327
|
Wed Jun 14 06:22:21 2017 |
Ariel, Liu, Go, Nishinmura | HV is off | To protect HPGe and 3He tubes from high
intentsity primary beam, HV of these detector
are off and the HPGe will be dismounted. |
|
|
79
|
Wed Oct 12 11:30:53 2016 |
Ariel Tarifeno, Alvaro Toloza, JL Tain, J. Agramunt, et al | BRIKEN Z scan | Scanning of the BRIKEN detector with the 252Cf
source
along the longitudinal axis (Z axis)
|
|
|
117
|
Sun Nov 6 03:12:55 2016 |
Alvaro,Jorge | Overnight measurement | Measurement during beam production
and measurement with F7 CH2 out,
F11 C-tar in/out, F7 CH2 in C-target out/in
|
|
|
103
|
Thu Nov 3 05:27:48 2016 |
Alvaro, Tain, Gabor, Ale | 152Eu | Energy calibration for clovers, 152Eu
|
|
|
129
|
Mon Nov 7 13:11:42 2016 |
Alvaro, Ale, Jose, Jorge | New directory and Config file | For second part of Takechi's run:
Directory: /data/1611Commissioning/161107Parasitic
|
|
|
130
|
Mon Nov 7 13:15:07 2016 |
Alvaro, Ale, Jorge, Jose | Background | Background measurement overnight.
Start: 23:27 (07/11/2016)
|
|
|
131
|
Mon Nov 7 13:44:26 2016 |
Alvaro, Ale, Jorge, Jose | Running Gasific and run protocol | Preliminary |
|
|
93
|
Tue Oct 18 09:36:07 2016 |
Alvaro Tolosa | 2016-Oct, Logbook | Paper logbook for October-2016
For correct visualization,
please download it. |
|
|
94
|
Tue Oct 18 09:41:43 2016 |
Alvaro Tolosa | 2016 - July, Logbook | Paper logbook for July-2016
For correct visualization,
please download it. |
|
|
96
|
Tue Nov 1 09:27:02 2016 |
Alvaro Tolosa | CLOVER | Efficiency calibration
File "cloversEff.ods" and "cloversEff.xls" |
 |
|
102
|
Thu Nov 3 04:46:24 2016 |
Alvaro Tolosa | 252Cf | Check of BRIKEN calibration and thresholds
Source more or less at the center
|
|
|
89
|
Fri Oct 14 14:06:38 2016 |
All | First measurement of BRIKEN and AIDA | Friday, October 14, 2016 21:50
AIDA and BRIKEN-CLOVER run with a common
clock.
|
|
|
90
|
Sun Oct 16 12:58:34 2016 |
All | BRIKEN | Installation of BRIKEN PE shielding for beam
related neutrons
|
  |
|
91
|
Sun Oct 16 13:30:43 2016 |
All | END | ... and sashimi (see photo)
The detectors (BRIKEN tubes, CLOVER, VETO |
|
|
101
|
Thu Nov 3 04:40:02 2016 |
All | START | Start of commissioning preparation
|
|
|
292
|
Sun Apr 2 16:18:57 2017 |
All | END OF PARASITIC RUN | |
|
|
1
|
Fri Oct 31 09:47:59 2014 |
Alfredo Estrade | BRIKEN elog: Hello world! | A elog for the setup of the BRIKEN detector
is now operational at https://elog.ph.ed.ac.uk/BRIKEN/
We have setup |
|
|
2
|
Fri Oct 31 11:36:57 2014 |
Alfredo Estrade | BRIKEN elog: take 2 | A elog for the setup of the
BRIKEN detector is now operational at |
|
|
122
|
Mon Nov 7 02:39:55 2016 |
Ale | Photo of the white board with the details on the cards and preamps at B1F | Photo of the white board with the details
on the cards and preamps at B1F |
|
|
125
|
Mon Nov 7 05:36:20 2016 |
Ale | new calibration for F11 | new calibration for F11
Using a value of 70 MeV energy loss and the |
|