  327   Wed Jun 14 06:22:21 2017 Ariel, Liu, Go, NishinmuraHV is off

To protect HPGe and 3He tubes from high intentsity primary beam, HV of these detector are off and the HPGe will be dismounted.

  79   Wed Oct 12 11:30:53 2016 Ariel Tarifeno, Alvaro Toloza, JL Tain, J. Agramunt, et alBRIKEN Z scan
Scanning of the BRIKEN detector with the 252Cf source 
along the longitudinal axis (Z axis)

Measurements from Z: -42.5cm to 42.5cm with steps of 2.5cm. 
  117   Sun Nov 6 03:12:55 2016 Alvaro,JorgeOvernight measurement
Measurement during beam production
and measurement with F7 CH2 out, 
F11 C-tar in/out, F7 CH2 in C-target out/in

START: 02:45
STOP: 12:47

ROOT file: 161106_1247_Overnight.root
  103   Thu Nov 3 05:27:48 2016 Alvaro, Tain, Gabor, Ale152Eu
Energy calibration for clovers, 152Eu



The Eu source positioned in the center roughly. 
File name: 161103_1426_152Eu.root
Attachment 1: 161103_1426_152Eu.root
  129   Mon Nov 7 13:11:42 2016 Alvaro, Ale, Jose, JorgeNew directory and Config file
For second part of Takechi's run:

Directory: /data/1611Commissioning/161107Parasitic
Config File: 161107Conf_BrikenFull.xlsx
Attachment 1: 161107Conf_BrikenFull.xlsx
  130   Mon Nov 7 13:15:07 2016 Alvaro, Ale, Jorge, JoseBackground
Background measurement overnight.

Start: 23:27 (07/11/2016)
Stop: 07:52 (08/11/2016)
ROOT file: 161108_0751_Overnight.root


The spectra have a terrible aspect!

This is consequence of DACQ crashing because LN2 filling!
Attachment 1: 161108_0751_Overnight_BRIKEN.pdf
161108_0751_Overnight_BRIKEN.pdf
  131   Mon Nov 7 13:44:26 2016 Alvaro, Ale, Jorge, JoseRunning Gasific and run protocol
Preliminary
Attachment 1: GasificShort.pdf
GasificShort.pdf GasificShort.pdf GasificShort.pdf GasificShort.pdf
  93   Tue Oct 18 09:36:07 2016 Alvaro Tolosa2016-Oct, Logbook
Paper logbook for October-2016
For correct visualization, 
please download it.
Attachment 1: 16Oct_logbook.pdf
16Oct_logbook.pdf 16Oct_logbook.pdf 16Oct_logbook.pdf 16Oct_logbook.pdf 16Oct_logbook.pdf 16Oct_logbook.pdf 16Oct_logbook.pdf 16Oct_logbook.pdf
  94   Tue Oct 18 09:41:43 2016 Alvaro Tolosa2016 - July, Logbook
Paper logbook for July-2016
For correct visualization, 
please download it.
Attachment 1: 16Jul_logbook.pdf
16Jul_logbook.pdf 16Jul_logbook.pdf 16Jul_logbook.pdf 16Jul_logbook.pdf 16Jul_logbook.pdf 16Jul_logbook.pdf 16Jul_logbook.pdf 16Jul_logbook.pdf
  96   Tue Nov 1 09:27:02 2016 Alvaro TolosaCLOVER
Efficiency calibration

File "cloversEff.ods" and "cloversEff.xls" contains the experimental efficiency from different measurements
during July and October
(G7 broke before Eu-152 measurement). We can assume the efficiency didn't change from July measurements to
October measurements. 
Attachment 1: cloversEff.xls
Attachment 2: cloversEff.ods
  102   Thu Nov 3 04:46:24 2016 Alvaro Tolosa252Cf
Check of BRIKEN calibration and thresholds

Source more or less at the center

Online File: 161103_1319_252Cf.root
Attachment 1: 161103_1319_252Cf.root
  89   Fri Oct 14 14:06:38 2016 AllFirst measurement of BRIKEN and AIDA
Friday, October 14, 2016 21:50
AIDA and BRIKEN-CLOVER run with a common clock.

After installing the shielding and checking electronics
(See next entry)

252Cf source 7.5cm from the center.
AIDA nose aligned with the edge of the clovers hole.

start: 21:50 run number: BRIKEN:15 AIDA:0 
stop : 22:18 run number: BRIKEN:16 AIDA:9

BRIKEN dlt file:252CfWithAida75mmcenter_15 to _16
AIDA file: aidas1:/TapeDate/Sept2016/R41_0 to _9 

Online analyzed data around 30%
Online spec: 252CfWithAida75mmcenter_15_16.root
Configuration file attached.
Attachment 1: 161014Conf_BrikenFull.xlsx
  90   Sun Oct 16 12:58:34 2016 AllBRIKEN
Installation of BRIKEN PE shielding for beam
related neutrons

The missing metallic pieces needed to mount
the forward PE shielding finally arrive and
we mount it with help of the crane.

The shielding (4 PE slabs + 1Cd-PE slab) has attached 
the support for VETO detectors on the beam side
and for and additional ancillary detector
a large Si detector on the BRIKEN side.
See attached photos.

The distance between shielding and BRIKEN is 40 cm.
Attachment 1: Shielding-BRIKEN-AIDA.jpg
Shielding-BRIKEN-AIDA.jpg
Attachment 2: Shielding-BRIKEN.jpg
Shielding-BRIKEN.jpg
Attachment 3: ShieldingPlates.jpg
ShieldingPlates.jpg
  91   Sun Oct 16 13:30:43 2016 AllEND
... and sashimi (see photo)

The detectors (BRIKEN tubes, CLOVER, VETO detectors, AIDA) 
are mounted, tested and ready for November commissioning,
except beam detectors a Plastic TOF and a Si detector which
will be attached to the PE shielding.
DACQs (BRIKEN, AIDA) are running. The synchronization monitoring
program which was working in June, for some reason is not functioning
properly now and is being worked on (desirable but not required).
The data merger and near-line analysis programs are being worked on.
Attachment 1: Sashimi.jpg
Sashimi.jpg
  101   Thu Nov 3 04:40:02 2016 AllSTART
Start of commissioning preparation


Working directory:
/data/1611Commissioning/161031Preparation/


DACQ configuration file:
161103Conf_BrikenFull.xlsx
Attachment 1: 161103Conf_BrikenFull.xlsx
  292   Sun Apr 2 16:18:57 2017 AllEND OF PARASITIC RUN
  1   Fri Oct 31 09:47:59 2014 Alfredo EstradeBRIKEN elog: Hello world!

A elog for the setup of the BRIKEN detector is now operational at https://elog.ph.ed.ac.uk/BRIKEN/

 
We have setup a list of emails that will receive automatic updates for each new entry to the elog:
 
C. Domingo, G. Lorusso, T. Davinson, A. Estrade, K. Rykaczewski, J.L. Tain, C. Griffin, S. Nishimura, I. Dillman, F. Montes, J. Agramunt, G. Cortes, F. Calvino, M. Marta
 
Please let us know about any other person that would like to be included in this list, or if you would like your email to be removed from it (should the new entries be too frequent for your inbox traffic!).
 
  2   Fri Oct 31 11:36:57 2014 Alfredo EstradeBRIKEN elog: take 2

A elog for the setup of the BRIKEN detector is now operational at https://elog.ph.ed.ac.uk/BRIKEN/


We have setup a list of emails that will receive automatic updates for each new entry to the logbook: C. Domingo, G. Lorusso, T. Davinson, A. Estrade, K. Rykaczewski, J.L. Tain, C. Griffin, S. Nishimura, I. Dillman, F. Montes, J. Agramunt, G. Cortes, F. Calvino, M. Marta

 
Please let us know the contact info for any other person that would like to be included in this list, or if you would like your email to be removed from it (should the new entries be too frequent for your inbox traffic!).
  122   Mon Nov 7 02:39:55 2016 AlePhoto of the white board with the details on the cards and preamps at B1F
Photo of the white board with the details on the cards and preamps at B1F
Attachment 1: New_Doc_160_2.pdf
New_Doc_160_2.pdf
  125   Mon Nov 7 05:36:20 2016 Alenew calibration for F11
new calibration for F11

Using a value of 70 MeV energy loss and the file 161107_0833_Overnight.root
We obtained new peak positions: for V1A7C3 peak at 5398 (F11 right), for V1A7C4 (F11 left) peak at 6060

F11_rigth (V1A7C3): 0.01297
F11_left (V1A7C4): 0.01155