aligned with the edge of the clovers hole.

start: 21:50 run number: BRIKEN:15 AIDA:0 
stop : 22:18 run number: BRIKEN:16 AIDA:9

BRIKEN dlt file:252CfWithAida75mmcenter_15 to _16
AIDA file: aidas1:/TapeDate/Sept2016/R41_0 to _9 

Online analyzed data around 30%
Online spec: 252CfWithAida75mmcenter_15_16.root
Configuration file attached.
Entry  Sun Oct 16 12:58:34 2016, All, BRIKEN Shielding-BRIKEN-AIDA.jpgShielding-BRIKEN.jpgShieldingPlates.jpg
Installation of BRIKEN PE shielding for beam
related neutrons

The missing metallic pieces needed to mount
the forward PE shielding finally arrive and
we mount it with help of the crane.

The shielding (4 PE slabs + 1Cd-PE slab) has attached 
the support for VETO detectors on the beam side
and for and additional ancillary detector
a large Si detector on the BRIKEN side.
See attached photos.

The distance between shielding and BRIKEN is 40 cm.
Entry  Sun Oct 16 13:30:43 2016, All, END Sashimi.jpg
... and sashimi (see photo)

The detectors (BRIKEN tubes, CLOVER, VETO detectors, AIDA) 
are mounted, tested and ready for November commissioning,
except beam detectors a Plastic TOF and a Si detector which
will be attached to the PE shielding.
DACQs (BRIKEN, AIDA) are running. The synchronization monitoring
program which was working in June, for some reason is not functioning
properly now and is being worked on (desirable but not required).
The data merger and near-line analysis programs are being worked on.
Entry  Thu Nov 3 04:40:02 2016, All, START 161103Conf_BrikenFull.xlsx
Start of commissioning preparation


Working directory:
/data/1611Commissioning/161031Preparation/


DACQ configuration file:
161103Conf_BrikenFull.xlsx
Entry  Sun Apr 2 16:18:57 2017, All, END OF PARASITIC RUN 
 
Entry  Fri Oct 31 09:47:59 2014, Alfredo Estrade, BRIKEN elog: Hello world! 

A elog for the setup of the BRIKEN detector is now operational at https://elog.ph.ed.ac.uk/BRIKEN/

 
We have setup a list of emails that will receive automatic updates for each new entry to the elog:
 
C. Domingo, G. Lorusso, T. Davinson, A. Estrade, K. Rykaczewski, J.L. Tain, C. Griffin, S. Nishimura, I. Dillman, F. Montes, J. Agramunt, G. Cortes, F. Calvino, M. Marta
 
Please let us know about any other person that would like to be included in this list, or if you would like your email to be removed from it (should the new entries be too frequent for your inbox traffic!).
 
Entry  Fri Oct 31 11:36:57 2014, Alfredo Estrade, BRIKEN elog: take 2 

A elog for the setup of the BRIKEN detector is now operational at https://elog.ph.ed.ac.uk/BRIKEN/


We have setup a list of emails that will receive automatic updates for each new entry to the logbook: C. Domingo, G. Lorusso, T. Davinson, A. Estrade, K. Rykaczewski, J.L. Tain, C. Griffin, S. Nishimura, I. Dillman, F. Montes, J. Agramunt, G. Cortes, F. Calvino, M. Marta

 
Please let us know the contact info for any other person that would like to be included in this list, or if you would like your email to be removed from it (should the new entries be too frequent for your inbox traffic!).
Entry  Mon Nov 7 02:39:55 2016, Ale, Photo of the white board with the details on the cards and preamps at B1F New_Doc_160_2.pdf
Photo of the white board with the details on the cards and preamps at B1F
Entry  Mon Nov 7 05:36:20 2016, Ale, new calibration for F11 
new calibration for F11

Using a value of 70 MeV energy loss and the file 161107_0833_Overnight.root
We obtained new peak positions: for V1A7C3 peak at 5398 (F11 right), for V1A7C4 (F11 left) peak at 6060

F11_rigth (V1A7C3): 0.01297
F11_left (V1A7C4): 0.01155
ELOG V3.1.3-7933898