AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 16 of 21  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
  ID Date Authordown Subject Text Attachments
  327   Wed Jun 14 06:22:21 2017 Ariel, Liu, Go, NishinmuraHV is offTo protect HPGe and 3He tubes from high
intentsity primary beam, HV of these detector
are off and the HPGe will be dismounted.
  
  79   Wed Oct 12 11:30:53 2016 Ariel Tarifeno, Alvaro Toloza, JL Tain, J. Agramunt, et alBRIKEN Z scanScanning of the BRIKEN detector with the 252Cf
source 
along the longitudinal axis (Z axis)
  
  117   Sun Nov 6 03:12:55 2016 Alvaro,JorgeOvernight measurementMeasurement during beam production
and measurement with F7 CH2 out, 
F11 C-tar in/out, F7 CH2 in C-target out/in
  
  103   Thu Nov 3 05:27:48 2016 Alvaro, Tain, Gabor, Ale152Eu Energy calibration for clovers, 152Eu

 161103_1426_152Eu.root 
  129   Mon Nov 7 13:11:42 2016 Alvaro, Ale, Jose, JorgeNew directory and Config fileFor second part of Takechi's run:

Directory: /data/1611Commissioning/161107Parasitic
 161107Conf_BrikenFull.xlsx 
  130   Mon Nov 7 13:15:07 2016 Alvaro, Ale, Jorge, JoseBackgroundBackground measurement overnight.

Start: 23:27 (07/11/2016)
 161108_0751_Overnight_BRIKEN.pdf 
  131   Mon Nov 7 13:44:26 2016 Alvaro, Ale, Jorge, JoseRunning Gasific and run protocolPreliminary  GasificShort.pdf 
  93   Tue Oct 18 09:36:07 2016 Alvaro Tolosa2016-Oct, LogbookPaper logbook for October-2016
For correct visualization, 
please download it.
 16Oct_logbook.pdf 
  94   Tue Oct 18 09:41:43 2016 Alvaro Tolosa2016 - July, LogbookPaper logbook for July-2016
For correct visualization, 
please download it.
 16Jul_logbook.pdf 
  96   Tue Nov 1 09:27:02 2016 Alvaro TolosaCLOVEREfficiency calibration

File "cloversEff.ods" and "cloversEff.xls"
 cloversEff.xlscloversEff.ods 
  102   Thu Nov 3 04:46:24 2016 Alvaro Tolosa252CfCheck of BRIKEN calibration and thresholds

Source more or less at the center
 161103_1319_252Cf.root 
  89   Fri Oct 14 14:06:38 2016 AllFirst measurement of BRIKEN and AIDAFriday, October 14, 2016 21:50
AIDA and BRIKEN-CLOVER run with a common
clock.
 161014Conf_BrikenFull.xlsx 
  90   Sun Oct 16 12:58:34 2016 AllBRIKENInstallation of BRIKEN PE shielding for beam
related neutrons
 Shielding-BRIKEN-AIDA.jpgShielding-BRIKEN.jpgShieldingPlates.jpg 
  91   Sun Oct 16 13:30:43 2016 AllEND... and sashimi (see photo)

The detectors (BRIKEN tubes, CLOVER, VETO
 Sashimi.jpg 
  101   Thu Nov 3 04:40:02 2016 AllSTARTStart of commissioning preparation

 161103Conf_BrikenFull.xlsx 
  292   Sun Apr 2 16:18:57 2017 AllEND OF PARASITIC RUN    
  1   Fri Oct 31 09:47:59 2014 Alfredo EstradeBRIKEN elog: Hello world!A elog for the setup of the BRIKEN detector
is now operational at https://elog.ph.ed.ac.uk/BRIKEN/
 
We have setup
  
  2   Fri Oct 31 11:36:57 2014 Alfredo EstradeBRIKEN elog: take 2A elog for the setup of the
BRIKEN detector is now operational at 
  
  122   Mon Nov 7 02:39:55 2016 AlePhoto of the white board with the details on the cards and preamps at B1FPhoto of the white board with the details
on the cards and preamps at B1F
 New_Doc_160_2.pdf 
  125   Mon Nov 7 05:36:20 2016 Alenew calibration for F11new calibration for F11

Using a value of 70 MeV energy loss and the
  
ELOG V3.1.4-unknown